Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD16-04498
StatusFinaled
Name PERRYMAN CONSTRUCTION MANAGEMENT IN
Site Address 12628 W IRVING ST
Project NameThe Cottages at White Clouds
Customer NumberBLD16-04499 EPLAN
ePlanReviewYes
Description
(2 PERMITS TOTAL FILED UNDER BLD16-04499 IN EPLANREVIEW) **Special inspection is requird, see form #310** Plan P-5 - Permit for the construction of a new 1415 sq. ft., two story (first story 577 sq. ft., second story 838 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, and a 440 sq. ft. attached garage per the approved plans, engineering, ResCheck ACCA report and any notations. R-1C zoning and setbacks per planning. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/19/201810/19/201810/19/2018PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Sam Brown
DOC - Permit Finaled10/19/201810/19/201810/19/2018PPASS
DetailsJim Sly
BLD-Final10/18/201810/18/201810/18/2018PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown. Correction notice posted.
BLD-Blower Door Test Results10/18/201810/18/201810/18/2018PDONE
DetailsMike Jordan
5.7ACH @50 pa
BLD-Energy code compliance8/27/20188/27/20188/27/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Framing/Rough-in8/27/20188/27/20188/27/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Framing/Rough-in8/20/20188/20/20188/20/2018PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown. Strap double top plate at 1/2 inch gas pipe penetration. Nail off simpson hangar on 2ply girder truss upsatirs. Window next to shower requied to be tempered. Ok to insulate. Correction notice posted.
BLD-Wall Bracing4/23/20184/23/20184/23/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Aging Inspection4/4/20184/4/20184/5/2018 PASS
DetailsMike Jordan
BLD-Aging Inspection4/5/20184/5/20184/5/2018 PASS
DetailsMike Jordan
BLD-Foundation11/21/201711/21/201711/21/2017PPASS
DetailsMike Jordan
rebar // sam Phone #: ###-####. Interior thickend footings.
BLD-Foundation10/23/201710/23/201710/23/2017PPASS
DetailsMike Jordan
Sam Phone #: ###-####. Rigid insualtion on stemwall under slab on grade.
BLD-Foundation10/18/201710/18/201710/18/2017PPASS
DetailsMike Jordan
Sam Phone #: ###-####
BLD-Footing10/17/201710/17/201710/17/2017PPASS
DetailsMike Jordan
Manny Phone #: ###-####
Issue PAID IN FULL permit  10/17/2017 DONE
Inspection Record Card- Bld  10/17/2017 DONE
OVERRIDE  9/8/2017  
Plan assigned to (BJM)3/1/20173/1/20179/8/2017 DONE
DetailsBrian McGowan
2nd review 8/30; 1st Review Complete -Due 3-17 Level 2 - Fail -Wall bracing was done as a duplex and floor plans and structure did not all match
Routing - PLAN CHECK9/8/2017 9/8/2017 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  9/8/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  9/8/2017 DONE
Need
GC Form-met
RP-met
Routing - PLAN CHECK9/6/2017 9/6/2017 FAIL
DetailsBrian McGowan
See notes by Tisha
Routing - PLAN CHECK8/22/2017 8/30/2017 FAIL
DetailsBrian McGowan
correct roof framing, wrong lot number on foundation and framing sheets only
Plan resubmittals received  8/22/2017 DONE
Routing - PLANNING2/28/2017 7/6/2017 PASS
DetailsCody Riddle
Extend Review Timeline  6/5/2017 DONE
1st approved 180 day extension per Adele. See documents
Expiration Notice5/18/20176/9/20175/18/2017 DONE
DetailsBrittany Hill
1st review completed  3/21/2017 FAIL
DetailsBrian McGowan
Wall bracing was done as a duplex, structure and floor plans need to match
Routing - PLAN CHECK2/28/2017 3/21/2017 FAIL
DetailsBrian McGowan
Wall bracing was done as a duplex, structure and floor plans need to match
Route to Impact Fee Review2/28/20173/3/20173/6/2017 PASS
DetailsTonya Wallace
Initial residential review of all new news permit requested for now.
Routing - MECHANICAL2/28/2017 3/1/2017 PASS
DetailsTroy James
Routing - Addressing2/28/2017 3/1/2017 PASS
DetailsLaura Hunter
Plan assigned to (LEG) Tisha2/28/2017 3/1/2017 DEFR
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  2/28/2017 DONE
DetailsChristina Prado
Intake Approval  2/28/2017 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  2/28/2017 DONE
DetailsChristina Prado
Routing - PUBLIC WORKS2/28/2017 2/28/2017 PASS
DetailsMorgan Webb
Application received  12/14/2016 DONE
Application submitted via PDS Online on Dec 14 2016 10:52AM