Permit Information
Permit NumberBLD16-04456
StatusFinaled
Name PERRYMAN CONSTRUCTION MANAGEMENT IN
Site Address 12573 W IRVING ST
Project NameThe Cottages at White Clouds
Customer NumberBLD16-04455 EPLAN
ePlanReview 
Description
(2 PERMITS TOTAL FILED UNDER BLD16-04455 IN EPLANREVIEW) **Special inspections required, see form #310** Plan P-4 - Permit for the construction of a new 1234 sq. ft., two story (first story 406 sq. ft., second story 828 sq. ft.) Townhouse with 2 bedrooms, 2 bathrooms, approx. 63 sq. ft. deck, and a 482 sq. ft. attached garage per the approved plans, engineering, ResCheck, ACCA report, and any notations. R-1C zoning and setbacks per planning. Plan meets Prescriptive Energy Code or Better. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/21/20188/21/20188/21/2018APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Sam Brown
DOC - Permit Finaled8/21/20188/21/20188/21/2018PPASS
DetailsJim Sly
BLD-Energy code compliance5/22/20185/22/20185/22/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown. All issues resolved.
BLD-Energy code compliance5/15/20185/17/20185/17/2018ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown. Needs to complete fire wall to underneath side of roof deck.
BLD-Framing/Rough-in5/14/20185/14/20185/14/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Energy code compliance5/10/20185/10/20185/10/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Framing/Rough-in5/10/20185/10/20185/10/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Framing/Rough-in4/30/20184/30/20184/30/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown. Needs plumbing rough in??
BLD-Other4/5/20184/6/20184/6/2018ACANC
DetailsMike Jordan
Fire rated assembly at roof eave. Phone #: ###-#### Inspection requested via web by Sam Brown. Wrong permit called in.
BLD-Wall Bracing3/22/20183/22/20183/22/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Wall Bracing3/21/20183/21/20183/21/2018PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown. . Missing straps, nailing and holdowns.
BLD-Foundation12/14/201712/14/201712/14/2017PPASS
DetailsMike Jordan
rebar // dan Phone #: ###-####
BLD-Foundation10/18/201710/18/201710/18/2017PPASS
DetailsMike Jordan
foundation insulation // Sam Phone #: ###-####
BLD-Foundation10/16/201710/16/201710/16/2017PPASS
DetailsMike Jordan
Manuel Phone #: ###-####
BLD-Footing10/12/201710/12/201710/12/2017PPASS
DetailsMike Jordan
Manuel Phone #: ###-####
Issue PAID IN FULL permit  9/1/2017 DONE
Inspection Record Card- Bld  9/1/2017 DONE
OVERRIDE  8/31/2017  
Plan assigned to (BJM)3/2/20173/2/20178/31/2017 DONE
DetailsBrian McGowan
1st Review Complete -Due 3-17 Level 2 Fail- Engineering was done as a duplex
Routing - PLAN CHECK8/22/2017 8/31/2017 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  8/31/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  8/31/2017 DONE
all met, must issue with Bld16-04455
Plan resubmittals received  8/22/2017 DONE
Routing - PLANNING2/28/2017 7/6/2017 PASS
DetailsCody Riddle
Extend Review Timeline  6/5/2017 DONE
1st approved 180 day extension per Adele. See documents
Expiration Notice5/18/20176/9/20175/18/2017 DONE
DetailsBrittany Hill
1st review completed  3/17/2017 FAIL
DetailsBrian McGowan
Lateral and shear was done as a duplex
Routing - PLAN CHECK2/28/2017 3/17/2017 FAIL
DetailsBrian McGowan
Lateral and shear was done as a duplex
Route to Impact Fee Review2/28/20173/3/20173/6/2017 PASS
DetailsTonya Wallace
Initial residential review of all new news permit requested for now.
Plan assigned to (LEG) Tisha2/28/2017 3/2/2017 DEFR
DetailsTisha Gallop
Routing - Addressing2/28/2017 3/1/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/28/2017 2/28/2017 PASS
DetailsMorgan Webb
Routing - MECHANICAL2/28/2017 2/28/2017 PASS
DetailsTroy James
Plans ACCEPTED BY PLAN TECH  2/28/2017 DONE
DetailsChristina Prado
Intake Approval  2/28/2017 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  2/28/2017 DONE
DetailsChristina Prado
Application received  12/13/2016 DONE
Application submitted via PDS Online on Dec 13 2016 10:31AM