Permit Information
Permit NumberBLD16-04354
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 1055 N CURTIS RD
Project NameSARMC Outpatient Perioperative
Customer Number 
ePlanReviewYes
Description
(SAINT ALPHONSUS REGIONAL MEDICAL CENTER – OUTPATIENT PERIOPERATIVE – CARE SUITE) The fire sprinkler system is used for occupancy and for high-rise. To remodel a 2,179 square foot area (i.e. a new care suite) located in the West wing (one story tall and about 38,524 square feet in area) of an existing high-rise hospital to be used as a Perioperative (or Post) Anesthesia Care Unit (PACU). Work is to include interior nonbearing walls, a smoke partition wall required to comply as both an I-2 rated corridor wall and as a care suite separation, smoke partition walls to comply as a care suite separation, a 1-hr smoke barrier wall to maintain smoke compartments, incidental use separation walls, a single-user restroom accessible to the disabled, interior doors, curtain tracks, curtains, suspended acoustical ceilings, gypsum board soffits, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. Existing smoke barrier walls creating smoke compartments are required to be maintained. Existing 1991 UBC fire-rated corridors are required to be maintained except at the remodel area where the common wall between the corridor and the care suite is allowed to comply with the 2012 IBC. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. Quick-response fire sprinkler heads are required to be installed throughout the remodel area (i.e. the new care suite). **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 6/29/20176/30/2017 DONE
This permit finaled on the web by Brandon Byington
Permanent Occupancy  6/19/2017 DONE
BLD-Final6/15/20176/16/20176/16/2017PPASS
DetailsDave Hannah
Cecil Phone #: ###-####
FIRE-Final Inspection6/15/20176/16/20176/16/2017APASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in4/20/20174/20/20174/20/2017PPASS
DetailsMike Jordan
Cecil Phone #: ###-####-please call to meet
Issue PAID IN FULL permit  1/20/2017 DONE
Print Occupancy Form  1/20/2017 DONE
Telephone call  1/17/2017 DONE
customer emailed me the rev cert of val and GC-i attached to doc and emailed them the fees due
Plan assigned to (CJW)12/13/201612/13/20161/13/2017 PASS
DetailsCarl Westfall
(1st done) (Jan 2 - 15 days) (33 sheets) SARMC Outpatient Perioperative
Plan resubmittals received  1/13/2017 DONE
Routing - PLAN CHECK1/13/2017 1/13/2017 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  1/13/2017 DONE
Permit Ready to Issue  1/13/2017 DONE
DetailsChristina Prado
***all requirements met 1-20-17 /CEV***

Need GC Form & Revised Certificate of Value for issuance
Route to Impact Fee Review1/6/20171/9/20171/9/2017 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK12/13/2016 1/6/2017 FAIL
DetailsCarl Westfall
1st review completed  1/6/2017 DONE
Plan resubmittals requested  1/6/2017 DONE
Routing - MECHANICAL12/13/2016 12/27/2016 PASS
DetailsTroy James
Routing - PLUMBING12/13/2016 12/14/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - FIRE12/13/201612/13/201612/13/2016 PASS
DetailsKatie Marron
comments attached to case.
Intake Approval  12/13/2016 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing12/13/2016 12/13/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS12/13/2016 12/13/2016 PASS
DetailsMorgan Webb
Application received  12/2/2016 DONE
Application submitted via PDS Online on Dec 2 2016 2:10PM