Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD16-04484
StatusFinaled
Name PERRYMAN CONSTRUCTION MANAGEMENT IN
Site Address 12584 W IRVING ST
Project NameThe Cottages at White Clouds
Customer NumberBLD16-04485 EPLANS
ePlanReviewYes
Description
(2 PERMITS TOTAL FILED UNDER BLD16-04485 IN EPLANREVIEW) **Special inspection is required, see form #310** Plan P-5 - Permit for the construction of a new 1415 sq. ft., two story (first story 577 sq. ft., second story 838 sq. ft.) Townhouse with 2 bedrooms, 2.5 bathrooms, and a 440 sq. ft. attached garage per the approved plans, engineering, ResCheck, ACCA report and any notations. R-1C zoning and setbacks per planning. //leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/21/20189/21/20189/21/2018PPASS
DetailsMike Jordan
Plumbing final scheduled for this afternoon. Requesting late PM inspection. Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Blower Door Test Results9/21/20189/21/20189/21/2018PDONE
DetailsMike Jordan
5.7ACH @50pa.
DOC - Permit Finaled9/21/20189/21/20189/21/2018PPASS
DetailsMike Jordan
BLD-Energy code compliance6/26/20186/26/20186/26/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Framing/Rough-in6/26/20186/26/20186/26/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown. All issues have been resolved.
BLD-Framing/Rough-in6/21/20186/21/20186/21/2018PFAIL
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Energy code compliance6/21/20186/21/20186/21/2018PFAIL
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Sam Brown c/n items not complted
BLD-Framing/Rough-in6/11/20186/11/20186/11/2018AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown. Nail 2ply D03 truss per engineering and nail off hangars. Fireblock concealed spaces upstairs. Install break away clips on fire wall. Upstairs window in bathroom required to be tempered. Install full length 2x6 stud down stairs at notch 2x6 west wall. Ok to insulate. Correction notice posted.
BLD-Framing/Rough-in6/6/20186/6/20186/6/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown. Needs mech. permit and mech. rough in inspection prior to framing inspection.
BLD-Wall Bracing3/8/20183/8/20183/8/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Wall Bracing3/7/20183/7/20183/7/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Wall Bracing3/5/20183/5/20183/5/2018PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Sam Brown Inspection cancelled from web by: Sam Brown
BLD-Foundation11/21/201711/21/201711/21/2017PPASS
DetailsMike Jordan
rebar // sam Phone #: ###-####. Interior thickend footings.
BLD-Foundation9/28/20179/28/20179/28/2017PPASS
DetailsMike Jordan
Insulation // Sam Phone #: ###-####
BLD-Foundation9/26/20179/26/20179/26/2017PPASS
DetailsBrandon Shaw
Manuel Phone #: ###-####
BLD-Footing9/25/20179/25/20179/26/2017PPASS
DetailsBrandon Shaw
Manuel Phone #: ###-####
Issue PAID IN FULL permit  9/12/2017 DONE
Inspection Record Card- Bld  9/12/2017 DONE
OVERRIDE  9/8/2017  
Plan assigned to (LEG) Tisha2/28/2017 9/8/2017 DONE
DetailsTisha Gallop
2nd review 8/30; 1st review 3/17 L2 townhouse
Routing - PLAN CHECK9/1/2017 9/8/2017 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  9/8/2017 DONE
Permit Ready to Issue  9/8/2017 DONE
MET-do not issue without BLD16-04485
Plan resubmittals received  9/1/2017 DONE
Routing - PLAN CHECK8/22/2017 8/30/2017 FAIL
DetailsTisha Gallop
correct P5 overhang and wrong lot number on engineering sheets
Plan resubmittals received  8/22/2017 DONE
Extend Review Timeline  6/5/2017 DONE
1st approved 180 day extension per Adele. See documents
Expiration Notice5/18/20176/9/20175/18/2017 DONE
DetailsBrittany Hill
1st review completed  3/17/2017 DONE
pending approval by plan check
Routing - PLAN CHECK2/28/2017 3/17/2017 FAIL
DetailsTisha Gallop
shear
Route to Impact Fee Review2/28/20173/3/20173/6/2017 PASS
DetailsTonya Wallace
Initial residential review of all new news permit requested for now.
Routing - Addressing2/28/2017 3/1/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/28/2017 2/28/2017 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  2/28/2017 DONE
DetailsChristina Prado
Intake Approval  2/28/2017 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  2/28/2017 DONE
DetailsChristina Prado
Routing - MECHANICAL2/28/2017 2/28/2017 PASS
DetailsTroy James
Routing - PLANNING2/28/2017 2/28/2017 PASS
DetailsCody Riddle
Application received  12/14/2016 DONE
Application submitted via PDS Online on Dec 14 2016 8:10AM