Third Notice | | 4/15/2018 | 5/1/2018 | | DONE |
|
|
|
|
Third Notice | | 3/19/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
Second Notice | | 2/22/2018 | 3/14/2018 | | DONE |
|
|
|
mailed 3-15-18
|
First Notice | | 1/15/2018 | 2/12/2018 | | DONE |
|
|
|
Mailed 2-13-18
|
Letter of compliance/Occupancy | | | 1/8/2018 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 1/8/2018 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 1/5/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/5/2018 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 1/5/2018 | | DONE |
Christina Prado
|
|
|
|
DOC - Permit Finaled | | | 1/5/2018 | | DONE |
|
|
|
|
BLD-Final | 1/2/2018 | 1/3/2018 | 1/3/2018 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams
|
FIRE-Final Inspection | 12/28/2017 | 1/2/2018 | 1/2/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete for core and shell, fire alarm inspection complete for core and shell, final life fire safety inspection for core and shell complete.
|
BLD-Final | 12/27/2017 | 12/28/2017 | 12/28/2017 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Energy code compliance | 12/21/2017 | 12/21/2017 | 12/21/2017 | A | PASS |
Dave Hannah
|
|
|
Good morning Dave. I just wanted to do an inspection on the vapor barrier in the future St Luke''s TI and also talk to you about dry walling the exterior wall in this space down to the 10'' elevation. I will be in a meeting on another project until about 10:30. Thanks Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
|
PubWorks Occupancy Approval | 12/4/2017 | 12/4/2017 | 12/4/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 11/30/2017 | 11/30/2017 | 11/30/2017 | | PASS |
Sarah Schafer
|
|
|
|
BLD-Framing/Rough-in | 9/1/2017 | 9/1/2017 | 9/1/2017 | A | PASS |
Dave Hannah
|
|
|
Periodic Framing Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Framing/Rough-in | 8/23/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
Dave Hannah
|
|
|
Framing, periodic inspection. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Wall cover | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Dave Hannah
|
|
|
Exterior walls in ICRM TI for insulation and top down drywall. Air moisture barrier Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Framing/Rough-in | 6/20/2017 | 6/21/2017 | 6/21/2017 | A | PASS |
Dave Hannah
|
|
|
Exterior load bearing, shear wall and sheathing inspection Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Framing/Rough-in | 6/13/2017 | 6/13/2017 | 6/14/2017 | P | PART |
Dave Hannah
|
|
|
Exterior wall framing for cover with exterior sheathing. welding header attachment etc. Phone #: ###-#### Inspection requested via web by Jim Williams screws for headers and sheer ok
|
CHANGE STATUS TO (ISS) | | | 5/11/2017 | | DONE |
|
|
|
plan mod issued
|
Inspection Record Card- Bld | | | 5/11/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/11/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/8/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 3/24/2017 | 3/24/2017 | 5/8/2017 | | PASS |
Carl Westfall
|
|
|
plan mod (2nd done)
|
Plan Reviewer's activity | | | 5/8/2017 | | DONE |
|
|
|
Plan mod reviewed and approved
|
Permit Ready to Issue | | | 5/8/2017 | | DONE |
|
|
|
all met, fees due;DO NOT RE ISSUE
|
Routing - PLAN CHECK | 4/25/2017 | | 5/8/2017 | | PASS |
Carl Westfall
|
|
|
Finished routing
|
Routing - Design Review | 4/25/2017 | | 5/4/2017 | | PASS |
Sarah Schafer
|
|
|
|
Plan resubmittals requested | | | 4/25/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/25/2017 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/19/2017 | | 4/24/2017 | | PASS |
Carl Westfall
|
|
|
Jan Welch - Engineer of Record has indicated remaining issues will be resolved with field correspondence.
|
Routing - Design Review | 4/19/2017 | | 4/20/2017 | | FAIL |
Sarah Schafer
|
|
|
Site plan show pedestrian ramps removed from walk ways and light poles in the middle of the side walks. This does not match the modification just processed through Design Review DRH17-00123.
|
Routing - PLAN CHECK | 4/18/2017 | | 4/19/2017 | | PASS |
Carl Westfall
|
|
|
|
Routing PW Sewer Design | 4/19/2017 | | 4/19/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Drainage | 4/19/2017 | | 4/19/2017 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 4/18/2017 | | DONE |
|
|
|
|
BLD-Footing | 4/4/2017 | 4/5/2017 | 4/11/2017 | A | PASS |
Dave Hannah
|
|
|
jim Phone #: ###-####
|
BLD-Footing | 4/11/2017 | 4/11/2017 | 4/11/2017 | P | PASS |
Dave Hannah
|
|
|
would like call ahead; Jim Phone #: ###-####
|
Plan resubmittals requested | | | 4/6/2017 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/25/2017 | | 4/6/2017 | | FAIL |
Carl Westfall
|
|
|
Jan Welch
|
Routing PW Sewer Design | 3/28/2017 | | 3/28/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Revised sewer extension plan approved.
|
Routing - MECHANICAL | 3/25/2017 | | 3/27/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 3/25/2017 | | 3/27/2017 | | PASS |
Cody Riddle
|
|
|
No review required
|
Routing - Design Review | 3/25/2017 | | 3/25/2017 | | FAIL |
Josh Wilson
|
|
|
Modification required. Changes to elevations and landscape plans.
|
Routing - PLAN CHECK | 3/24/2017 | | 3/25/2017 | | PASS |
Carl Westfall
|
|
|
Route to storm water and sewer design.
|
Plan Modification Accepted | | | 3/24/2017 | | DONE |
|
|
|
plan mod started in e plan
|
Issue PAID IN FULL permit | | | 3/17/2017 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 3/17/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 2/24/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 12/13/2016 | 12/13/2016 | 2/24/2017 | | PASS |
Carl Westfall
|
|
|
(1st done) (Jan 2 - 15 days) (Jan 23 - 30 days) (75 sheets) Park Boulevard MOB
|
Routing PW Sewer Design | 2/17/2017 | | 2/24/2017 | | PASS |
Mike Sheppard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/24/2017 | | DONE |
Christina Prado
|
|
|
Need GC form, RP & Revised Cert of Value (ACHD FEES DUE AS OF 3-15-17 SEE DOCUMENTS)
|
Routing - PLAN CHECK | 2/17/2017 | | 2/21/2017 | | PASS |
Carl Westfall
|
|
|
Approved after approval by the Consultant Structural Engineer
|
Routing Off Site - STRUCTURAL | 2/17/2017 | | 2/17/2017 | | PASS |
Carl Westfall
|
|
|
Jan Welch
|
Plan resubmittals received | | | 2/17/2017 | | DONE |
|
|
|
ePlanReview workflow received.
|
Routing Off Site - STRUCTURAL | 2/8/2017 | | 2/16/2017 | | PASS |
Carl Westfall
|
|
|
emailed structural response to Stapley and asked them to complete second review. ajb Approved per Jan at Stapley. Letter uploaded to eplan.
|
Plan resubmittals requested | | | 2/8/2017 | | DONE |
|
|
|
Structural routing happened outside of the ePlanReview workflow by Angie.
|
Routing PW Drainage | 1/30/2017 | | 2/8/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 1/27/2017 | | 2/8/2017 | | PEND |
Carl Westfall
|
|
|
Pending approval by structural
|
Routing Off Site - STRUCTURAL | 1/30/2017 | | 2/3/2017 | | FAIL |
Carl Westfall
|
|
|
Jan Welch
|
Routing PW Sewer Design | 1/30/2017 | | 2/2/2017 | | FAIL |
Rick Christenson
|
|
|
|
Routing - FIRE | 1/30/2017 | | 1/31/2017 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing - MECHANICAL | 1/31/2017 | | 1/31/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 1/31/2017 | | 1/31/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing PW Solid Waste | 1/30/2017 | | 1/30/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing - MECHANICAL | 1/30/2017 | | 1/30/2017 | | FAIL |
Troy James
|
|
|
left message to applicant to provide form #308
|
Plan resubmittals received | | | 1/30/2017 | | DONE |
|
|
|
received two copies of O and M agreement- put on Brian's desk
|
Routing - PLUMBING | 1/30/2017 | | 1/30/2017 | | FAIL |
Bill VanDegrift
|
|
|
no corrections made
|
Plan resubmittals received | | | 1/27/2017 | | DONE |
|
|
|
Late on a Friday afternoon
|
Route to Impact Fee Review | 1/21/2017 | 1/24/2017 | 1/23/2017 | | PASS |
Cindy M. Gould
|
|
|
Permit was approved for imput before the new fee schedule. This building replaces a demolished 42,000 sq ft warehouse. CMG
|
1st review completed | | | 1/21/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 1/21/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/13/2016 | | 1/21/2017 | | FAIL |
Carl Westfall
|
|
|
|
Routing PW Environmental | 12/13/2016 | | 1/19/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Drainage | 12/13/2016 | | 1/3/2017 | | FAIL |
Brian Murphy
|
|
|
NEED 5 FEET TO GW FOR SEEPAGE BED AND APDX J
|
Routing PW Sewer Design | 12/13/2016 | | 12/29/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
|
Routing Off Site - STRUCTURAL | 12/13/2016 | | 12/27/2016 | | FAIL |
Carl Westfall
|
|
|
Jan Welch
|
Routing - MECHANICAL | 12/13/2016 | | 12/22/2016 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 12/13/2016 | | 12/19/2016 | | PASS |
Josh Wilson
|
|
|
Construct 6-foot solid fence on north property line.
|
Routing PW Solid Waste | 12/13/2016 | | 12/16/2016 | | FAIL |
Evan Carpenter
|
|
|
Enclosure must have at least 18 ft of unobstructed clearance for collection vehicle access. Suggest removal of center bollard.
|
Routing - Erosion and Sediment | 12/13/2016 | | 12/16/2016 | | PASS |
Andy J. Long
|
|
|
ESC site map and SWPPP narrative approved. Valid PD and RP designated. Site preparation inspection required ###-####
|
Routing - FIRE | 12/13/2016 | 12/13/2016 | 12/15/2016 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect
|
Routing - PLANNING Land Div | 12/13/2016 | | 12/14/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Sewer Rating | 12/13/2016 | | 12/14/2016 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 12/13/2016 | | 12/14/2016 | | FAIL |
Bill VanDegrift
|
|
|
1) civil rain drain branch does not match plumbing plans (5")
2) increase waste and floor drain to accept rp discharge in riser room.
|
Routing - PLANNING | 12/13/2016 | | 12/13/2016 | | PASS |
Cody Riddle
|
|
|
Review not required. Approved through DR.
|
Intake Approval | | | 12/13/2016 | | PASS |
|
|
|
|
Routing - Addressing | 12/13/2016 | | 12/13/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/13/2016 | | 12/13/2016 | | PASS |
Rachael Beierle
|
|
|
ROUTED ONLY. M_W FOR RATING.
|
Routing PW Street Lights | 12/13/2016 | | 12/13/2016 | | PASS |
Tom Marshall
|
|
|
|
Intake Approval | | | 12/5/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see check list for items needed for pre screen submittal.
|
Application received | | | 11/30/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 30 2016 2:30PM
|