Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD16-04441
StatusFinaled
Name KC GARDNER RIVERWOODS LC
Site Address 101 S CAPITOL BLVD Unit: 610
Project NamePerpetua Suite #610
Customer NumberBLD17-00110
ePlanReviewYes
Description
**( PERPETUA - US BANK BUILDING - 6TH FLOOR – SUITE #610)** This building is fire sprinklered because it is a high-rise. Permit is to remodel an existing 4,054 sq. ft. tenant space by dividing it into two separate tenant spaces, this tenant space is to be 2,787 sq. ft. and the remaining tenant space is to be 1,267 sq. ft. under BLD17-00110. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal and relocation of select door/door frames, removal of millwork, removal of select plumbing fixtures and plumbing accessories, construction of select interior non-bearing walls to create (4) offices, (2) conference rooms, a break area and a work area, millwork, electrical work, plumbing work and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully fire sprinklered any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  6/28/2017 DONE
First Notice 5/28/20176/13/2017 DONE
sent in mail 6-14-17
Permanent Occupancy  5/24/2017 DONE
BLD-Final5/16/20175/17/20175/18/2017APASS
DetailsDave Hannah
Larren Phone #: ###-####
Permanent Occupancy  5/18/2017 DONE
Print Occupancy Form  5/18/2017 DONE
BLD-Final5/8/20175/8/20175/9/2017PNR
DetailsDave Hannah
Aaron Phone #: ###-#### fix door locks and signage
FIRE-Final Inspection4/19/20174/19/20174/19/2017APASS
DetailsJim Page
Final fire alarm inspection is complete for area of work, no fire sprinkler modifications for area of work, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work passed/complete
FIRE-Supply Line Hydro4/18/20174/19/20174/19/2017ACANC
DetailsJim Page
Inspection request is for a life fire safety final, not a supply line hydro. This inspection request is cancelled and the correct request will be generated.
BLD-Framing/Rough-in3/20/20173/20/20173/20/2017PPASS
DetailsDave Hannah
Larren Phone #: ###-####
BLD-Framing/Rough-in2/10/20172/10/20172/10/2017PPASS
DetailsDave Hannah
Laren Phone #: ###-####
Issue PAID IN FULL permit  2/8/2017 DONE
Print Occupancy Form  2/8/2017 DONE
Plan assigned to (JG)1/6/20171/6/20171/27/2017 PASS
DetailsJavier Guzman
1st review completed, 1/12 L1 Perpetua
Routing - PLAN CHECK1/26/2017 1/27/2017 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/27/2017 DONE
Permit Ready to Issue  1/27/2017 DONE
DetailsChristina Prado
Needs GC FORM only as of 2/1/17 C_P ///// Needs; GC Form & Revised Cert of Value
PLEASE DO NOT ISSUE WITHOUT BLD17-00110
Route to Impact Fee Review1/15/20171/18/20171/17/2017 PASS
DetailsCindy M. Gould
Review requested for Commercial Permit
Routing - PLAN CHECK1/6/2017 1/13/2017 FAIL
DetailsJavier Guzman
1st review completed  1/13/2017 FAIL
DetailsJavier Guzman
Routing - PUBLIC WORKS1/6/2017 1/9/2017 PASS
DetailsMorgan Webb
Routing - FIRE1/6/20171/6/20171/6/2017 PASS
DetailsKatie Marron
Separate Fire Permits will be required. No comments attached.
Routing - Addressing1/6/2017 1/6/2017 PASS
DetailsLaura Hunter
Intake Approval  1/6/2017 PASS
DetailsDavid Ferguson
Application received  12/12/2016 DONE
Application submitted via PDS Online on Dec 12 2016 11:51AM