Permit NumberBLD16-04564
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 2902 S BEVERLY ST
Project NameVictory Storage Building #1
Customer NumberBLD16-04564, BLD17-00267-273
ePlanReviewYes
Description
(VICTORY STORAGE – BUILDING #1) (8 PERMITS TOTAL FILED UNDER BLD16-04564) Permit to construct a new 9,600 sq. ft. storage building (40 storage units) and related site improvements. Scope of work includes: construction of a slab on grade concrete, concrete foundation, construction of steel stud framed exterior walls with metal siding, metal roof purlins with a metal roof, metal storage unit partition panels, installation of new overhead doors, new electrical, site work, and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. The building is not fire sprinklered. Note: Special Inspections Required see form 310. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/16/20186/11/2018 DONE
mailed 6-12
Second Notice 4/20/20185/11/2018 DONE
mailed 5-14
First Notice 4/1/20184/10/2018 DONE
mailed 4-11-18
Telephone call  3/22/2018 DONE
no reply on the email i sent for the temp c of o so printed the sign off card that was given for the temp c of o and emailed the perm c of o to tandrews & jconrad
Permanent Occupancy  3/22/2018 DONE
PubWorks Occupancy Approval3/20/20183/20/20183/20/2018 DONE
DetailsTiffany Lowery
BLD-Aging Inspection2/13/20182/13/20182/13/2018 PASS
DetailsMike Jordan
PubWorks Temp Occupancy Appr12/18/201712/18/201712/18/2017 DONE
DetailsTiffany Lowery
Temporary Occupancy UNPAID FEE  12/18/2017 DONE
DetailsChristina Prado
BLD-Final12/13/201712/13/201712/13/2017PPASS
DetailsMike Jordan
Cory Phone #: ###-####
Zoning Approval12/13/201712/13/201712/13/2017 PASS
DetailsKatelyn Menuge
FIRE-Final Inspection12/11/201712/12/201712/12/2017APASS
DetailsTroy Cobbley
Life safety passed

Corey Phone #: ###-####
FIRE-Final Inspection11/30/201711/30/201711/30/2017PPASS
DetailsTroy Cobbley
Life safety passed

Cory Phone #: ###-####
BLD-Framing/Rough-in8/24/20178/25/20178/25/2017APASS
DetailsMike Jordan
Cory Phone #: ###-####. Bldg.#1
BLD-Footing7/19/20177/20/20177/20/2017PPART
DetailsMike Jordan
Cody Phone #: ###-####. Bldg#1 footing work in progress. Will have special inspection.
Issue PAID IN FULL permit  6/5/2017 DONE
Print Occupancy Form  6/5/2017 DONE
Expiration Notice5/30/20176/20/20175/30/2017 DONE
DetailsBrittany Hill
OVERRIDE  5/10/2017  
Plan assigned to (JG)2/27/20172/27/20175/10/2017 PASS
DetailsJavier Guzman
1st rev comp, 3/30 Victory Storage #1 (**ePlan**)
Routing PW Drainage5/10/2017 5/10/2017 PASS
DetailsBrian Murphy
signed off in ePlan by Drainage Brian Murphy
PLANS/APPL TAKEN TO FRONT DESK  5/10/2017 DONE
Permit Ready to Issue  5/10/2017 DONE
Need ACHD only as of 5/17/17 C_P /// Need revised COV (for each building), GC form, and ACHD
Routing - Design Review5/9/2017 5/9/2017 PASS
DetailsSarah Schafer
Telephone call  5/1/2017 DONE
DetailsScott Arellano
Spoke with architect Eric Anderson regarding security fencing and man gate between split building #8. Updated Fire Code plan review report and attached to case.
Routing - PLAN CHECK5/1/2017 5/1/2017 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL5/1/2017 5/1/2017 PASS
DetailsJavier Guzman
Signed off in ePlan by AHJ Engineers Chris Holladay
Routing - FIRE4/28/2017 4/28/2017 PASS
DetailsKatie Marron
Revised plan review report and attached to case.
Routing - MECHANICAL4/26/2017 4/26/2017 PASS
DetailsTroy James
Routing PW Sewer Design4/25/2017 4/25/2017 PASS
DetailsKyle S. Rosenmeyer
OK: (on sheet 1) Add note to utility sheet regarding communication with Boise Public Works. Contractor shall contact Boise Public Works 48 hours prior to any sewer work in Beverly Street to obtain plug permits and schedule inspection.
Routing - MECHANICAL4/24/2017 4/24/2017 FAIL
DetailsTroy James
still need mechanical engineered stamped and signed plans.
Routing PW Street Lights4/20/2017 4/20/2017 PASS
DetailsTom Marshall
Route to Impact Fee Review4/4/20174/7/20174/5/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
1st review completed  4/4/2017 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK2/27/2017 4/4/2017 FAIL
DetailsJavier Guzman
Routing - Design Review2/27/2017 3/27/2017 FAIL
DetailsSarah Schafer
Failed in ePlan by DR Sarah Schafer
Routing PW Solid Waste2/27/2017 3/27/2017 PASS
DetailsPeter J. McCullough
signed off in ePlan by PW Solid Waste Peter McCullough
Routing Off Site - STRUCTURAL2/27/2017 3/27/2017 FAIL
DetailsJavier Guzman
failed in ePlan by AHJ Engineers Chris Holladay
Routing PW Sewer Design2/27/2017 3/6/2017 FAIL
DetailsKyle S. Rosenmeyer
Label existing manhole SW15331. Abandon 8" stub to the east, fill pipe stub with grout and rechannel manhole base.

Label existing manhole SW15330. Abandon 8" stub to the east, fill pipe stub with grout and rechannel manhole base.

Contact Boise Public Works prior to any sewer work in Beverly Street to obtain tap/plug permits and schedule inspection. Look at using existing sewer service approximatley 252 feet to the south of existing manhole SW15330.
Routing - FIRE2/27/20172/27/20173/1/2017 FAIL
DetailsKatie Marron
Routing PW Street Lights2/27/2017 2/28/2017 FAIL
DetailsTom Marshall
Routing - PLANNING Land Div2/27/2017 2/28/2017 PASS
DetailsTodd Tucker
Routing - PLUMBING2/27/2017 2/27/2017 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Intake Approval  2/27/2017 PASS
Routing - PLANNING2/27/2017 2/27/2017 PASS
DetailsCody Riddle
Approved by DR.
Routing - Addressing2/27/2017 2/27/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/27/2017 2/27/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment2/27/2017 2/27/2017 PASS
DetailsAndy J. Long
Sweep streets two times per day, dumpsters, staging materials, concrete entrance on Beverly and alley, concrete washout, inlet protection
Telephone call  2/14/2017 DONE
as per Richard at ALC-the #8 bldg has a 480 sq ft office included
Intake Approval  2/13/2017 FAIL
DetailsAdele J Schaffeld-Griffin
2-13-17 Please see mark ups on check list that are still outstanding.
Intake Approval  1/30/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Please complete and upload the 502 check list prior to a pre screen being completed.
All documents need to be completed- 304 form, 310 form, verification of legal lot ect. --signatures--
Need a completed application and certificate of value uploaded for each structure.
All drawings are required to be stamped by the design professional of record for the portion they are responsible for, FBC sheets.
Application received  12/21/2016 DONE
Application submitted via PDS Online on Dec 21 2016 9:17PM
Routing PW Drainage2/27/2017 3/10/2016 FAIL
DetailsBrian Murphy
NEEDS SWALE CROSS SECTION NEED 1 % GRADE