Third Notice | | 5/16/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
Second Notice | | 4/20/2018 | 5/11/2018 | | DONE |
|
|
|
mailed 5-14
|
First Notice | | 4/1/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
Telephone call | | | 3/22/2018 | | DONE |
|
|
|
no reply on the email i sent for the temp c of o so printed the sign off card that was given for the temp c of o and emailed the perm c of o to tandrews & jconrad
|
Permanent Occupancy | | | 3/22/2018 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 3/20/2018 | 3/20/2018 | 3/20/2018 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Aging Inspection | 2/13/2018 | 2/13/2018 | 2/13/2018 | | PASS |
Mike Jordan
|
|
|
|
PubWorks Temp Occupancy Appr | 12/18/2017 | 12/18/2017 | 12/18/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Temporary Occupancy UNPAID FEE | | | 12/18/2017 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 12/13/2017 | 12/13/2017 | 12/13/2017 | P | PASS |
Mike Jordan
|
|
|
Cory Phone #: ###-####
|
Zoning Approval | 12/13/2017 | 12/13/2017 | 12/13/2017 | | PASS |
Katelyn Menuge
|
|
|
|
FIRE-Final Inspection | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Corey Phone #: ###-####
|
FIRE-Final Inspection | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Cory Phone #: ###-####
|
BLD-Framing/Rough-in | 8/24/2017 | 8/25/2017 | 8/25/2017 | A | PASS |
Mike Jordan
|
|
|
Cory Phone #: ###-####. Bldg.#1
|
BLD-Footing | 7/19/2017 | 7/20/2017 | 7/20/2017 | P | PART |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Bldg#1 footing work in progress. Will have special inspection.
|
Issue PAID IN FULL permit | | | 6/5/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/5/2017 | | DONE |
|
|
|
|
Expiration Notice | 5/30/2017 | 6/20/2017 | 5/30/2017 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 5/10/2017 | | |
|
|
|
|
Plan assigned to (JG) | 2/27/2017 | 2/27/2017 | 5/10/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 3/30 Victory Storage #1 (**ePlan**)
|
Routing PW Drainage | 5/10/2017 | | 5/10/2017 | | PASS |
Brian Murphy
|
|
|
signed off in ePlan by Drainage Brian Murphy
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/10/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/10/2017 | | DONE |
|
|
|
Need ACHD only as of 5/17/17 C_P /// Need revised COV (for each building), GC form, and ACHD
|
Routing - Design Review | 5/9/2017 | | 5/9/2017 | | PASS |
Sarah Schafer
|
|
|
|
Telephone call | | | 5/1/2017 | | DONE |
Scott Arellano
|
|
|
Spoke with architect Eric Anderson regarding security fencing and man gate between split building #8. Updated Fire Code plan review report and attached to case.
|
Routing - PLAN CHECK | 5/1/2017 | | 5/1/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 5/1/2017 | | 5/1/2017 | | PASS |
Javier Guzman
|
|
|
Signed off in ePlan by AHJ Engineers Chris Holladay
|
Routing - FIRE | 4/28/2017 | | 4/28/2017 | | PASS |
Katie Marron
|
|
|
Revised plan review report and attached to case.
|
Routing - MECHANICAL | 4/26/2017 | | 4/26/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Design | 4/25/2017 | | 4/25/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
OK: (on sheet 1) Add note to utility sheet regarding communication with Boise Public Works. Contractor shall contact Boise Public Works 48 hours prior to any sewer work in Beverly Street to obtain plug permits and schedule inspection.
|
Routing - MECHANICAL | 4/24/2017 | | 4/24/2017 | | FAIL |
Troy James
|
|
|
still need mechanical engineered stamped and signed plans.
|
Routing PW Street Lights | 4/20/2017 | | 4/20/2017 | | PASS |
Tom Marshall
|
|
|
|
Route to Impact Fee Review | 4/4/2017 | 4/7/2017 | 4/5/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 4/4/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 2/27/2017 | | 4/4/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Design Review | 2/27/2017 | | 3/27/2017 | | FAIL |
Sarah Schafer
|
|
|
Failed in ePlan by DR Sarah Schafer
|
Routing PW Solid Waste | 2/27/2017 | | 3/27/2017 | | PASS |
Peter J. McCullough
|
|
|
signed off in ePlan by PW Solid Waste Peter McCullough
|
Routing Off Site - STRUCTURAL | 2/27/2017 | | 3/27/2017 | | FAIL |
Javier Guzman
|
|
|
failed in ePlan by AHJ Engineers Chris Holladay
|
Routing PW Sewer Design | 2/27/2017 | | 3/6/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Label existing manhole SW15331. Abandon 8" stub to the east, fill pipe stub with grout and rechannel manhole base.
Label existing manhole SW15330. Abandon 8" stub to the east, fill pipe stub with grout and rechannel manhole base.
Contact Boise Public Works prior to any sewer work in Beverly Street to obtain tap/plug permits and schedule inspection. Look at using existing sewer service approximatley 252 feet to the south of existing manhole SW15330.
|
Routing - FIRE | 2/27/2017 | 2/27/2017 | 3/1/2017 | | FAIL |
Katie Marron
|
|
|
|
Routing PW Street Lights | 2/27/2017 | | 2/28/2017 | | FAIL |
Tom Marshall
|
|
|
|
Routing - PLANNING Land Div | 2/27/2017 | | 2/28/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLUMBING | 2/27/2017 | | 2/27/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 2/27/2017 | | PASS |
|
|
|
|
Routing - PLANNING | 2/27/2017 | | 2/27/2017 | | PASS |
Cody Riddle
|
|
|
Approved by DR.
|
Routing - Addressing | 2/27/2017 | | 2/27/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/27/2017 | | 2/27/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 2/27/2017 | | 2/27/2017 | | PASS |
Andy J. Long
|
|
|
Sweep streets two times per day, dumpsters, staging materials, concrete entrance on Beverly and alley, concrete washout, inlet protection
|
Telephone call | | | 2/14/2017 | | DONE |
|
|
|
as per Richard at ALC-the #8 bldg has a 480 sq ft office included
|
Intake Approval | | | 2/13/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
2-13-17 Please see mark ups on check list that are still outstanding.
|
Intake Approval | | | 1/30/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please complete and upload the 502 check list prior to a pre screen being completed.
All documents need to be completed- 304 form, 310 form, verification of legal lot ect. --signatures--
Need a completed application and certificate of value uploaded for each structure.
All drawings are required to be stamped by the design professional of record for the portion they are responsible for, FBC sheets.
|
Application received | | | 12/21/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 21 2016 9:17PM
|
Routing PW Drainage | 2/27/2017 | | 3/10/2016 | | FAIL |
Brian Murphy
|
|
|
NEEDS SWALE CROSS SECTION NEED 1 % GRADE
|