BLD-Final | 7/7/2017 | 7/10/2017 | 7/10/2017 | A | PASS |
Jim Sly
|
|
|
todd Phone #: ###-####
|
DOC - Permit Finaled | 7/10/2017 | 7/10/2017 | 7/10/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/6/2017 | 7/6/2017 | 7/7/2017 | P | NR |
Jim Sly
|
|
|
Todd Phone #: ###-#### Need Plumb Final
|
BLD-Energy code compliance | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PASS |
Jim Sly
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PASS |
Jim Sly
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 3/28/2017 | 3/30/2017 | 3/30/2017 | A | FAIL |
Tony Young
|
|
|
Todd Phone #: ###-####,, correction notice posted
|
BLD-Wall Bracing | 3/15/2017 | 3/16/2017 | 3/16/2017 | P | PASS |
Jim Sly
|
|
|
Shear // Tod Phone #: ###-####
|
BLD-Foundation | 2/14/2017 | 2/14/2017 | 2/14/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 2/13/2017 | 2/13/2017 | 2/13/2017 | P | PASS |
Jim Sly
|
|
|
ben Phone #: ###-####
|
OVERRIDE | | | 2/8/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 12/9/2016 | 12/9/2016 | 2/8/2017 | | DONE |
Brian McGowan
|
|
|
Due 12-19 - ePlan - Fail - Need Tall wall engineering, Planning has failed it too - 1-18-17 - Must meet Planning requirements before approval.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2017 | | |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/8/2017 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 2/8/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/8/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 1/5/2017 | | 2/7/2017 | | PASS |
Sue Cummings
|
|
|
O.K. as per Scott S.
|
Routing - PLAN CHECK | 1/19/2017 | | 1/19/2017 | | PASS |
Brian McGowan
|
|
|
Must meet Planning requirements before approval
|
Routing - PLAN CHECK | 1/5/2017 | | 1/5/2017 | | FAIL |
Brian McGowan
|
|
|
See Planning Requirements
|
1st review completed | | | 12/14/2016 | | FAIL |
Brian McGowan
|
|
|
Tall Wall Engineering required - See Planning requirements
|
Routing - PLAN CHECK | | | 12/14/2016 | | FAIL |
Brian McGowan
|
|
|
Tall Wall Engineering required - See Planning requirements
|
Routing - MECHANICAL | | | 12/9/2016 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 12/6/2016 | | 12/9/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Application received | | | 12/6/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 6 2016 11:37AM
|
Plans ACCEPTED BY PLAN TECH | | | 12/6/2016 | | DONE |
|
|
|
|
Intake Approval | | | 12/6/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/6/2016 | | DONE |
|
|
|
|
Routing - Addressing | 12/6/2016 | | 12/6/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/6/2016 | | 12/6/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | | | | | FAIL |
|
|
|
Move driveway location. See 11-07-3 (f) BBC.
|