Print Statement | | | 11/14/2017 | | DONE |
|
|
|
|
First Notice | | 10/8/2017 | 10/12/2017 | | DONE |
|
|
|
Mailed 10-13-17
|
Permanent Occupancy | | | 9/28/2017 | | DONE |
|
|
|
|
BLD-Final | 9/22/2017 | 9/25/2017 | 9/25/2017 | P | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-#### Verified label on 3hr fire door located on East wall of Verde Co. matches information that Javier sent me by E-mail. OK for Perm Occ.
|
FIRE-Final Inspection | 9/22/2017 | 9/25/2017 | 9/25/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Joe Phone #: ###-####
|
OVERRIDE | | | 9/22/2017 | | |
|
|
|
|
Plan assigned to (JG) | 6/28/2017 | 6/28/2017 | 9/22/2017 | | DONE |
Javier Guzman
|
|
|
1st rev comp, Plan Mod TV Litho ePlan
|
CHANGE STATUS TO (ISS) | | | 9/22/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/22/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/22/2017 | | 9/22/2017 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 9/22/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for Plan Mod
Change status to ISS once all fees paid in full
DO NOT RE-ISSUE PERMIT
|
Temporary Occupancy | 9/20/2017 | 12/19/2017 | 9/20/2017 | | DONE |
Candy A. Nichols
|
|
|
as per Jason Blais-ok to extend Temp C of O
|
Routing - PLAN CHECK | 7/17/2017 | | 7/31/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 6/28/2017 | | 7/6/2017 | | FAIL |
Javier Guzman
|
|
|
|
Plan Modification Accepted | | | 6/28/2017 | | |
|
|
|
|
BLD-Final | 6/16/2017 | 6/16/2017 | 6/16/2017 | P | PART |
Jim Storey
|
|
|
Joe-partail for temp c of o Phone #: ###-#### temp ok pending fire shuder permit issuance
|
FIRE-Final Inspection | 6/14/2017 | 6/16/2017 | 6/16/2017 | P | PART |
Troy Cobbley
|
|
|
A temporary for life safety is given per documentation until the door in the adjoining space has been addressed
|
Temporary Occupancy | 6/16/2017 | 9/14/2017 | 6/16/2017 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 6/1/2017 | 6/2/2017 | 6/2/2017 | A | FAIL |
Troy Cobbley
|
|
|
Inspection turned into a conference since the project is not ready yet. I noted that I need verification of a BLD permit for the door/opening. The fire alarm permit needs to be finaled for the door/opening. I noted exterior door hardware issues. Need verification of annual sprinkler inspection and that the existing fire alarm system is functional. Exit signs and emergency lights tested ok. Sprinkler permit is finaled
|
BLD-Final | 6/1/2017 | 6/2/2017 | 6/2/2017 | P | CANC |
Jim Sly
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 4/13/2017 | 4/14/2017 | 4/14/2017 | P | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/22/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/22/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/30/2017 | | DONE |
Christina Prado
|
|
|
***all requirments met 3-22-17 /CEV
Need GC form & Revised certificate of value for issuance
|
Plan assigned to (JG) | 12/9/2016 | 12/9/2016 | 1/27/2017 | | PASS |
Javier Guzman
|
|
|
1st review completed, 12/22 L2 Treasure Valley Litho Pend B.O.
|
Routing - PLAN CHECK | 1/9/2017 | | 1/27/2017 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/15/2017 | 1/18/2017 | 1/17/2017 | | PASS |
Cindy M. Gould
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 12/21/2016 | 12/21/2016 | 12/21/2016 | | PASS |
Katie Marron
|
|
|
Modifications to the sprinkler system will be required. No additional comments.
|
1st review completed | | | 12/21/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 12/9/2016 | | 12/21/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 12/9/2016 | | 12/19/2016 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 12/9/2016 | | 12/12/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/9/2016 | | 12/12/2016 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 12/9/2016 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 12/5/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 5 2016 3:02PM
|