BLD-Final | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
DOC - Permit Finaled | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | NR |
Brandon Shaw
|
|
|
Two Mech permits need to be finaled
|
BLD-Aging Inspection | 10/19/2017 | 10/19/2017 | 10/20/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/18/2017 | 10/18/2017 | 10/19/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Brandon Shaw
|
|
|
Inspection requested via web by SHANE JAYO Ok to cover
|
BLD-Energy code compliance | 6/1/2017 | 6/5/2017 | 6/5/2017 | P | FAIL |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO Framing corrections not made. No Cover.
|
BLD-Framing/Rough-in | 6/1/2017 | 6/1/2017 | 6/1/2017 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, c/n posted,, ok to insulate
|
BLD-Framing/Rough-in | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | DEFR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO,,to pm
|
BLD-Framing/Rough-in | 5/30/2017 | 5/31/2017 | 5/31/2017 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO// needs trades 1st
|
BLD-Conference | 4/7/2017 | 4/10/2017 | 4/10/2017 | A | PASS |
Tony Young
|
|
|
would like call ahead; bill Phone #: ###-####,, need to verify soils report approval,, recieved an email that the soils report was ok
|
PubWorks Subgrade Approval | 4/10/2017 | 4/10/2017 | 4/10/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
BLD-Foundation | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PEND |
Tony Young
|
|
|
would like call ahead; bill Phone #: ###-####
|
BLD-Foundation | 4/6/2017 | 4/6/2017 | 4/6/2017 | P | PEND |
Tony Young
|
|
|
would like call ahead; bill Phone #: ###-####,, ok pending soils/hill side
|
BLD-Footing | 4/3/2017 | 4/3/2017 | 4/3/2017 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | CANC |
Tony Young
|
|
|
Pouring at 1 -Bill Phone #: ###-####
|
BLD-Footing | 3/20/2017 | 3/20/2017 | 3/20/2017 | P | CANC |
Tony Young
|
|
|
Pouring atr 2/ 2:30 - Bill Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/7/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 2/24/2017 | | |
|
|
|
|
Plan assigned to (DAF) | 12/22/2016 | 12/22/2016 | 2/24/2017 | | DONE |
David Ferguson
|
|
|
due 1/04 L2 hillside - review failed - need additional WUI details
|
Routing - PLAN CHECK | 2/24/2017 | | 2/24/2017 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 2/24/2017 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/24/2017 | | DONE |
|
|
|
All Met
|
Inspection Record Card- Bld | | | 2/24/2017 | | DONE |
|
|
|
|
Telephone call | | | 2/24/2017 | | DONE |
Christina Prado
|
|
|
Called Jayo to advise permit is ready and gave fees due
|
Plan resubmittals received | | | 2/23/2017 | | DONE |
|
|
|
Resubmittals received 2 sheets of # 7 of 8-took to Dave F
|
Routing - PLAN CHECK | 12/23/2016 | | 1/9/2017 | | FAIL |
David Ferguson
|
|
|
|
1st review completed | | | 1/9/2017 | | FAIL |
David Ferguson
|
|
|
|
Routing - FIRE | | | 12/23/2016 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Plan assigned to (LEG) Tisha | 12/15/2016 | | 12/22/2016 | | DEFR |
Tisha Gallop
|
|
|
1/4 L2 hillside
|
Routing - Erosion and Sediment | 12/20/2016 | | 12/21/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid RP and PD designated.
|
Routing - MECHANICAL | 12/19/2016 | | 12/20/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/16/2016 | | 12/19/2016 | | PASS |
Susan Riggs
|
|
|
NO PORTION OF THE THE PATIO COVER CAN ENCROACH MORE THAN 2-FEET INTO THE REQUIRED 15-FOOT REAR YARD SETBACK. A VARIANCE IS REQURIED TO DO SO.
|
Routing PW Grading-Hillside | 12/16/2016 | | 12/16/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-#### - NO FEES
|
Routing - Addressing | 12/15/2016 | | 12/16/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/16/2016 | | 12/16/2016 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Sewer Rating | 12/16/2016 | | 12/16/2016 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/15/2016 | | DONE |
|
|
|
|
Intake Approval | | | 12/15/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/15/2016 | | DONE |
|
|
|
|
Application received | | 12/15/2016 | | | |
|
|
|
|