Description
(MARINA APARTMENTS) (10 PERMITS TOTAL FILED UNDER BLD16-04308 IN EPLANREVIEW) For the construction of a 3,680 sq. ft. 2 story 4 plex with work to include general site work and construction of the building per the approved plans. This building is fully fire sprinklered for R-2 occupancy. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval4/16/20184/16/20184/16/2018 DONE
DetailsTiffany Lowery
Permanent Occupancy  4/16/2018 DONE
BLD-Final4/11/20184/11/20184/11/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs
Temporary Occupancy4/6/20187/5/20184/6/2018 DONE
DetailsCandy A. Nichols
Jason B ok'd 45 day extension from 3/21/18
Zoning Approval4/2/20184/2/20184/2/2018 PASS
DetailsKatelyn Menuge
Final
Telephone call  3/21/2018 DONE
called Dave to let know temp c of o has expired-left message that he needs the finals scheduled or request an extension with Jason B
BLD-Aging Inspection2/20/20182/20/20182/20/2018 PEND
DetailsMike Jordan
BLD-Final12/20/201712/21/201712/21/2017PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for temp occ. Will be ok for perm occ. once zoning and public works signs perm.
FIRE-Final Inspection12/20/201712/21/201712/21/2017PPASS
DetailsTroy Cobbley
Life safety passed

Phone #: ###-#### Inspection requested via web by David Scaggs
Temporary Occupancy12/21/20173/21/201812/21/2017 DONE
DetailsChristina Prado
Zoning Approval Temp12/14/201712/14/201712/14/2017 DONE
DetailsKatelyn Menuge
Temp
PubWorks Temp Occupancy Appr12/14/201712/14/201712/14/2017 DONE
DetailsTiffany Lowery
Print Occupancy Form  12/12/2017 DONE
BLD-Energy code compliance10/13/201710/16/201710/16/2017APASS
DetailsMike Jordan
Dave Phone #: ###-####
BLD-Framing/Rough-in10/12/201710/12/201710/12/2017PPASS
DetailsMike Jordan
Dave Phone #: ###-####
BLD-Wall Bracing7/5/20177/5/20177/5/2017PPASS
DetailsMike Jordan
Shear // Marty Phone #: ###-####
BLD-Wall Bracing6/27/20176/27/20176/27/2017PFAIL
DetailsMike Jordan
Marty Phone #: ###-####. Provide RFI from engineer showing that the STDH 14 holdowns are adequate in leiu of the holddowns shown on approved plans. Shhet S2.2 notes that staples shall not be substituted for nails ot shear wall locations. Missing one holddown. Correction notice put with approved plans.
BLD-Footing6/9/20176/9/20176/9/2017PPASS
DetailsBrandon Shaw
Marty Phone #: ###-####
BLD-Footing6/8/20176/8/20176/8/2017PFAIL
DetailsDave Hannah
Marty Phone #: ###-#### as per plans ftgs should be 24x10 they are not
BLD-Energy code compliance6/6/20176/6/20176/6/2017PPASS
DetailsMike Jordan
Marty Phone #: ###-####. Rigid insulation on stemwalls interior side under slab on grade.
BLD-Foundation5/25/20175/25/20175/25/2017PPASS
DetailsMike Jordan
Marty Short Phone #: ###-####
BLD-Footing5/19/20175/22/20175/22/2017APASS
DetailsMike Jordan
Marty Phone #: ###-####
Issue PAID IN FULL permit  5/9/2017 DONE
DetailsChristina Prado
Inspection Record Card- Bld  5/9/2017 DONE
DetailsChristina Prado
Print Occupancy Form  5/9/2017 DONE
DetailsChristina Prado
Expiration Notice5/3/20175/24/20175/3/2017 DONE
DetailsBrittany Hill
Plan assigned to (CDM)12/7/201612/7/20164/25/2017 PASS
DetailsCarl D Madsen
1st comp. Marina Apartments
Routing - PLANNING Land Div12/7/2016 4/25/2017 PASS
DetailsTodd Tucker
Routing - Erosion and Sediment12/7/2016 4/25/2017 PASS
DetailsAndy J. Long
Routing - PLAN CHECK4/25/2017 4/25/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  4/25/2017 DONE
Permit Ready to Issue  4/25/2017 DONE
DetailsChristina Prado
Need GC form & RP for issuance
Routing - MECHANICAL3/2/2017 4/25/2017 PASS
DetailsTroy James
Routing - PLUMBING3/2/2017 4/25/2017 PASS
DetailsBill VanDegrift
Routing - PUBLIC WORKS3/2/2017 4/25/2017 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment3/2/2017 4/25/2017 PASS
DetailsAndy J. Long
Routing - Design Review4/12/2017 4/12/2017 PASS
DetailsSarah Schafer
Approved per DRH17-00088.
Routing Off Site - STRUCTURAL3/2/2017 3/10/2017 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK3/2/2017 3/10/2017 FAIL
DetailsCarl D Madsen
Routing - Design Review3/2/2017 3/7/2017 FAIL
DetailsSarah Schafer
The following changes are required:
Modification required for changes to building materials.
Bike racks need to be shown on improved surface.
Additional trees in planters and along Preece
Left message for applicant today.
Routing - FIRE3/2/20173/2/20173/3/2017 PASS
DetailsScott Arellano
Sufficient fire flow provided.
Routing - PUBLIC WORKS12/7/2016 3/2/2017 PASS
DetailsRachael Beierle
WEST BOISE SEWER DISTRICT
Route to Impact Fee Review1/5/20171/8/20171/9/2017 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK12/7/2016 1/5/2017 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL12/7/2016 1/5/2017 FAIL
DetailsCarl D Madsen
1st review completed  1/5/2017 FAIL
Routing - MECHANICAL12/7/2016 12/12/2016 FAIL
DetailsTroy James
Routing - FIRE12/7/201612/7/201612/9/2016 PASS
DetailsKatie Marron
No fire flow provided, will be requested under permit BLD16-04308. Comments attached to case.
Routing - Addressing12/7/2016 12/8/2016 PASS
DetailsLaura Hunter
Routing - PLUMBING12/7/2016 12/8/2016 FAIL
DetailsBill VanDegrift
Routing - Design Review12/7/2016 12/8/2016 FAIL
DetailsJosh Wilson
Changemarks in Eplan.
Routing - PLANNING12/7/2016 12/7/2016 PASS
DetailsCody Riddle
Intake Approval  12/7/2016 PASS
Application received  11/29/2016 DONE
Application submitted via PDS Online on Nov 29 2016 10:46AM
First Notice 4/26/2018