BLD-Aging Inspection | 6/15/2018 | 6/15/2018 | 6/18/2018 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Brandon Shaw
|
|
|
|
Issue PAID IN FULL permit | | | 4/17/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/14/2017 | | 4/14/2017 | | PASS |
Tisha Gallop
|
|
|
Per Andy Long ref. ESC16-01650
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/14/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/14/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/14/2017 | | DONE |
|
|
|
MET
|
Telephone call | | | 4/14/2017 | | DONE |
|
|
|
called JIm to let know permit is ready and how much is owed-left message on phone
|
Plan assigned to (LEG) Tisha | 12/9/2016 | | 4/14/2017 | | DONE |
Tisha Gallop
|
|
|
1st review 12/13; full redesign will be resubmitted. Will reroute to all dept. when received.
|
Routing - PLANNING | 4/13/2017 | | 4/14/2017 | | PASS |
Susan Riggs
|
|
|
The exposed retaining wall may not exceed 6-feet in height.
|
Routing PW Grading-Hillside | | | 4/13/2017 | | PASS |
|
|
|
The final inspection of the retaining wall work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Plan resubmittals received | | | 4/11/2017 | | DONE |
|
|
|
received (3) sets of revised grading plans and retaining wall calculations
|
Plan resubmittals received | | | 12/20/2016 | | DONE |
|
|
|
received one copy structural calcs via e-mail
|
Routing - PLANNING | 12/20/2016 | | 12/20/2016 | | FAIL |
Susan Riggs
|
|
|
I've emailded the applicant. The minimum height for a retaining wall in the rear setback is 6-feet. The wall as proposed requires a varaince and category 1 hillsdie permit.
|
Routing PW Grading-Hillside | 12/20/2016 | | 12/20/2016 | | FAIL |
Jason C. Taylor
|
|
|
See email dated 12/20/2016. JCT
|
1st review completed | | | 12/19/2016 | | FAIL |
|
|
|
complete resubmittal and engineering will be submitted to change design of retaining wall
|
Plan resubmittals received | | | 12/19/2016 | | DONE |
|
|
|
One copy of application, checklist, and sheets Block Retaining Wally Section and 3 of 11. Taken to Tisha
|
Routing - PLANNING | | | 12/13/2016 | | CANC |
|
|
|
|
Routing - PUBLIC WORKS | | | 12/13/2016 | | CANC |
Rachael Beierle
|
|
|
failed JCT, will reroute to PW when resubmit received.
|
Routing - Erosion and Sediment | | | 12/13/2016 | | CANC |
Andy J. Long
|
|
|
no esc plans submitted
|
Routing PW Grading-Hillside | | | 12/13/2016 | | FAIL |
Jason C. Taylor
|
|
|
Need revised plans for retaining wall. JCT
|
Routing - PLAN CHECK | | | 12/13/2016 | | FAIL |
Tisha Gallop
|
|
|
complete resubmittal and engineering will be submitted to change design of retaining wall; will reroute to all departments when resubmit received.
|
Routing PW Flood Plain | 12/9/2016 | | 12/12/2016 | | PASS |
Jim Wyllie
|
|
|
Retaining wall is not located in the floodplain.
Jim Wyllie / ###-####
|
Routing PW Sewer Rating | 12/9/2016 | | 12/9/2016 | | PASS |
Rachael Beierle
|
|
|
RETAINING WALL ONLY. NO DWELLING. ROUTED TO FLOODPLAIN AND GRADING PW.
|
Routing - Addressing | 12/9/2016 | | 12/9/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/9/2016 | | DONE |
|
|
|
|
Intake Approval | | | 12/9/2016 | | PASS |
|
|
|
|
Application received | | 12/9/2016 | | | |
|
|
|
|