Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD16-04521
StatusFinaled
Name RENEWABLE ENERGY NW LLC
Site Address 2005 N MOUNTAIN VIEW DR
Project NameScanlin Solar Thermal Project
Customer Number 
ePlanReviewYes
Description
Permit to Install (4) thermal solar energy collectors (solar evacuated tube panels, approx. 128 sq. ft.) on the roof of an existing single family dwelling to heat hot water for the home and pool and assist in heating the home. Separate plumbing permit is required. The panels cover less than 33% of the total roof area. All work is to be done according to approved drawings and documents, manufacturers specifications, and current local codes. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/12/201710/13/201710/13/2017APASS
DetailsJim Sly
Carl Phone #: ###-####
DOC - Permit Finaled10/13/201710/13/201710/13/2017PPASS
DetailsJim Sly
Issue PAID IN FULL permit  1/19/2017 DONE
DetailsChristina Prado
Plan assigned to (BJM)12/28/201612/28/20161/18/2017 DONE
DetailsBrian McGowan
Fail- need dimensioned roof plan with panels locations shown -
1-9 - Spoke with Carl, he says he is not capable of providing a roof plan showing where the panels he installed are in comparison to the roof as a whole.
Routing - PLAN CHECK1/18/2017 1/18/2017 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  1/18/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  1/18/2017 DONE
DetailsChristina Prado
All requirements met
Routing - PLAN CHECK1/10/2017 1/10/2017 FAIL
DetailsBrian McGowan
Need the solar tube panels located on a roof plan
Routing - PLAN CHECK1/9/2017 1/9/2017 FAIL
DetailsBrian McGowan
Spoke with Carl, he says he is not capable of providing a roof plan showing where the panels he installed are in comparison to the roof as a whole.
Routing - PLAN CHECK12/29/2016 12/29/2016 FAIL
DetailsBrian McGowan
Need roof plan with location of proposed and existing panels with dimensions.
Plan assigned to (LEG) Tisha12/16/2016 12/28/2016 DEFR
DetailsTisha Gallop
1st review 12/21; need roof plan
Routing - PLAN CHECK12/16/2016 12/21/2016 FAIL
DetailsTisha Gallop
need roof plan
1st review completed  12/21/2016 FAIL
Application received  12/16/2016 DONE
Application submitted via PDS Online on Dec 16 2016 7:40AM
Plans ACCEPTED BY PLAN TECH  12/16/2016 DONE
Intake Approval  12/16/2016 PASS
Recd Pcfee & Taken To Pln CK  12/16/2016 DONE
Routing - PLANNING12/16/2016 12/16/2016 PASS
DetailsSue Cummings