BLD-Final | 4/24/2017 | 4/25/2017 | 4/25/2017 | A | PASS |
Dave Hannah
|
|
|
Carl Phone #: ###-####
|
DOC - Permit Finaled | 4/25/2017 | 4/25/2017 | 4/25/2017 | P | PASS |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 4/24/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/24/2017 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 4/24/2017 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 12/27/2016 | 12/27/2016 | 3/9/2017 | | DONE |
Brian McGowan
|
|
|
Fail- installation report was for a shingled foor, not a metal roof
|
Routing - PLAN CHECK | 3/9/2017 | | 3/9/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2017 | | DONE |
Brian McGowan
|
|
|
(2) hours of Plan review for Plan Modification
|
Permit Ready to Issue | | | 3/9/2017 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/27/2016 | | DONE |
|
|
|
|
Intake Approval | | | 12/27/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/27/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/27/2016 | | 12/27/2016 | | FAIL |
Brian McGowan
|
|
|
installation report was for a shingled foor, not a metal roof
|
Routing - PLANNING | 12/27/2016 | | 12/27/2016 | | PASS |
Sue Cummings
|
|
|
|
1st review completed | | | 12/27/2016 | | FAIL |
Brian McGowan
|
|
|
installation report was for a shingled foor, not a metal roof
|
Application received | | | 12/16/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 16 2016 8:31AM
|