Permit Information
Permit NumberBLD16-04337
StatusFinaled
Name OKLAND CONSTRUCTION CO INC
Site Address 1000 E PARK BLVD
Project NamePark Boulevard MOB
Customer Number 
ePlanReviewYes
Description
(PARK BOULEVARD MEDICAL OFFICE BUILDING – SHELL) (DRH16-00397) (5-8-17 PLAN MODIFICATION TO REVISE THE ROOF STRUCTURE ABOVE THE SOUTH TENANT SPACE TO SUPPORT AN EQUIPMENT ENCLOSURE ON THE ROOF. WORK INCLUDES RELOCATING OR ADDING INTERIOR CONCRETE FOOTINGS; ALTERATIONS TO THE COLUMNS, BEAMS, AND JOISTS OF THE ROOF STRUCTURE; PLACING A CONCRETE MECHANICAL PAD ON TOP OF THE ROOF DECK; AND CONSTRUCTING A ROOF TOP MECHANICAL EQUIPMENT SCREEN WALL.) To construct a 27,972 square foot medical office building that will likely have 2 tenants. Work is to include concrete footings, concrete stem walls (concrete slabs on grade will be placed under a future permit), steel columns, steel beams, open web steel roof joists, steel roof deck for flat roofs, prefinished metal roofing for sloping roofs, metal stud exterior walls, Sureboard Series 200 shearwall sheathing attached to metal studs, fiberglass mat sheathing on the exterior side of metal stud walls, rigid insulation installed on top of the flat roof decks, single ply roof membranes, primary roof drains and secondary roof drains, concrete roof slab within the rooftop mechanical equipment screen enclosure, rooftop mechanical equipment screen walls, Exterior Insulation and Finish System (EIFS), thin brick exterior veneer, fiber cement exterior siding, exterior windows, exterior doors, automatic sliding doors with break-outs, a suspended acoustical ceiling within the lobby, gypsum soffits within the lobby, and lobby finishes. A generator will be installed in conjunction with this permit. Special Inspection is required for soils, concrete, steel construction including welding and bolting, post installed mechanical concrete anchors, post installed epoxy concrete anchors, and perhaps EIFS. The design for the open web steel roof joists is a deferred submittal item. If this medical building will be used as an Ambulatory Care Facility where individuals are incapable of self-preservation, full compliance with 2012 IBC Section 422 is required to be shown under the future tenant improvement permit applications. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This permit is NOT intended to establish a Certificate of Occupancy for any tenant. Separate tenant improvement permits are required to establish occupancy. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/15/20185/1/2018 DONE
Third Notice 3/19/20184/10/2018 DONE
mailed 4-11-18
Second Notice 2/22/20183/14/2018 DONE
mailed 3-15-18
First Notice 1/15/20182/12/2018 DONE
Mailed 2-13-18
Letter of compliance/Occupancy  1/8/2018 DONE
Letter of compliance/Occupancy  1/8/2018 DONE
Letter of compliance/Occupancy  1/5/2018 DONE
Inspection Record Card- Bld  1/5/2018 DONE
Letter of compliance/Occupancy  1/5/2018 DONE
DetailsChristina Prado
DOC - Permit Finaled  1/5/2018 DONE
BLD-Final1/2/20181/3/20181/3/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Jim Williams
FIRE-Final Inspection12/28/20171/2/20181/2/2018APASS
DetailsJim Page
Fire sprinkler inspection complete for core and shell, fire alarm inspection complete for core and shell, final life fire safety inspection for core and shell complete.
BLD-Final12/27/201712/28/201712/28/2017ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Energy code compliance12/21/201712/21/201712/21/2017APASS
DetailsDave Hannah
Good morning Dave.
I just wanted to do an inspection on the vapor barrier in the future St Luke''s TI and also talk to you about dry walling the exterior wall in this space down to the 10'' elevation. I will be in a meeting on another project until about 10:30. Thanks
Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
PubWorks Occupancy Approval12/4/201712/4/201712/4/2017 DONE
DetailsTiffany Lowery
Zoning Approval11/30/201711/30/201711/30/2017 PASS
DetailsSarah Schafer
BLD-Framing/Rough-in9/1/20179/1/20179/1/2017APASS
DetailsDave Hannah
Periodic Framing Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Framing/Rough-in8/23/20178/24/20178/24/2017APASS
DetailsDave Hannah
Framing, periodic inspection. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Wall cover7/27/20177/28/20177/28/2017APASS
DetailsDave Hannah
Exterior walls in ICRM TI for insulation and top down drywall. Air moisture barrier Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Framing/Rough-in6/20/20176/21/20176/21/2017APASS
DetailsDave Hannah
Exterior load bearing, shear wall and sheathing inspection Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Framing/Rough-in6/13/20176/13/20176/14/2017PPART
DetailsDave Hannah
Exterior wall framing for cover with exterior sheathing. welding header attachment etc. Phone #: ###-#### Inspection requested via web by Jim Williams screws for headers and sheer ok
CHANGE STATUS TO (ISS)  5/11/2017 DONE
plan mod issued
Inspection Record Card- Bld  5/11/2017 DONE
(F) Reprint permit  5/11/2017 DONE
OVERRIDE  5/8/2017  
Plan assigned to (CJW)3/24/20173/24/20175/8/2017 PASS
DetailsCarl Westfall
plan mod (2nd done)
Plan Reviewer's activity  5/8/2017 DONE
Plan mod reviewed and approved
Permit Ready to Issue  5/8/2017 DONE
all met, fees due;DO NOT RE ISSUE
Routing - PLAN CHECK4/25/2017 5/8/2017 PASS
DetailsCarl Westfall
Finished routing
Routing - Design Review4/25/2017 5/4/2017 PASS
DetailsSarah Schafer
Plan resubmittals requested  4/25/2017 DONE
Plan resubmittals received  4/25/2017 DONE
Routing Off Site - STRUCTURAL4/19/2017 4/24/2017 PASS
DetailsCarl Westfall
Jan Welch - Engineer of Record has indicated remaining issues will be resolved with field correspondence.
Routing - Design Review4/19/2017 4/20/2017 FAIL
DetailsSarah Schafer
Site plan show pedestrian ramps removed from walk ways and light poles in the middle of the side walks. This does not match the modification just processed through Design Review DRH17-00123.
Routing - PLAN CHECK4/18/2017 4/19/2017 PASS
DetailsCarl Westfall
Routing PW Sewer Design4/19/2017 4/19/2017 PASS
DetailsKyle S. Rosenmeyer
Routing PW Drainage4/19/2017 4/19/2017 PASS
DetailsBrian Murphy
Plan resubmittals received  4/18/2017 DONE
BLD-Footing4/4/20174/5/20174/11/2017APASS
DetailsDave Hannah
jim Phone #: ###-####
BLD-Footing4/11/20174/11/20174/11/2017PPASS
DetailsDave Hannah
would like call ahead; Jim Phone #: ###-####
Plan resubmittals requested  4/6/2017 DONE
Routing Off Site - STRUCTURAL3/25/2017 4/6/2017 FAIL
DetailsCarl Westfall
Jan Welch
Routing PW Sewer Design3/28/2017 3/28/2017 PASS
DetailsKyle S. Rosenmeyer
Revised sewer extension plan approved.
Routing - MECHANICAL3/25/2017 3/27/2017 PASS
DetailsTroy James
Routing - PLANNING3/25/2017 3/27/2017 PASS
DetailsCody Riddle
No review required
Routing - Design Review3/25/2017 3/25/2017 FAIL
DetailsJosh Wilson
Modification required. Changes to elevations and landscape plans.
Routing - PLAN CHECK3/24/2017 3/25/2017 PASS
DetailsCarl Westfall
Route to storm water and sewer design.
Plan Modification Accepted  3/24/2017 DONE
plan mod started in e plan
Issue PAID IN FULL permit  3/17/2017 DONE
DetailsChristina Prado
Inspection Record Card- Bld  3/17/2017 DONE
OVERRIDE  2/24/2017  
Plan assigned to (CJW)12/13/201612/13/20162/24/2017 PASS
DetailsCarl Westfall
(1st done) (Jan 2 - 15 days) (Jan 23 - 30 days) (75 sheets) Park Boulevard MOB
Routing PW Sewer Design2/17/2017 2/24/2017 PASS
DetailsMike Sheppard
PLANS/APPL TAKEN TO FRONT DESK  2/24/2017 DONE
Permit Ready to Issue  2/24/2017 DONE
DetailsChristina Prado
Need GC form, RP & Revised Cert of Value (ACHD FEES DUE AS OF 3-15-17 SEE DOCUMENTS)
Routing - PLAN CHECK2/17/2017 2/21/2017 PASS
DetailsCarl Westfall
Approved after approval by the Consultant Structural Engineer
Routing Off Site - STRUCTURAL2/17/2017 2/17/2017 PASS
DetailsCarl Westfall
Jan Welch
Plan resubmittals received  2/17/2017 DONE
ePlanReview workflow received.
Routing Off Site - STRUCTURAL2/8/2017 2/16/2017 PASS
DetailsCarl Westfall
emailed structural response to Stapley and asked them to complete second review. ajb Approved per Jan at Stapley. Letter uploaded to eplan.
Plan resubmittals requested  2/8/2017 DONE
Structural routing happened outside of the ePlanReview workflow by Angie.
Routing PW Drainage1/30/2017 2/8/2017 PASS
DetailsBrian Murphy
Routing - PLAN CHECK1/27/2017 2/8/2017 PEND
DetailsCarl Westfall
Pending approval by structural
Routing Off Site - STRUCTURAL1/30/2017 2/3/2017 FAIL
DetailsCarl Westfall
Jan Welch
Routing PW Sewer Design1/30/2017 2/2/2017 FAIL
DetailsRick Christenson
Routing - FIRE1/30/2017 1/31/2017 PASS
DetailsKatie Marron
Revised report attached to case.
Routing - MECHANICAL1/31/2017 1/31/2017 PASS
DetailsTroy James
Routing - PLUMBING1/31/2017 1/31/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing PW Solid Waste1/30/2017 1/30/2017 PASS
DetailsEvan Carpenter
Solid waste is OK as planned.
Routing - MECHANICAL1/30/2017 1/30/2017 FAIL
DetailsTroy James
left message to applicant to provide form #308
Plan resubmittals received  1/30/2017 DONE
received two copies of O and M agreement- put on Brian's desk
Routing - PLUMBING1/30/2017 1/30/2017 FAIL
DetailsBill VanDegrift
no corrections made
Plan resubmittals received  1/27/2017 DONE
Late on a Friday afternoon
Route to Impact Fee Review1/21/20171/24/20171/23/2017 PASS
DetailsCindy M. Gould
Permit was approved for imput before the new fee schedule. This building replaces a demolished 42,000 sq ft warehouse. CMG
1st review completed  1/21/2017 DONE
Plan resubmittals requested  1/21/2017 DONE
Routing - PLAN CHECK12/13/2016 1/21/2017 FAIL
DetailsCarl Westfall
Routing PW Environmental12/13/2016 1/19/2017 PASS
DetailsRick Christenson
Routing PW Drainage12/13/2016 1/3/2017 FAIL
DetailsBrian Murphy
NEED 5 FEET TO GW FOR SEEPAGE BED AND APDX J
Routing PW Sewer Design12/13/2016 12/29/2016 FAIL
DetailsKyle S. Rosenmeyer
Routing Off Site - STRUCTURAL12/13/2016 12/27/2016 FAIL
DetailsCarl Westfall
Jan Welch
Routing - MECHANICAL12/13/2016 12/22/2016 FAIL
DetailsTroy James
Routing - Design Review12/13/2016 12/19/2016 PASS
DetailsJosh Wilson
Construct 6-foot solid fence on north property line.
Routing PW Solid Waste12/13/2016 12/16/2016 FAIL
DetailsEvan Carpenter
Enclosure must have at least 18 ft of unobstructed clearance for collection vehicle access. Suggest removal of center bollard.
Routing - Erosion and Sediment12/13/2016 12/16/2016 PASS
DetailsAndy J. Long
ESC site map and SWPPP narrative approved. Valid PD and RP designated. Site preparation inspection required ###-####
Routing - FIRE12/13/201612/13/201612/15/2016 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect
Routing - PLANNING Land Div12/13/2016 12/14/2016 PASS
DetailsTodd Tucker
Routing PW Sewer Rating12/13/2016 12/14/2016 PASS
DetailsMorgan Webb
Routing - PLUMBING12/13/2016 12/14/2016 FAIL
DetailsBill VanDegrift
1) civil rain drain branch does not match plumbing plans (5")
2) increase waste and floor drain to accept rp discharge in riser room.
Routing - PLANNING12/13/2016 12/13/2016 PASS
DetailsCody Riddle
Review not required. Approved through DR.
Intake Approval  12/13/2016 PASS
Routing - Addressing12/13/2016 12/13/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS12/13/2016 12/13/2016 PASS
DetailsRachael Beierle
ROUTED ONLY. M_W FOR RATING.
Routing PW Street Lights12/13/2016 12/13/2016 PASS
DetailsTom Marshall
Intake Approval  12/5/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Please see check list for items needed for pre screen submittal.
Application received  11/30/2016 DONE
Application submitted via PDS Online on Nov 30 2016 2:30PM