BLD-Final | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | DONE |
Tony Young
|
|
|
John Phone #: ###-####,, ok per 480,, gave c of o
|
DOC - Permit Finaled | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 11/6/2017 | 11/6/2017 | 11/6/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 11/1/2017 | 11/1/2017 | 11/2/2017 | P | CANC |
Brandon Shaw
|
|
|
Phil Phone #: ###-####
|
BLD-Conference | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | CANC |
Brandon Shaw
|
|
|
Pre final walk thru, pending others, all good.
|
BLD-Energy code compliance | 7/12/2017 | 7/13/2017 | 7/13/2017 | A | PASS |
Tony Young
|
|
|
Insulation // Phil Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | PASS |
Brandon Shaw
|
|
|
John Phone #: ###-####
|
Plan Modification Accepted | | | 7/6/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 7/6/2017 | | 7/6/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 6/22/2017 | 6/22/2017 | 6/22/2017 | P | PART |
Tony Young
|
|
|
John Phone #: ###-####,, exterior ok after re-nailing painted areas
|
BLD-Foundation | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, work in progress,, ok
|
BLD-Foundation | 3/28/2017 | 3/28/2017 | 3/29/2017 | P | NR |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | PART |
Tony Young
|
|
|
Pouring at 2:30 -Bill Phone #: ###-####,, work in progress,, ok
|
PubWorks Subgrade Approval | 3/24/2017 | 3/24/2017 | 3/24/2017 | | DONE |
Jason C. Taylor
|
|
|
**entire house and garage**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | PASS |
Tony Young
|
|
|
Pour at 3 Wall // Bill Phone #: ###-####,, rear retaining wall ok to pour
|
BLD-Footing | 2/27/2017 | 2/28/2017 | 2/28/2017 | A | DONE |
Tony Young
|
|
|
Bill Phone #: ###-####,, rear footing for pool retaining wall
|
BLD-Footing | 2/27/2017 | 2/27/2017 | 2/27/2017 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, prior footing was removed due to elevation issues,, re excavated,, ok to pour rear pool retaining wall footings
|
PubWorks Subgrade Approval | 2/27/2017 | 2/27/2017 | 2/27/2017 | | DONE |
Jason C. Taylor
|
|
|
**RETAINING WALL ONLY***A letter from the applicant’s geotechnical engineer indicating that the pool retaining wall subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 2/14/2017 | 2/15/2017 | 2/15/2017 | A | PASS |
Jim Storey
|
|
|
Bill Phone #: ###-#### back wall ft ok
|
PubWorks Subgrade Approval | 2/15/2017 | 2/15/2017 | 2/15/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade (retaining wall footings only) is acceptable. If you have any questions call Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 2/3/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 2/1/2017 | | |
|
|
|
|
Routing - FIRE | 2/1/2017 | 2/1/2017 | 2/1/2017 | | PASS |
Katie Marron
|
|
|
Note adding stating additional space required for 30' defensible space to be maintained by property owner.
|
Plan assigned to (BJM) | 12/21/2016 | 12/21/2016 | 2/1/2017 | | DONE |
Brian McGowan
|
|
|
Due 1-6 Level 2 - Fail - 1/6 - WUI Compliance was not on plans. Top of Ftg and Fnd wall not on plans. Misc. details need clarified or provided.
|
Case Summary (BLD) | | | 2/1/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/1/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/1/2017 | | DONE |
|
|
|
MET
|
Routing - PLAN CHECK | 1/30/2017 | | 2/1/2017 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 2/1/2017 | | DONE |
|
|
|
|
Telephone call | | | 2/1/2017 | | DONE |
|
|
|
Left a message for John informing him that this permit is ready and the fee amount due
|
Plan resubmittals received | | | 1/30/2017 | | DONE |
|
|
|
received resubmittals for specifications
|
Plan resubmittals received | | | 1/30/2017 | | DONE |
|
|
|
received two copies of sheet A2.1 and engineering- gave to Brian
|
Routing - FIRE | 1/27/2017 | 1/27/2017 | 1/27/2017 | | FAIL |
Katie Marron
|
|
|
Defensible space not addressed.
|
Routing - PLAN CHECK | 1/27/2017 | | 1/27/2017 | | FAIL |
Brian McGowan
|
|
|
Tall wall engineering required, discrepancy on grading plan and foundation plan, WUI details needed.
|
Plan resubmittals received | | | 1/13/2017 | | DONE |
|
|
|
received two copies of sheets A1.1, A2.1, A4.1, A4.2, and A9.1 and 1 small grading plan- gave to Brian
|
1st review completed | | | 1/6/2017 | | FAIL |
Brian McGowan
|
|
|
WUI Compliance was not on plans. Top of Ftg and Fnd wall not on plans. Misc. details need clarified or provided.
|
Routing - PLAN CHECK | | | 1/6/2017 | | FAIL |
Brian McGowan
|
|
|
WUI Compliance was not on plans. Top of Ftg and Fnd wall not on plans. Misc. details need clarified or provided.
|
Routing - FIRE | 12/27/2016 | 12/20/2016 | 12/29/2016 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to applicant
|
Routing - Erosion and Sediment | 12/27/2016 | | 12/27/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative and site map. Valid RP and PD designated.
|
Routing - MECHANICAL | | | 12/27/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/23/2016 | | 12/23/2016 | | PASS |
Nicolette Womack
|
|
|
Eaves shall not encroach more than 2' into any setback.
|
Routing - PUBLIC WORKS | 12/23/2016 | | 12/23/2016 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 12/21/2016 | | 12/23/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 12/22/2016 | | DONE |
|
|
|
Resubmittals received 2 PW letters for Jason T-Brian is off so i took directly to Jason T-emailed Brian to let know
|
Routing PW Sewer Rating | 12/21/2016 | | 12/21/2016 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 12/20/2016 | | 12/21/2016 | | PASS |
Laura Hunter
|
|
|
|
Plan assigned to (LEG) Tisha | 12/20/2016 | | 12/21/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/20/2016 | | DONE |
|
|
|
|
Intake Approval | | | 12/20/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/20/2016 | | DONE |
|
|
|
|
Application received | | 12/20/2016 | | | |
|
|
|
|