Permanent Occupancy | | | 4/16/2018 | | DONE |
|
|
|
|
BLD-Final | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
PubWorks Occupancy Approval | 4/11/2018 | 4/11/2018 | 4/11/2018 | | DONE |
Tiffany Lowery
|
|
|
|
Temporary Occupancy | 4/6/2018 | 7/5/2018 | 4/6/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason B ok'd 45 day ext
|
Zoning Approval | 4/2/2018 | 4/2/2018 | 4/2/2018 | | PASS |
Katelyn Menuge
|
|
|
Final
|
BLD-Final | 2/14/2018 | 2/14/2018 | 2/14/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. Temp occ. Will be for perm occ. once zoning signs perm.
|
BLD-Final | 2/5/2018 | 2/6/2018 | 2/6/2018 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Conference | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Final | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Final | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PART |
Mike Jordan
|
|
|
Please accommodate a 10:30 inspection. Fire final is scheduled for 10 o''clock. Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for temp occ. Needs to provide 5/8 type x rock at HVac ductwork in garage and repair 1 hr. walls.
|
FIRE-Final Inspection | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
Temporary Occupancy | 2/2/2018 | 5/3/2018 | 2/2/2018 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 1/31/2018 | 2/1/2018 | 2/1/2018 | A | FAIL |
Troy Cobbley
|
|
|
Need smoke alarms to be located atleast 3' from fan blades and re-tested, need fees paid and inspection called in for the project related fire alarm permit. Need paint removed from the FDC.
|
BLD-Final | 1/31/2018 | 2/1/2018 | 2/1/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. Needs plumbing, life safety and fire finals
|
PubWorks Temp Occupancy Appr | 1/23/2018 | 1/23/2018 | 1/23/2018 | | DONE |
Tiffany Lowery
|
|
|
|
Print Occupancy Form | | | 1/16/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/12/2017 | | DONE |
|
|
|
|
Zoning Approval Temp | 12/11/2017 | 12/11/2017 | 12/11/2017 | | PASS |
Katelyn Menuge
|
|
|
Temporary Approval- Bonding under BND17-00115 for landscape, fencing, trash enclosure and striping.
|
BLD-Framing/Rough-in | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 11/15/2017 | 11/16/2017 | 11/16/2017 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by david scaggs. Repair all holes, f complete fire caulking and complete install of sheetrock on fire partition in attics. Provide fix from joist manufacturer for all cut top chords on floor joist and repair. Install bracing on top chords of trusses at over builds were roof sheathing has been left off.
|
BLD-Framing/Rough-in | 11/9/2017 | 11/13/2017 | 11/12/2017 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by david scaggs Inspection cancelled from web by: david scaggs
|
BLD-Wall Bracing | 9/20/2017 | 9/20/2017 | 9/20/2017 | A | PASS |
Mike Jordan
|
|
|
Exterior Shear Inspection requested via web by Marty Short
|
Plan Modification Accepted | | | 9/13/2017 | | DONE |
|
|
|
new manual j reports for duplex, 4 plex and 6 plex
|
Routing - MECHANICAL | 9/13/2017 | | 9/13/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report for duplex, 4 plex and 6 plex. The 6 plex is new report, originally designed by mechanical engineer.
|
BLD-Concrete | 7/20/2017 | 7/20/2017 | 7/20/2017 | P | PASS |
Mike Jordan
|
|
|
Garage int footings Inspection requested via web by Marty Short
|
BLD-Concrete | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | PASS |
Mike Jordan
|
|
|
Int footings. Concrete is scheduled for 8am Inspection requested via web by Marty Short
|
BLD-Energy code compliance | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | PASS |
Mike Jordan
|
|
|
Rigid insulation Inspection requested via web by Marty Short
|
Issue PAID IN FULL permit | | | 6/28/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/28/2017 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 6/14/2017 | | DONE |
|
|
|
Spoke with Dave informing him that this permit is 17 days past its expiration. Stated I have noticed that it had resubmittals turned but would recommend sending in for an extension if not ready to pick up
|
Plan assigned to (CDM) | 12/7/2016 | 12/7/2016 | 6/13/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp. Marena Apartments
|
Routing - PLAN CHECK | 3/24/2017 | | 6/13/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/13/2017 | | DONE |
Christina Prado
|
|
|
All requirements met - ACHD & ESC under BLD17-01176 Foundation Only permit
|
Routing - MECHANICAL | 6/9/2017 | | 6/9/2017 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 6/1/2017 | | 6/1/2017 | | FAIL |
Troy James
|
|
|
Need to revise comcheck to reflect changes in equipment design
|
Routing Off Site - STRUCTURAL | 3/24/2017 | | 6/1/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Solid Waste | 3/24/2017 | | 6/1/2017 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/27/2017 | | 6/1/2017 | | PASS |
Carl D Madsen
|
|
|
|
Telephone call | | | 5/19/2017 | | DONE |
|
|
|
Left a message for Dave informing him that this permit is going to expire in 10 days and if he would like he may send in a request for a 180 day extension. Informed him that it is showing a plan modification was turned, but the date is based of the intake date. Left email and phone number if he had any questions
|
Expiration Notice | 5/3/2017 | 5/24/2017 | 5/3/2017 | | DONE |
Brittany Hill
|
|
|
|
Routing - MECHANICAL | 4/25/2017 | | 4/25/2017 | | PASS |
Troy James
|
|
|
approved duplex and four plex only
|
Routing - Erosion and Sediment | 4/20/2017 | | 4/20/2017 | | PASS |
Andy J. Long
|
|
|
SWPPP previously submitted to be used. Granite Excavation and Summit Development are responsble for City of Boise ESC permit conditions and CGP compliance.
|
Routing - Design Review | 3/24/2017 | | 4/12/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH17-00088.
|
Routing - Erosion and Sediment | 3/24/2017 | | 3/30/2017 | | FAIL |
Andy J. Long
|
|
|
No new site and construction phase specific ESC plan narrative provided as requested in first review. Please call ###-#### if there are questions.
|
Routing - MECHANICAL | 3/24/2017 | | 3/27/2017 | | FAIL |
Troy James
|
|
|
Previous comments have not been addressed.
|
Routing Off Site - STRUCTURAL | 3/2/2017 | | 3/10/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 3/2/2017 | | 3/10/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 3/2/2017 | | 3/8/2017 | | FAIL |
Troy James
|
|
|
Talked to engineer about corrections.
|
Routing - Design Review | 3/2/2017 | | 3/7/2017 | | FAIL |
Sarah Schafer
|
|
|
The following changes are required:
Modification required for changes to building materials.
Bike racks need to be shown on improved surface.
Additional trees in planters and along Preece
Left message for applicant today.
|
Routing PW Solid Waste | 3/2/2017 | | 3/6/2017 | | FAIL |
Evan Carpenter
|
|
|
Southern enclosure inaccessible to collection vehicle due to excessive backing required once dumpsters are serviced. Vehicle should not be required to back up more than 75'.
|
Routing - FIRE | 3/2/2017 | 3/2/2017 | 3/3/2017 | | PASS |
Scott Arellano
|
|
|
Revised report attached to case.
|
Routing - PLUMBING | 3/2/2017 | | 3/3/2017 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 3/2/2017 | | 3/2/2017 | | PASS |
Morgan Webb
|
|
|
|
Route to Impact Fee Review | 1/5/2017 | 1/8/2017 | 1/9/2017 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 1/5/2017 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 12/7/2016 | | 1/5/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 12/7/2016 | | 1/5/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Solid Waste | 12/7/2016 | | 12/12/2016 | | FAIL |
Evan Carpenter
|
|
|
The current enclosure locations are inaccessible to collection vehicles due to the excessive backing required once the dumpsters are serviced. The enclosure needs to be located where minimal backing is required by the collection vehicle.
|
Routing PW Street Lights | 12/7/2016 | | 12/12/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing - Erosion and Sediment | 12/7/2016 | | 12/12/2016 | | FAIL |
Andy J. Long
|
|
|
No ESC Plan narrative for vertical construction; please provide narrative to accompany the site map. Need to provide RP for vertical construction after Granite Excavation is done. See ESC16-01189 for site devopment permit.
|
Routing - MECHANICAL | 12/7/2016 | | 12/12/2016 | | FAIL |
Troy James
|
|
|
|
Routing - FIRE | 12/7/2016 | 12/7/2016 | 12/9/2016 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - Addressing | 12/7/2016 | | 12/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PLUMBING | 12/7/2016 | | 12/8/2016 | | FAIL |
Bill VanDegrift
|
|
|
fourplex
1) reference Idaho State Plumbing Code
2) condensate ant T&P piping shall not be directly imbedded in concrete
3) provide Suez Water required double check backflow preventer
4) minimum below grade waste piping is 2"
5) minimum wet vent at the washer box is 2 1/2"
6) thermol expansion protection required
Duplex
7) provide plans for the duplex
sixplex ok
|
Routing - Design Review | 12/7/2016 | | 12/8/2016 | | FAIL |
Josh Wilson
|
|
|
Changemarks in Eplan.
|
Routing - PLANNING | 12/7/2016 | | 12/7/2016 | | PASS |
Cody Riddle
|
|
|
|
Routing - PLANNING Land Div | 12/7/2016 | | 12/7/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - PUBLIC WORKS | 12/7/2016 | | 12/7/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 12/7/2016 | | 12/7/2016 | | PASS |
Brian Murphy
|
|
|
APPROVED GRADING PERMIT
|
Intake Approval | | | 12/7/2016 | | PASS |
|
|
|
|
Intake Approval | | | 12/1/2016 | | FAIL |
|
|
|
1st Pre-screen 12/1/16 Carl Madsen ###-####. Please address the following items.
1. All architectural plan sheets are required to be stamped by the Architect.
2. The code analysis is to include the individual building areas, area per story, allowable building area calculations, occupant lard per building, number of units, type of construction
3. All structural sheets including the roof framing plan are required to be stamped by the engineer.
|
Application received | | | 11/29/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 29 2016 10:46AM
|
First Notice | | 4/26/2018 | | | |
|
|
|
|