Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD16-04513
StatusFinaled
Name PERRYMAN CONSTRUCTION MANAGEMENT IN
Site Address 12684 W IRVING ST
Project NameThe Cottages at White Clouds
Customer NumberBLD16-04514
ePlanReview 
Description
(2 PERMITS IN EPLAN UNDER PERMIT BLD16-04514) Permit for the construction of a new 1,122 sq. ft., two story (first story 368 sq. ft., second story 754 sq. ft.) Townhouse with 2 bedrooms, 2 bathrooms, approximately 81 sq. ft. of covered patio/porch and a 537 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/8/201811/8/201811/8/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
DOC - Permit Finaled11/8/201811/8/201811/8/2018PPASS
DetailsMike Jordan
BLD-Blower Door Test Results11/8/201811/8/201811/8/2018PDONE
DetailsMike Jordan
5.8 ACH @ 50pa
BLD-Energy code compliance8/27/20188/27/20188/27/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Framing/Rough-in8/22/20188/22/20188/22/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Wall Bracing5/2/20185/2/20185/2/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Wall Bracing5/1/20185/1/20185/1/2018AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Footing4/11/20184/12/20184/12/2018APASS
DetailsMike Jordan
Thickened footings at s.o.g. Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Energy code compliance4/4/20184/4/20184/4/2018PPASS
DetailsMike Jordan
Foundation Insulation Phone #: ###-#### Inspection requested via web by Sam Brown
BLD-Foundation3/30/20184/2/20184/2/2018APASS
DetailsMike Jordan
late morning- wall- Dane Phone #: ###-####
BLD-Foundation3/29/20183/30/20183/30/2018PNR
DetailsBrandon Shaw
Dane Black Phone #: ###-####
BLD-Footing3/28/20183/29/20183/29/2018PPASS
DetailsMike Jordan
Dean Black Phone #: ###-####
Telephone call  1/2/2018 DONE
Left a message for the project manager, voicemail did not state name, informing them that this permit is now 24 days past the expiration date, has had the two allowed 180 day extensions and therefore would either need to be picked up or expired by 5pm today. Left the amount due for issuance and my phone number
Inspection Record Card- Bld  1/2/2018 DONE
Issue PAID IN FULL permit  1/2/2018 DONE
(F) Reprint permit  1/2/2018 DONE
Telephone call  12/19/2017 DONE
Spoke with Kelly informing him that these permits are 10 days past the experation date and if he would like he may send in a request for a 180 day extension. He stated he would have to get with his customer and asked if I could send him an email with the info, see documents
Telephone call  11/29/2017 DONE
Left a message for Kelly informing him that this permit is going to expire in 10 days and if he would like he may send in a final request for a 180 day extension. Asked him to give me a call if this project is no longer being done and need to void the permit
Expiration Notice11/21/201712/13/201711/21/2017 DONE
DetailsBrittany Hill
OVERRIDE  9/8/2017  
Plan assigned to (BJM)3/1/20173/1/20179/8/2017 DONE
DetailsBrian McGowan
1st Review Complete -Due 3-17 Level 2 - Fail -Engineering submitted as duplex, not townhomes
Routing - PLAN CHECK8/23/2017 9/8/2017 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  9/8/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  9/8/2017 DONE
need RP-do not issue without BLD17-04514
Plan resubmittals received  8/23/2017 DONE
Routing - PLANNING2/28/2017 7/6/2017 PASS
DetailsCody Riddle
Extend Review Timeline  6/5/2017 DONE
1st approved 180 day extension per Adele. See documents
Expiration Notice5/18/20176/9/20175/18/2017 DONE
DetailsBrittany Hill
1st review completed  3/23/2017 FAIL
DetailsBrian McGowan
Engineering submitted as duplex, not townhomes
Routing - PLAN CHECK2/28/2017 3/23/2017 FAIL
DetailsBrian McGowan
Engineering submitted as duplex, not townhomes
Route to Impact Fee Review2/28/20173/3/20173/6/2017 PASS
DetailsTonya Wallace
Initial residential review of all new news permit requested for now.
Routing - Addressing2/28/2017 3/1/2017 PASS
DetailsLaura Hunter
Plan assigned to (LEG) Tisha2/28/2017 3/1/2017 DEFR
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  2/28/2017 DONE
Intake Approval  2/28/2017 PASS
Recd Pcfee & Taken To Pln CK  2/28/2017 DONE
Routing - PUBLIC WORKS2/28/2017 2/28/2017 PASS
DetailsMorgan Webb
Routing - MECHANICAL2/28/2017 2/28/2017 PASS
DetailsTroy James
Application received  12/14/2016 DONE
Application submitted via PDS Online on Dec 14 2016 3:34PM