BLD-Final | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Dave Hannah
|
|
|
David Banks ###-####
|
BLD-Final | 10/17/2017 | 10/19/2017 | 10/20/2017 | P | CANC |
Dave Hannah
|
|
|
Chris-this is to close the foundation Phone #: ###-####
|
BLD-Aging Inspection | 10/12/2017 | 10/12/2017 | 10/16/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/11/2017 | 10/11/2017 | 10/16/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Conference | 6/29/2017 | 6/30/2017 | 6/29/2017 | A | CANC |
Dave Hannah
|
|
|
Building fire rating consultation. Phone #: ###-#### >> Inspection requested via web by Nicholas Miller Inspection cancelled from web by: Nicholas Miller
|
BLD-Concrete | 5/23/2017 | 5/25/2017 | 5/30/2017 | A | PASS |
Dave Hannah
|
|
|
7 am slab pour. 65 yards of concrete. MTI will be present. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Footing | 5/23/2017 | 5/23/2017 | 5/24/2017 | P | PEND |
Dave Hannah
|
|
|
Footings at 2pm. MTI will be present as always. Phone #: ###-#### Inspection requested via web by Nicholas Miller ok after spec insection sign off
|
BLD-Concrete | 4/20/2017 | 4/21/2017 | 4/21/2017 | A | PASS |
Dave Hannah
|
|
|
We will be pouring one third of our building slab starting at 8 am. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Footing | 4/14/2017 | 4/17/2017 | 4/18/2017 | P | PASS |
Dave Hannah
|
|
|
The pour is scheduled for 1PM. MTI will also be present for a rebar inspection. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Conference | 4/12/2017 | 4/13/2017 | 4/13/2017 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Miller. question regarding the sprinkler system being energized prior to vertical construction. Refered to fire.
|
BLD-Foundation | 3/31/2017 | 3/31/2017 | 4/3/2017 | P | PASS |
Dave Hannah
|
|
|
The pour is scheduled for 1 pm. MTI will be present to inspect the rebar and oversee the pour. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Foundation | 3/29/2017 | 3/30/2017 | 3/30/2017 | A | CANC |
Dave Hannah
|
|
|
The pour is scheduled for 9 am. MTI will be present for a rebar inspection. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Footing | 3/27/2017 | 3/28/2017 | 3/29/2017 | P | PASS |
Dave Hannah
|
|
|
The pour is scheduled for 2 pm. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Foundation | 3/27/2017 | 3/28/2017 | 3/29/2017 | P | PASS |
Dave Hannah
|
|
|
The pour is scheduled for 2 pm. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Footing | 3/21/2017 | 3/23/2017 | 3/23/2017 | A | PASS |
Dave Hannah
|
|
|
The pour is scheduled for 11. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Footing | 3/21/2017 | 3/22/2017 | 3/23/2017 | A | PASS |
Dave Hannah
|
|
|
The pour is scheduled for 11. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Footing | 3/15/2017 | 3/16/2017 | 3/20/2017 | A | PASS |
Dave Hannah
|
|
|
The pour is scheduled for noon. We plan on pouring footings and foundation walls on the east and west ends of the building. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Foundation | 3/15/2017 | 3/16/2017 | 3/20/2017 | A | PASS |
Dave Hannah
|
|
|
The pour is scheduled for noon. We plan on pouring footings and foundation walls on the east and west ends of the building. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Foundation | 3/8/2017 | 3/9/2017 | 3/10/2017 | A | PASS |
Dave Hannah
|
|
|
The concrete pour is scheduled for noon tomorrow. We plan on pouring footings and foundation. I will request an inspection for both. Thank you. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Footing | 3/8/2017 | 3/9/2017 | 3/10/2017 | A | PASS |
Dave Hannah
|
|
|
The concrete pour is scheduled for noon tomorrow. We plan on pouring footings and foundation. I will request an inspection for both. Thank you. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Footing | 2/28/2017 | 3/1/2017 | 3/1/2017 | A | PEND |
Dave Hannah
|
|
|
Pour at 11 // Nick Phone #: ###-#### ok after spec inspection sign off
|
BLD-Foundation | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PASS |
Dave Hannah
|
|
|
Pouring at 10 - Chris-rebar Phone #: ###-####
|
BLD-Foundation | 2/14/2017 | 2/15/2017 | 2/15/2017 | A | PEND |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/14/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/14/2017 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 12/30/2016 | 12/30/2016 | 2/8/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp. Hilton Garden Boise
|
Routing - PLAN CHECK | 2/1/2017 | | 2/8/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Design Review | 2/1/2017 | | 2/8/2017 | | PASS |
Sarah Schafer
|
|
|
|
Routing Off Site - STRUCTURAL | 2/1/2017 | | 2/8/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Sewer Design | 2/1/2017 | | 2/8/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Signed off per E-plan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/8/2017 | | DONE |
|
|
|
***all requirments met 2-14-17
Needs; GC Form, Revised Cert of Value, Cross-parking Easement agreement (see Angie Brosious or Sarah Schafer)
|
Routing - PUBLIC WORKS | 2/1/2017 | | 2/1/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Flood Plain | 1/3/2017 | | 2/1/2017 | | PASS |
Jim Wyllie
|
|
|
|
Routing - Design Review | 12/30/2016 | | 2/1/2017 | | FAIL |
Josh Wilson
|
|
|
failed per original review
|
Route to Impact Fee Review | 1/27/2017 | 1/30/2017 | 1/30/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 12/30/2016 | | 1/27/2017 | | FAIL |
Carl D Madsen
|
|
|
Fail pending other department approvals
|
Routing Off Site - STRUCTURAL | 12/30/2016 | | 1/27/2017 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 1/27/2017 | | FAIL |
|
|
|
|
Routing PW Sewer Design | 1/3/2017 | | 1/12/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Unresolved public sewer issue.
|
Routing PW Geothermal | 1/3/2017 | | 1/6/2017 | | PASS |
Jon R. Gunnerson
|
|
|
No connection to City Geothermal
|
Routing PW Solid Waste | 1/3/2017 | | 1/5/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing PW Drainage | 1/3/2017 | | 1/3/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 12/30/2016 | | 1/3/2017 | | PASS |
Cody Riddle
|
|
|
DR Only
|
Routing - PLANNING Land Div | 12/30/2016 | | 1/3/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - PUBLIC WORKS | 12/30/2016 | | 1/3/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 12/30/2016 | | 1/3/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid Plan Designer. RP to be designated
|
Routing - Addressing | 12/30/2016 | | 12/30/2016 | | PASS |
Laura Hunter
|
|
|
Address changed to 348 S 13th St
|
Intake Approval | | | 12/30/2016 | | PASS |
|
|
|
|
Intake Approval | | | 12/15/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following documents requested from the checklist and upload:
1. Verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff
2. Identify required special inspections on structural plans
3. Form #310 – Statement of Special Inspections must be completed by the design engineer
4. Erosion & Sediment Control (ESC) Narrative. Narrative must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
5. ESC plans, Plans must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
|
Application received | | | 12/13/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 13 2016 5:10PM
|