BLD-Final | 12/21/2017 | 12/22/2017 | 12/22/2017 | P | PASS |
Tony Young
|
|
|
Phil Phone #: ###-####
|
DOC - Permit Finaled | 12/22/2017 | 12/22/2017 | 12/22/2017 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Aging Inspection | 12/15/2017 | 12/15/2017 | 12/21/2017 | | PEND |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 12/21/2017 | 12/21/2017 | 12/21/2017 | | DONE |
Mike Sheppard
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 8/2/2017 | 8/3/2017 | 8/3/2017 | A | PASS |
Dave Hannah
|
|
|
Phil Phone #: ###-####
|
BLD-Framing/Rough-in | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | PEND |
Brandon Shaw
|
|
|
Pending Mech rough in passing later today, pressure test. Stairs for main floor to second floor, custom steel, installed at later date.
|
BLD-Other | 7/14/2017 | 7/14/2017 | 7/14/2017 | P | PASS |
Tony Young
|
|
|
Phil-soffits Phone #: ###-####
|
Plan Modification Accepted | | | 7/6/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 7/6/2017 | | 7/6/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 6/22/2017 | 6/22/2017 | 6/22/2017 | P | PART |
Tony Young
|
|
|
John Phone #: ###-####,, exterior ok after minor fixes
|
BLD-Foundation | 3/22/2017 | 3/22/2017 | 3/22/2017 | P | PART |
Tony Young
|
|
|
Wall pour time 3 // Bill Phone #: ###-####,, work in progress
|
BLD-Footing | 3/15/2017 | 3/16/2017 | 3/16/2017 | A | PASS |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 3/15/2017 | 3/15/2017 | 3/15/2017 | P | PART |
Tony Young
|
|
|
Pour time 2 // Bill Phone #: ###-####,, not set up all the way yet,, work in progress,, ok for foundation changes to match dig,, non structural issues
|
PubWorks Subgrade Approval | 3/13/2017 | 3/13/2017 | 3/13/2017 | | DONE |
Jason C. Taylor
|
|
|
**entire building pad**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 3/3/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 2/27/2017 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/27/2017 | | DONE |
|
|
|
|
Telephone call | | | 2/27/2017 | | DONE |
|
|
|
called John to let know permit is ready and how much was owed and that we need the RP
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2017 | | DONE |
|
|
|
For some reason when Tisha is Plans Taken to Front Desk permit did not go into fee status.
|
Permit Ready to Issue | | | 2/27/2017 | | DONE |
|
|
|
Need RP, John Seidl expired 10/14/16
|
Case Summary (BLD) | | | 2/27/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2017 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 1/5/2017 | | 2/27/2017 | | DONE |
Tisha Gallop
|
|
|
2nd review 2/1 (plan review report); 1st review 1/6; L2 hillside (plan review report)
|
Routing - PLAN CHECK | 2/22/2017 | | 2/23/2017 | | PASS |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 2/22/2017 | | DONE |
|
|
|
two copies of foundation sheet
|
Routing - PLAN CHECK | 2/9/2017 | | 2/15/2017 | | FAIL |
Tisha Gallop
|
|
|
correct foundation sheets needs eng. stamp
|
Plan resubmittals received | | | 2/9/2017 | | DONE |
|
|
|
Resubmittals received 2 sets of engineering calcs, eave vent, styrofoam & 2 sets of sheets A2.1, A4.1, A4.2, S2.0, S2.0 & S2.1-took to Tisha
|
Routing - PLAN CHECK | 1/26/2017 | | 2/1/2017 | | FAIL |
Tisha Gallop
|
|
|
see plan review report
|
Plan resubmittals received | | | 1/26/2017 | | DONE |
|
|
|
received (2) sets of plan resubmittals
|
1st review completed | | | 1/6/2017 | | FAIL |
|
|
|
pending approval by plan check
|
Routing - PLAN CHECK | 12/23/2016 | | 1/6/2017 | | FAIL |
David Ferguson
|
|
|
see plan review report
|
Plan assigned to (DAF) | 12/16/2016 | 12/16/2016 | 1/5/2017 | | DEFR |
David Ferguson
|
|
|
due 12/30
|
Routing - FIRE | 12/23/2016 | 12/13/2016 | 12/23/2016 | | PASS |
Scott Arellano
|
|
|
No seperate comments attached. This structure is subject to inspection by the Fire Department in regards to implementing a 30 foot defensible space from wildland fuel loading.
|
Routing - PUBLIC WORKS | 12/23/2016 | | 12/23/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 12/23/2016 | | 12/23/2016 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 12/23/2016 | | 12/23/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Erosion and Sediment | 12/20/2016 | | 12/21/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid PD and RP. Site preparation inspection required.
|
Routing - MECHANICAL | | | 12/20/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/16/2016 | | 12/16/2016 | | PASS |
Leon Letson
|
|
|
|
Plan assigned to (LEG) Tisha | 12/13/2016 | | 12/16/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 12/16/2016 | | 12/16/2016 | | FAIL |
Rachael Beierle
|
|
|
SEE HILLSIDE
|
Routing PW Grading-Hillside | 12/14/2016 | | 12/16/2016 | | FAIL |
Jason C. Taylor
|
|
|
Need signed conditons of approval returned. JCT
|
Routing PW Sewer Rating | 12/14/2016 | | 12/14/2016 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 12/13/2016 | | 12/14/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/13/2016 | | DONE |
|
|
|
|
Intake Approval | | | 12/13/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/13/2016 | | DONE |
|
|
|
|
Application received | | 12/13/2016 | | | |
|
|
|
|