BLD-Final | 7/20/2018 | 7/24/2018 | 7/24/2018 | P | PART |
Tony Young
|
|
|
call for access- Kerry Phone #: ###-####,, work in progress on fire caulking
|
DOC - Permit Finaled | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | PART |
Tony Young
|
|
|
call for access- Kerry Phone #: ###-####// need to finish the firewall
|
BLD-Blower Door Test Results | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Tony Young
|
|
|
call for access- Kerry Phone #: ###-####// 4.73
|
BLD-Final | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | FAIL |
Tony Young
|
|
|
call for access- Kerry Phone #: ###-####,, needs fire caulking to seal fire seperation penetrations in garage wall and ceiling
|
BLD-Final | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | NR |
Jim Sly
|
|
|
Keri Phone #: ###-#### Need Fireplace final.
|
BLD-Wall Bracing | 7/16/2018 | 7/17/2018 | 7/18/2018 | P | NR |
Tony Young
|
|
|
Keri Phone #: ###-####
|
BLD-Final | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | FAIL |
Tony Young
|
|
|
Kari (alt contact Mike - ###-####) **he said was in floodplain, but fema took out so not need elev. cert anymore, can talk to Jason Taylor if need to** Phone #: ###-####// needs fire seperation between garage and house,, blower door testing
|
PubWorks Occupancy Approval | 7/13/2018 | 7/13/2018 | 7/13/2018 | | DONE |
Jason C. Taylor
|
|
|
Recieved final elevation certificate. PW approved for occupancy. JCT
|
BLD-Other | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PASS |
Dave Hannah
|
|
|
Sofit // Terri Phone #: ###-####
|
BLD-Energy code compliance | 3/28/2018 | 3/28/2018 | 3/28/2018 | P | PASS |
Tony Young
|
|
|
Carrie Phone #: ###-####
|
BLD-Energy code compliance | 3/27/2018 | 3/28/2018 | 3/28/2018 | A | PEND |
Tony Young
|
|
|
Carrie Phone #: ###-####,, needs repairs finished
|
BLD-Framing/Rough-in | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | PART |
Tony Young
|
|
|
Carrie Phone #: ###-####,, see paint corrections,, ok to insulate
|
BLD-Framing/Rough-in | 3/22/2018 | 3/23/2018 | 3/23/2018 | A | NR |
Dave Hannah
|
|
|
Carrie Phone #: ###-#### needs mec rough in first
|
BLD-Energy code compliance | 3/22/2018 | 3/23/2018 | 3/23/2018 | A | PART |
Dave Hannah
|
|
|
Carrie Phone #: ###-#### air seal ok
|
BLD-Wall Bracing | 3/15/2018 | 3/15/2018 | 3/15/2018 | P | PART |
Dave Hannah
|
|
|
Kerry Phone #: ###-#### ok to cover ext but missing two hold downs int wall
|
Elevation Cert Rec'd-Midconst | | | 3/15/2018 | | DONE |
|
|
|
Recieved elevation certificate #2
|
BLD-Framing/Rough-in | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | FAIL |
Mike Jordan
|
|
|
Carrie Phone #: ###-####Elevation cert required prior to framing inspection. Correction notice posted..
|
Plan Modification Accepted | | | 3/6/2018 | | DONE |
|
|
|
resubmitted acca report 3-6-18pdf
|
Routing - MECHANICAL | 3/6/2018 | | 3/6/2018 | | PASS |
Troy James
|
|
|
resubmitted acca report 3-6-18pdf
|
BLD-Foundation | 1/3/2018 | 1/4/2018 | 1/4/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
Issue PAID IN FULL permit | | | 12/12/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/12/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 12/11/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 12/30/2016 | 12/30/2016 | 12/11/2017 | | DONE |
Brian McGowan
|
|
|
1st Review Complete9/20 Failed -Due 1-16 Level 2 - ePlan - Failed Planning and new design must be submitted.
|
Routing - PLAN CHECK | 12/11/2017 | | 12/11/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/11/2017 | | DONE |
|
|
|
need RP & GC
|
Meeting | | | 11/17/2017 | | DONE |
|
|
|
xfered permit from Harding Homes to MJH Investments, Michael Hendrichs (new parcel owner). See revised GC form and xfer letter from Harding Homes. Will need to verify parcel owner GC prior to issuance of permit and new RP.
|
Routing PW Flood Plain | 9/20/2017 | | 9/20/2017 | | PASS |
Jason C. Taylor
|
|
|
NOTE:
Two Elevation Certificates will be required; one prior to receiving a framing inspection, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to occupancy approval. Jason Taylor ###-####
|
Routing - PLAN CHECK | 9/20/2017 | | 9/20/2017 | | FAIL |
Brian McGowan
|
|
|
WUI details required
|
Routing PW Flood Plain | 8/1/2017 | | 8/1/2017 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in eplan. JCT
|
Routing - Design Review | 6/14/2017 | | 6/14/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Flood Plain | 5/30/2017 | | 5/30/2017 | | FAIL |
Jason C. Taylor
|
|
|
Plans do not match elevations provided on Elevation Certificate. Revise all elevations on plans to match the Elevation Certificate. Jason Taylor ###-####
|
Routing - Design Review | 5/25/2017 | | 5/25/2017 | | FAIL |
Andrea Tuning
|
|
|
The maximum square footage allowed is 1,753 square feet.
|
Routing - PLAN CHECK | 4/7/2017 | | 4/7/2017 | | FAIL |
Brian McGowan
|
|
|
Must meet Floodplain and DRH requirements.
|
Routing PW Flood Plain | 3/24/2017 | | 3/24/2017 | | FAIL |
Jason C. Taylor
|
|
|
Elevation Certificate needs revised:
1. EC has 750sqft of enclosed crawlspace shown there is no crawlspace show (slab on grade)
2. EC Top of Bottom Floor does not match building plans.
Revise and resubmit. Jason Taylor ###-####
|
Routing - Design Review | 3/22/2017 | | 3/22/2017 | | FAIL |
Andrea Tuning
|
|
|
|
Routing PW Flood Plain | 1/13/2017 | | 1/13/2017 | | FAIL |
Jim Wyllie
|
|
|
Plans do not comply with floodplain building requirements.
Jim Wyllie / ###-####
|
1st review completed | | | 1/12/2017 | | FAIL |
Brian McGowan
|
|
|
I cannot give a full review until you pass Planning and meet the DRH requirements. Here are several items that you will need to provide for Building Review when you resubmit.
1. A full building section is required to be included with plans.
2. Plans must have sections, details, notes and specification sheets (for fire rated vents and penetrations if needed) to show WUI Compliance. You are in WUI Foothills, Zone "A".
3. Make sure your construction methods match your Manual J. You have a concrete slab floor and are proposing an R30 between floor joist.
|
Routing - PLAN CHECK | 12/28/2016 | | 1/12/2017 | | FAIL |
Brian McGowan
|
|
|
Needs to pass Planning.
|
Routing PW Flood Plain | 12/28/2016 | | 1/3/2017 | | FAIL |
Jim Wyllie
|
|
|
Elevation Certificate is not correct. Finish grade elevations are not shown on the plans.
Jim Wyllie / ###-####
|
Plan assigned to (LEG) Tisha | 12/28/2016 | | 12/30/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - Design Review | 12/28/2016 | | 12/29/2016 | | FAIL |
Andrea Tuning
|
|
|
The materials and elevations do not match what was approved with DRH16-00230. The applicant will be required to match the approved drawings or complete a Design Review modification.
|
Routing - MECHANICAL | 12/28/2016 | | 12/29/2016 | | PASS |
Troy James
|
|
|
|
Application received | | | 12/28/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 28 2016 10:20AM
|
Plans ACCEPTED BY PLAN TECH | | | 12/28/2016 | | DONE |
|
|
|
|
Intake Approval | | | 12/28/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/28/2016 | | DONE |
|
|
|
|
Routing - Addressing | 12/28/2016 | | 12/28/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/28/2016 | | 12/28/2016 | | PASS |
Morgan Webb
|
|
|
|