PubWorks Occupancy Approval | 9/28/2017 | 9/28/2017 | 9/28/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 9/21/2017 | 9/27/2017 | 9/27/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 9/27/2017 | 9/27/2017 | 9/27/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 7/26/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 7/24/2017 | 7/26/2017 | 7/26/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 7/12/2017 | 7/13/2017 | 7/13/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 7/10/2017 | 7/10/2017 | 7/10/2017 | P | FAIL |
Brandon Shaw
|
|
|
1) No city approved set of plans on site. 2) No access to 2nd story
|
BLD-Foundation | 4/19/2017 | 4/19/2017 | 4/19/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Foundation | 4/18/2017 | 4/18/2017 | 4/18/2017 | P | CANC |
Brandon Shaw
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
PubWorks Subgrade Approval | 4/13/2017 | 4/13/2017 | 4/13/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 2/17/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 1/27/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 12/16/2016 | 12/16/2016 | 1/27/2017 | | DONE |
Brian McGowan
|
|
|
Due 12-28 Level 2 - waiting for PW-Hillside to review resubmittals
|
Routing - PLAN CHECK | 1/10/2017 | | 1/27/2017 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 1/27/2017 | | DONE |
|
|
|
|
Telephone call | | | 1/27/2017 | | DONE |
|
|
|
called Tahoe- left emssage that permit is ready and fees due
|
Case Summary (BLD) | | | 1/27/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 1/27/2017 | | DONE |
|
|
|
met
|
Routing PW Grading-Hillside | 1/10/2017 | | 1/10/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 1/10/2017 | | 1/10/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Grading-Hillside | 12/28/2016 | | 1/6/2017 | | FAIL |
Jason C. Taylor
|
|
|
Need signed conditons of approval returned. JCT
|
1st review completed | | | 12/28/2016 | | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (LEG) Tisha | 12/9/2016 | | 12/16/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 12/15/2016 | | DONE |
|
|
|
received (3) new sets of grading plans
|
Routing - FIRE | | | 12/15/2016 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - Erosion and Sediment | 12/13/2016 | | 12/14/2016 | | PASS |
Andy J. Long
|
|
|
Pre-approved ESC plan waiver submitted. Valild RP. No additional review required.
|
Routing - MECHANICAL | 12/12/2016 | | 12/13/2016 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 12/12/2016 | | 12/12/2016 | | FAIL |
Rachael Beierle
|
|
|
See Hillside
|
Routing - PLANNING | 12/12/2061 | | 12/12/2016 | | PASS |
Colleen T Carroll
|
|
|
|
Routing PW Grading-Hillside | | | 12/12/2016 | | FAIL |
Jason C. Taylor
|
|
|
See email dated 12/12/2016. JCT
|
Routing PW Sewer Rating | 12/9/2016 | | 12/9/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 12/9/2016 | | 12/9/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/9/2016 | | DONE |
|
|
|
|
Intake Approval | | | 12/9/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/9/2016 | | DONE |
|
|
|
|
Application received | | 12/9/2016 | | | |
|
|
|
|