BLD-Final | 4/19/2018 | 4/20/2018 | 4/20/2018 | P | PASS |
Tony Young
|
|
|
Ron; Phone #: ###-####
|
DOC - Permit Finaled | 4/20/2018 | 4/20/2018 | 4/20/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 4/18/2018 | 4/18/2018 | 4/19/2018 | P | PEND |
Tony Young
|
|
|
Ron; Phone #: ###-####
|
PubWorks Occupancy Approval | 4/19/2018 | 4/19/2018 | 4/19/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | PEND |
Tony Young
|
|
|
Ron; Phone #: ###-####
|
BLD-Final | 4/13/2018 | 4/17/2018 | 4/17/2018 | A | PEND |
Tony Young
|
|
|
Ron; Phone #: ###-####
|
BLD-Final | 4/12/2018 | 4/17/2018 | 4/17/2018 | A | PEND |
Tony Young
|
|
|
Ron; Phone #: ###-####
|
BLD-Final | 4/13/2018 | 4/13/2018 | 4/13/2018 | P | PEND |
Tony Young
|
|
|
Ron; Phone #: ###-####
|
BLD-Final | 4/12/2018 | 4/13/2018 | 4/13/2018 | A | PEND |
Tony Young
|
|
|
Ron; Phone #: ###-####,, needs hillside pass
|
BLD-Conference | 3/6/2018 | 3/7/2018 | 3/7/2018 | A | PART |
Tony Young
|
|
|
handrail conf // Ron Phone #: ###-####
|
BLD-Conference | 3/5/2018 | 3/6/2018 | 3/6/2018 | A | PART |
Tony Young
|
|
|
handrail conf // Ron Phone #: ###-####,, needs 1 1/2" clear
|
BLD-Foundation | 3/5/2018 | 3/6/2018 | 3/6/2018 | A | CANC |
Tony Young
|
|
|
rebar // Austin Phone #: ###-####
|
BLD-Energy code compliance | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Wall Bracing | 1/2/2018 | 1/3/2018 | 1/3/2018 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Framing/Rough-in | 12/29/2017 | 1/2/2018 | 1/2/2018 | A | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, firewall fix has been established ,, ok to continue and insulate
|
BLD-Conference | 12/29/2017 | 12/29/2017 | 12/29/2017 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####,, discuss firewall fix on west unit per architect
|
BLD-Conference | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | PEND |
Tony Young
|
|
|
Ron Phone #: ###-####,, firewall ?s,, needs to get architect on site
|
BLD-Framing/Rough-in | 12/12/2017 | 12/14/2017 | 12/14/2017 | A | NR |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Framing/Rough-in | 12/8/2017 | 12/12/2017 | 12/12/2017 | A | DEFR |
Jim Storey
|
|
|
Ron Phone #: ###-#### to tony for thur. am
|
BLD-Wall Bracing | 11/27/2017 | 11/28/2017 | 11/28/2017 | A | FAIL |
Brandon Shaw
|
|
|
Ron Phone #: ###-####.see correction notice and red paint.
OK to cover exterior only.
|
BLD-Other | 11/8/2017 | 11/9/2017 | 11/9/2017 | P | PART |
Tony Young
|
|
|
fire wall // Aaron Phone #: ###-####,, upper patio walls ok,, work in progress on trusses on ground
|
BLD-Other | 11/1/2017 | 11/1/2017 | 11/2/2017 | P | PART |
Brandon Shaw
|
|
|
Fire wall, work in progress
|
BLD-Other | 10/19/2017 | 10/20/2017 | 10/20/2017 | A | PART |
Tony Young
|
|
|
Aaron-fire wall Phone #: ###-####,, screw pattern on main level ok
|
BLD-Foundation | 8/18/2017 | 8/18/2017 | 8/18/2017 | P | PART |
Tony Young
|
|
|
Rebar // Austin Phone #: ###-####,, work in progress
|
BLD-Concrete | 8/10/2017 | 8/11/2017 | 8/11/2017 | A | PASS |
Brandon Shaw
|
|
|
rebar- Austin Phone #: ###-####
|
PubWorks Subgrade Approval | 5/10/2017 | 5/10/2017 | 5/10/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 2/10/2017 | 2/14/2017 | 2/14/2017 | A | NR |
Tony Young
|
|
|
Austin Phone #: ###-####,, need soils approval
|
Issue PAID IN FULL permit | | | 2/9/2017 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 2/9/2017 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 1/9/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 1/9/2017 | | DONE |
Christina Prado
|
|
|
Parcel Owner is GC - All requirements met
|
1st review completed | | | 1/6/2017 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2017 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 12/22/2016 | | 1/6/2017 | | DONE |
Tisha Gallop
|
|
|
1/10 L2 hillside townhouse
|
Routing - PLAN CHECK | 12/22/2016 | | 1/6/2017 | | PASS |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 12/22/2016 | | 1/6/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 12/22/2016 | | 12/29/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - Erosion and Sediment | 12/22/2016 | | 12/27/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan with site map and narrative approved.
|
Routing - MECHANICAL | 12/22/2016 | | 12/27/2016 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 12/22/2016 | | 12/23/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 12/22/2016 | 12/22/2016 | 12/22/2016 | | PASS |
Katie Marron
|
|
|
Plans were evaluated for FD Access, hydrant availability and defensible space.
|
Routing - Addressing | 12/22/2016 | | 12/22/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/22/2016 | | DONE |
|
|
|
|
Intake Approval | | | 12/22/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/22/2016 | | DONE |
|
|
|
|
Application received | | | 12/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 20 2016 7:54PM
|