BLD-Final | 11/7/2017 | 11/8/2017 | 11/8/2017 | A | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
FIRE-Final Inspection | 11/7/2017 | 11/8/2017 | 11/8/2017 | A | PASS |
Jim Page
|
|
|
Fire alarm panel integration complete for link, final life fire safety inspection passed/complete.
|
Permanent Occupancy | | | 11/8/2017 | | DONE |
|
|
|
|
Zoning Approval | 11/6/2017 | 11/6/2017 | 11/6/2017 | | PASS |
Sarah Schafer
|
|
|
|
Print Occupancy Form | | | 10/30/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/29/2017 | 6/30/2017 | 6/30/2017 | P | PART |
Troy Cobbley
|
|
|
Temp c of o, phase 3 T.I. is ok for life safety. Fire alarm plans need to be resubmitted for a plan mod due to changes
|
BLD-Conference | 6/29/2017 | 6/29/2017 | 6/29/2017 | P | DONE |
Dave Hannah
|
|
|
Pre walk final if schedule allows. Call Adam when available. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 6/29/2017 | 6/29/2017 | 6/29/2017 | P | CANC |
Jim Page
|
|
|
Fire alarms are not ready, life fire safety rescheduled for 30JUNE2017
|
CHANGE STATUS TO (ISS) | | | 6/28/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/28/2017 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 6/22/2017 | 6/22/2017 | 6/23/2017 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 6/22/2017 | | 6/23/2017 | | PASS |
Carl Westfall
|
|
|
|
Plan Reviewer's activity | | | 6/23/2017 | | DONE |
|
|
|
1st plan mod approved
|
Permit Ready to Issue | | | 6/23/2017 | | DONE |
|
|
|
DO NOT ISSUE PLAN MOD
|
Plan Modification Accepted | | | 6/22/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod to add bike storage
|
BLD-Conference | 6/16/2017 | 6/19/2017 | 6/19/2017 | A | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 5/24/2017 | 5/24/2017 | 5/25/2017 | A | PASS |
Dave Hannah
|
|
|
Walk to review night crew work. Call Adam when heading to site. Thanks. Ash Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 5/22/2017 | 5/22/2017 | 5/23/2017 | A | PASS |
Dave Hannah
|
|
|
Ceiling inspection in meadows. Call Adam when heading to site. Thanks. Akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 5/8/2017 | 5/8/2017 | 5/8/2017 | P | PASS |
Dave Hannah
|
|
|
Recap weekend fireproofing activities. MTI has verified thicknesses. Recap to fridays walk with Hannah. Please call Adam when on site. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 5/4/2017 | 5/5/2017 | 5/7/2017 | P | PASS |
Dave Hannah
|
|
|
2nd Floor FP Patching, 1st floor Mens room, ready for cover. Call Adam when heading to site. Thanks AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | PASS |
Dave Hannah
|
|
|
Review Sign location, call adam when available. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 4/26/2017 | 4/26/2017 | 4/27/2017 | P | PASS |
Dave Hannah
|
|
|
Look at restroom walls for cover. Possibly ready for 2nd floor as well. Call Adam prior to site visit. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 4/24/2017 | 4/24/2017 | 4/26/2017 | P | PART |
Dave Hannah
|
|
|
Framing inspection on 2nd floor Mezzanine, 1st floor Jr. Ballroom. Verification of fireproofing repairs and reinstallations. Call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson first floor walls and part of soffit
|
BLD-Framing/Rough-in | 4/18/2017 | 4/18/2017 | 4/19/2017 | P | PART |
Dave Hannah
|
|
|
ok to install fire treated plywood on two walls on 2nd floor art walls
|
BLD-Framing/Rough-in | 4/17/2017 | 4/18/2017 | 4/19/2017 | A | CANC |
Dave Hannah
|
|
|
Call Adam before you head out please. Phone #: ###-####
|
BLD-Conference | 4/12/2017 | 4/13/2017 | 4/13/2017 | A | NR |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/7/2017 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 3/7/2017 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 12/28/2016 | 12/28/2016 | 2/10/2017 | | PASS |
Carl Westfall
|
|
|
2nd done) (Jan 17 - 15 days) (Jan 24 - 20 days) (58 sheets) Boise Centre - Phase 3 - T.I.
|
Routing - PLAN CHECK | 2/8/2017 | | 2/10/2017 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/10/2017 | | DONE |
|
|
|
Al met 2/17/17 C_P /// Need GC Form and Revised Cert of Value
|
Routing - PLUMBING | 2/8/2017 | | 2/8/2017 | | PASS |
Bill VanDegrift
|
|
|
note 3 page P2.00- pipe condensate to lav tailpiece
|
Plan resubmittals received | | | 2/8/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/27/2017 | 1/30/2017 | 1/30/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 1/27/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 1/27/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/28/2016 | | 1/27/2017 | | FAIL |
Carl Westfall
|
|
|
Didn't meet the time frame because of 2 holidays and 2 days in training.
|
Routing - FIRE | 12/28/2016 | 12/28/2016 | 12/29/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Geothermal | 12/29/2016 | | 12/29/2016 | | PASS |
Jon R. Gunnerson
|
|
|
No connection to geothermal
|
Routing - Design Review | 12/28/2016 | | 12/29/2016 | | PASS |
Josh Wilson
|
|
|
|
Intake Approval | | | 12/28/2016 | | PASS |
Carl D Madsen
|
|
|
Verify fee task paid on 12/27/16
|
Routing - MECHANICAL | 12/28/2016 | | 12/28/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 12/28/2016 | | 12/28/2016 | | FAIL |
Bill VanDegrift
|
|
|
ISPC 804.1-- indirect waste receptors are not allowed in a pipe chase. Must be readily accessible. P210
|
Routing - Addressing | 12/28/2016 | | 12/28/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/28/2016 | | 12/28/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 12/28/2016 | | 12/28/2016 | | PASS |
Andy J. Long
|
|
|
Related to active project that is covered under ESC15-01613 (issued) and ESC16-01574 (under review)
|
Application received | | | 12/19/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 19 2016 1:30PM
|