BLD-Final | 6/29/2017 | 6/29/2017 | 6/29/2017 | P | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 6/29/2017 | 6/29/2017 | 6/29/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 6/22/2017 | 6/23/2017 | 6/23/2017 | P | NR |
Jim Sly
|
|
|
Dave Phone #: ###-#### Need Co2 Det.........
|
BLD-Framing/Rough-in | 6/22/2017 | 6/23/2017 | 6/23/2017 | P | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 2/27/2017 | 2/28/2017 | 2/28/2017 | A | NR |
Jim Sly
|
|
|
call ahead for access Phone #: ###-#### Need Electr......
|
BLD-Framing/Rough-in | 2/14/2017 | 2/15/2017 | 2/15/2017 | A | NR |
Jim Sly
|
|
|
would like call ahead Phone #: ###-#### Need plumbing / Electrical permit and Rough-in approvals
|
Routing Walk-In (BLD) | 12/29/2016 | 12/29/2016 | 12/29/2016 | A | PASS |
Brian McGowan
|
|
|
Rescanned the permit without the actual costs on the insurance spread sheets.
|
Routing Walk-In (BLD) | 12/15/2016 | 12/15/2016 | 12/15/2016 | P | DONE |
Brent Moore
|
|
|
|
1st review completed | | | 12/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 12/15/2016 | | 12/15/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 12/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 12/15/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/15/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/15/2016 | | DONE |
|
|
|
|
Application received | | 12/15/2016 | | | |
|
|
|
|