Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-04416
StatusFinaled
Name JAYO DEVELOPMENT INC
Site Address 3316 S CADET AVE
Project Name 
Customer NumberBLD16-04415
ePlanReviewNo
Description
Permit for the construction of a new 2,076 sq. ft., two story (first story 1,155 sq. ft., second story 921 sq. ft.) Townhouse with 3 bedrooms, 2 and a half bathrooms, approximately 124 sq. ft. of covered patio/porch and a 477 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/16/201711/16/201711/16/2017PPASS
DetailsBrandon Shaw
call for access (jayo)- Cameron Phone #: ###-####
DOC - Permit Finaled11/16/201711/16/201711/16/2017PPASS
DetailsBrandon Shaw
BLD-Framing/Rough-in7/5/20177/6/20177/6/2017APASS
DetailsJim Storey
cameron Phone #: ###-####
BLD-Framing/Rough-in6/19/20176/20/20176/20/2017APART
DetailsJim Storey
cameron Phone #: ###-#### c/n posted
BLD-Wall Bracing5/22/20175/23/20175/23/2017APART
DetailsJim Storey
Cameron Phone #: ###-#### exterior ok / soffit front and back requir fire septration to be finsked and verrafied.
BLD-Energy code compliance4/26/20174/27/20174/27/2017APASS
DetailsJim Storey
Cameron Phone #: ###-####
BLD-Energy code compliance4/6/20174/7/20174/7/2017APASS
DetailsJim Storey
Cameron Phone #: ###-#### gyp ok insulation ok
BLD-Energy code compliance3/31/20174/3/20174/3/2017APASS
DetailsJim Storey
Dave Phone #: ###-#### p/l wall ft to 3ft above floor ok 2hr
Issue PAID IN FULL permit  2/28/2017 DONE
Place hold on job2/27/2017 2/28/2017 DONE
DetailsCandy A. Nichols
DO NOT ISSUE WITHOUT BLD16-04415
OVERRIDE  2/27/2017  
Plan assigned to (DAF)12/9/201612/9/20162/27/2017 DONE
DetailsDavid Ferguson
due 12/21 - plan review failed - need firewall section that complies with codes, wall bracing, and other structural.
Inspection Record Card- Bld  2/27/2017 DONE
Routing - PLAN CHECK2/27/2017 2/27/2017 PASS
DetailsDavid Ferguson
Case Summary (BLD)  2/27/2017 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  2/27/2017 DONE
Permit Ready to Issue  2/27/2017 DONE
All Met
Telephone call  2/27/2017 DONE
called Cameron to let know permit is ready and how much is owed-left message on his cell
Inspection Record Card- Bld  2/27/2017 DONE
Inspection Record Card- Bld  2/27/2017 DONE
Plan resubmittals received  2/15/2017 DONE
Resubmittals recieved 2 sets of sheets A1-1, A2-0, A2-2, A3-1, A3-2, S3-3, A3-4, A3-5, A3-6, A4-1, A7-1, E1-1, E1-2-took to Dave F
1st review completed  12/29/2016 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK12/13/2016 12/29/2016 FAIL
DetailsDavid Ferguson
plan review failed - need firewall section that complies with codes, wall bracing, and other structural.
Routing - MECHANICAL12/9/2016 12/13/2016 PASS
DetailsTroy James
Routing - PLANNING12/8/2016 12/9/2016 PASS
DetailsSusan Riggs
Plan assigned to (LEG) Tisha12/8/2016 12/9/2016 DEFR
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  12/8/2016 DONE
Intake Approval  12/8/2016 PASS
Recd Pcfee & Taken To Pln CK  12/8/2016 DONE
Routing - Addressing12/8/2016 12/8/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS12/8/2016 12/8/2016 PASS
DetailsRachael Beierle
Application received 12/8/2016