BLD-Final | 3/14/2017 | 3/15/2017 | 3/15/2017 | A | PASS |
Dave Hannah
|
|
|
Gary Phone #: ###-####
|
DOC - Permit Finaled | 3/15/2017 | 3/15/2017 | 3/15/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | PASS |
Tony Young
|
|
|
Insulation // Gary Phone #: ###-####
|
BLD-Energy code compliance | 1/12/2017 | 1/17/2017 | 1/17/2017 | A | PASS |
Tony Young
|
|
|
gary Phone #: ###-####
|
BLD-Framing/Rough-in | 1/11/2017 | 1/12/2017 | 1/12/2017 | P | PASS |
Phil Shearer
|
|
|
Gary Phone #: ###-####
|
Routing Walk-In (BLD) | 12/19/2016 | 12/19/2016 | 12/19/2016 | P | FAIL |
Brian McGowan
|
|
|
Needs to verify existing trusses don't bear on wall to be removed or provide beam/structure to support the existing loads.
|
Routing Walk-In (Zoning) | 12/19/2016 | 12/19/2016 | 12/19/2016 | P | PASS |
David Moser
|
|
|
|
Routing Walk-In (BLD) | 12/19/2016 | 12/19/2016 | 12/19/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 12/19/2016 | | 12/19/2016 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/19/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/19/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/19/2016 | | DONE |
|
|
|
|
1st review completed | | | 12/19/2016 | | FAIL |
Brian McGowan
|
|
|
Needs to verify existing trusses don't bear on wall to be removed or provide beam/structure to support the existing loads.
|
Routing - PLAN CHECK | 12/19/2016 | | 12/19/2016 | | FAIL |
Brian McGowan
|
|
|
Needs to verify existing trusses don't bear on wall to be removed or provide beam/structure to support the existing loads.
|
Application received | | 12/19/2016 | | | |
|
|
|
|