**Plan Modification 2-1-17 Permit to vault existing hand stacked roof on the Upper Floor by adding a glu lam beam at the ridge and raising the collar ties. Non-bearing interior walls are being removed on the Upper Floor. The Master Bath floor space will be expanded into the Living Room and Upper Floor area. Support for this new floor will carry to footings in the crawl space. Existing doorway in Mud Room on Main Floor will be filled in and a new opening will be added into a non-bearing wall. The fireplace and bookcases on the Main Floor are being removed. No new footings are being added. No additional room locations are proposed at this time. Owner will bring in room locations at a future date ( a couple weeks from the issue of this permit). All work to be done according to plans, notes, review notes and local codes. No electrical, plumbing, or mechanical are proposed for the Upper or Main Floors for this permit. - BJM*** *** Plan Modification *** Home is in Hillside and WUI Zone "A" - NO exterior work besides window replacement at the Mst. Bedroom and Library areas is proposed. Permit to remove all existing gypsum board throughout home to reveal potential areas of concern and existing structure in order to replace and repair plumbing, electrical and insulate as needed. No walls are to be added or removed at this point. Detailed plans must be provided to the City prior to any further work. Plans have been provided to remodel Master Bedroom and Library area. Existing wall between Master bedroom and Library is bearing and will be replaced with a balloon framed bearing wall to the existing 2x8 roof rafter construction. The ceiling will become vaulted with new, unvented attic space with spray foam insulation providing a minimum R38 value. The existing wall separating the sinks from Bedroom area is being removed. Exterior windows and a door on this level only are being replaced. Insulation in exterior walls will be replaced with R13 or better. Separate electrical, plumbing and mechanical permits are required. All work to be done according to provided plans, notes and review notes. **BJM**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference3/15/20193/18/20193/18/2019APART
DetailsTony Young
Charlie Phone #: ###-####,, extensive hand and guardrail consult
BLD-Aging Inspection12/28/201812/28/201812/31/2018 PEND
DetailsTony Young
BLD-Aging Inspection12/27/201812/27/201812/31/2018 PEND
DetailsTony Young
BLD-Energy code compliance8/15/20188/15/20188/15/2018PPASS
DetailsTony Young
Phone #: ###-####,, garage insulation ok to cover
Routing - MECHANICAL6/7/2018 6/7/2018 PASS
DetailsTroy James
manual j report submitted
BLD-Other6/5/20186/6/20186/6/2018APASS
DetailsTony Young
Edward Phone #: ###-####,, soffits ok
BLD-Framing/Rough-in6/4/20186/5/20186/5/2018APASS
DetailsTony Young
Edward Phone #: ###-####,, garage ok to insulate
BLD-Aging Inspection4/13/20184/13/20184/19/2018 PASS
DetailsTony Young
BLD-Conference4/17/20184/17/20184/17/2018PPASS
DetailsTony Young
Mike Phone #: ###-####,, girder nailing ok
BLD-Conference2/13/20182/13/20182/13/2018PPART
DetailsTony Young
Mike Phone #: ###-####,, building walk through,, ok to cover interior basement walls
BLD-Wall cover11/30/201711/30/201711/30/2017PPASS
DetailsTony Young
sofits // Mike Phone #: ###-####,, work in progress,, ok
BLD-Energy code compliance10/25/201710/27/201710/27/2017PPART
DetailsTony Young
Mike ; Phone #: ###-####,, ok to cover insulated areas
BLD-Energy code compliance10/25/201710/26/201710/27/2017PPART
DetailsTony Young
Mike ; Phone #: ###-####,, upper areas ok
BLD-Framing/Rough-in10/24/201710/25/201710/25/2017APASS
DetailsTony Young
Mike ; Phone #: ###-####
BLD-Framing/Rough-in10/24/201710/24/201710/25/2017PDEFR
DetailsTony Young
Mike ; Phone #: ###-####
BLD-Framing/Rough-in9/20/20179/21/20179/21/2017APART
DetailsTony Young
Ed ###-####. Partial inspection only.
Ok to insulate kitchen walls/ceiing, master bedroom, bath and library only.
BLD-Framing/Rough-in9/20/20179/20/20179/20/2017PPART
DetailsTony Young
Ed ###-####. Partial inspection only. customer came in back in March for a plan mod, but it failed required engnieering. Call Brian M with quesitons.,, on site conf only,, need trades
CHANGE STATUS TO (ISS)  9/20/2017 DONE
last plan mod was not approved for upstairs wall bracing. per Brian McGowan needs engineering.
CHANGE STATUS TO (REV)  8/24/2017 DONE
walk in plan mod failed 3/29/17
Routing Walk-In (BLD)3/29/20173/29/20173/29/2017AFAIL
DetailsBrian McGowan
Needed to revise plans to meet/show wall bracing compliance.
1st review completed  3/29/2017 FAIL
DetailsBrian McGowan
Needed to revise plans to meet/show wall bracing compliance.
CHANGE STATUS TO (ISS)  2/3/2017 DONE
Plan mod
(F) Reprint permit  2/3/2017 DONE
CHANGE STATUS TO (ISS)  2/3/2017 DONE
plan mod was signed for on 2/3/17
Permit Ready to Issue  2/2/2017 DONE
PLEASE DO NOT RE ISSUE
Telephone call  2/2/2017 DONE
called Ed to let know plan mod is ready and how much is owed
Plan assigned to (BJM)1/31/20171/31/20172/1/2017 DONE
DetailsBrian McGowan
1st review completed  2/1/2017 DONE
DetailsBrian McGowan
Case Summary (BLD)  2/1/2017 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  2/1/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  2/1/2017 DONE
DetailsBrian McGowan
Routing - PLAN CHECK1/31/2017 2/1/2017 PASS
DetailsBrian McGowan
Plan Modification Accepted  1/31/2017 DONE
plan modification have been submitted
Routing Walk-In (BLD)1/30/20171/30/20171/30/2017AFAIL
DetailsBrian McGowan
Needed to separate the proposed modifications by floor level. Plans were difficult to distinguish as to what was being done on what floor.
Routing - PLAN CHECK1/30/2017 1/30/2017 FAIL
DetailsBrian McGowan
Needed to separate the proposed modifications by floor level. Plans were difficult to distinguish as to what was being done on what floor.
Plan assigned to (BJM)1/23/20171/23/20171/23/2017 FAIL
DetailsBrian McGowan
Needed to separate the proposed modifications by floor level. Plans were difficult to distinguish as to what was being done on what floor.
1st review completed  1/23/2017 FAIL
DetailsBrian McGowan
Needed to separate the proposed modifications by floor level. Plans were difficult to distinguish as to what was being done on what floor.
Routing - PLAN CHECK1/23/2017 1/23/2017 FAIL
DetailsBrian McGowan
Plan Modification Accepted  1/23/2017 DONE
called Brian for plan review
Routing Walk-In (BLD)12/19/201612/19/201612/19/2016ADONE
DetailsBrian McGowan
Routing - PLAN CHECK12/19/2016 12/19/2016 PASS
DetailsBrian McGowan
Case Summary (BLD)  12/19/2016 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  12/19/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  12/19/2016 DONE
DetailsBrian McGowan
Permit Ready to Issue  12/19/2016 DONE
Telephone call  12/19/2016 DONE
called Ed to let know permit is ready and how much is owed
Issue PAID IN FULL permit  12/19/2016 DONE
Routing Walk-In (BLD)12/15/201612/15/201612/15/2016AFAIL
DetailsBrian McGowan
Need ESR for foam insulation, additional details, floor plans of remainder of home. He will bring in existing plans from previous remodel.
1st review completed  12/15/2016 FAIL
DetailsBrian McGowan
Need ESR for foam insulation, additional details, floor plans of remainder of home. He will bring in existing plans from previous remodel.
Routing - PLAN CHECK12/15/2016 12/15/2016 FAIL
DetailsBrian McGowan
Need ESR for foam insulation, additional details, floor plans of remainder of home. He will bring in existing plans from previous remodel.
Application received 12/15/2016   
Routing - PLAN CHECK3/29/2017   FAIL
DetailsBrian McGowan
Needed to revise plans to meet/show wall bracing compliance.