Second Notice | | 12/22/2017 | 12/19/2017 | | DONE |
|
|
|
This permit finaled on the web by Mike Huttash
|
First Notice | | 11/27/2017 | 12/12/2017 | | DONE |
|
|
|
sent in mail 12-13/17
|
Print Occupancy Form | | | 11/17/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/17/2017 | | DONE |
|
|
|
|
BLD-Aging Inspection | 10/5/2017 | 10/5/2017 | 10/5/2017 | | PASS |
Mike Jordan
|
|
|
Needs to pick up C.O.
|
BLD-Final | 5/23/2017 | 5/24/2017 | 5/24/2017 | A | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 5/17/2017 | 5/17/2017 | 5/18/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the existing fire extinguishers and add one in the back corridor. Provide testing for all of the exit signs and emergency lights.
|
BLD-Final | 5/16/2017 | 5/17/2017 | 5/17/2017 | A | NR |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Needs fire/life/safety.
|
BLD-Final | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | NR |
Jim Storey
|
|
|
Tom Phone #: ###-#### mech permit and final insp.
|
BLD-Framing/Rough-in | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PASS |
Mike Jordan
|
|
|
Tom would like late AM if possible Phone #: ###-####. Interior steel stud framed walls ok phase 2 no grid. Soffit framing ok, pending fire sprinkler rough in inspection.
|
BLD-Framing/Rough-in | 3/8/2017 | 3/8/2017 | 3/8/2017 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####-please do inspection late pm so the ele inspector can do his inspection early am. Phase 1, interior steel stud framed walls for offices, breakroom.
|
CHANGE STATUS TO (ISS) | | | 3/8/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/8/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 3/2/2017 | 3/5/2017 | 3/6/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
TW - Impact fee assessment is based on information provided, which does not appear to be complete regarding change in use. As such, it is assumed at this time that there is no change in use or expansion of space. If additional information is acquired, another impact fee review would be required.
|
Plan assigned to (CDM) | 3/2/2017 | 3/2/2017 | 3/6/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 3/6/2017 | | 3/6/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/6/2017 | | DONE |
|
|
|
DO NOT REISSU PLAN MOD
|
Plan Modification Accepted | | | 3/2/2017 | | DONE |
|
|
|
plan mod excepted in e plan-plan mod app in docs
|
Issue PAID IN FULL permit | | | 3/1/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/1/2017 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 12/19/2016 | 12/19/2016 | 12/28/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 12/19/2016 | | 12/28/2016 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 12/28/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/28/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/28/2016 | | DONE |
|
|
|
NEED GC form and certificate of value
|
Routing - MECHANICAL | 12/19/2016 | | 12/27/2016 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - FIRE | 12/19/2016 | 12/19/2016 | 12/20/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Addressing | 12/19/2016 | | 12/20/2016 | | PASS |
Laura Hunter
|
|
|
Added new address: 400 N Mitchell St to building with this TI
|
Routing - PUBLIC WORKS | 12/19/2016 | | 12/19/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLUMBING | 12/19/2016 | | 12/19/2016 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 12/19/2016 | | PASS |
Javier Guzman
|
|
|
|
Plan Reviewer's activity | | | 12/17/2016 | | DONE |
Javier Guzman
|
|
|
Per Carl Madsen OK to take in without the Suez fire flow letter and later upload when submitted
|
Intake Approval | | | 12/15/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following documents requested from the checklist and upload (Incomplete submittals will not be accepted):
1. Form #304 – Registered Design Professional form
2. Site specific fire flow at hydrants letter from Suez Water or other public water provider.
|
Application received | | | 12/14/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 14 2016 1:32PM
|