BLD-Final | 7/20/2018 | 7/24/2018 | 7/24/2018 | P | PART |
Tony Young
|
|
|
call for access- Kerry Phone #: ###-####,, work in progress on fire caulking garage
|
DOC - Permit Finaled | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | PART |
Tony Young
|
|
|
call for access- Kerry Phone #: ###-####,, need to complete the firewall
|
BLD-Blower Door Test Results | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Tony Young
|
|
|
call for access- Kerry Phone #: ###-####// 4.3
|
BLD-Final | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | FAIL |
Tony Young
|
|
|
call for access- Kerry Phone #: ###-####,, needs fire caulking to seal fire seperation penetrations in garage wall and ceiling
|
BLD-Final | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | NR |
Jim Sly
|
|
|
Keri Phone #: ###-#### Need Fireplace Final.
|
BLD-Wall Bracing | 7/16/2018 | 7/17/2018 | 7/18/2018 | P | NR |
Tony Young
|
|
|
Keri Phone #: ###-####
|
BLD-Final | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | FAIL |
Tony Young
|
|
|
Kari (alt contact Mike - ###-####) **he said was in floodplain, but fema took out so not need elev. cert anymore, can talk to Jason Taylor if need to** Phone #: ###-####,, needs blower door testing,, fire seperation between garage and house
|
PubWorks Occupancy Approval | 7/13/2018 | 7/13/2018 | 7/13/2018 | | DONE |
Jason C. Taylor
|
|
|
Recieved final elevation certificate. PW approved for occupancy. JCT
|
BLD-Final | 7/3/2018 | 7/6/2018 | 7/6/2018 | A | NR |
Dave Hannah
|
|
|
Carrie Phone #: ###-#### needs flood plan cert
|
BLD-Other | 4/4/2018 | 4/5/2018 | 4/5/2018 | A | PART |
Tony Young
|
|
|
soffett-Carrie Phone #: ###-####,, work in progress,, ok
|
BLD-Energy code compliance | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Tony Young
|
|
|
Carrie Phone #: ###-####
|
BLD-Framing/Rough-in | 3/15/2018 | 3/15/2018 | 3/15/2018 | P | PASS |
Dave Hannah
|
|
|
Kerry Phone #: ###-####
|
BLD-Wall Bracing | 3/15/2018 | 3/15/2018 | 3/15/2018 | P | PASS |
Dave Hannah
|
|
|
Kerry Phone #: ###-####
|
Elevation Cert Rec'd-Midconst | | | 3/15/2018 | | DONE |
|
|
|
Recieved elevation certificate #2
|
BLD-Framing/Rough-in | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | FAIL |
Mike Jordan
|
|
|
Carrie Phone #: ###-####. Needs elevation cert. prior to framing inspection. correction notice posted.
|
Plan Modification Accepted | | | 3/6/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 3/6/2018 | | 3/6/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 1/3/2018 | 1/4/2018 | 1/4/2018 | A | PASS |
Brandon Shaw
|
|
|
cold weather provisions in place,, work in progress,, per plan,, ok to pour when ready
|
BLD-Footing | 12/29/2017 | 1/2/2018 | 1/2/2018 | A | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, cold weather provisions in place,, work in progress,, per plan,, ok to pour when ready
|
BLD-Footing | 12/29/2017 | 12/29/2017 | 12/31/2017 | P | NR |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 12/28/2017 | 12/29/2017 | 12/29/2017 | A | NR |
Tony Young
|
|
|
Pat Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/12/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/12/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 12/11/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 12/30/2016 | 12/30/2016 | 12/11/2017 | | DONE |
Brian McGowan
|
|
|
1st Review Complete - 9/20 Failed -Due 1-16 Level 2 - ePlan - Failed Planning and new design must be submitted.
|
Routing - PLAN CHECK | 12/11/2017 | | 12/11/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/11/2017 | | DONE |
|
|
|
need RP & GC
|
Meeting | | | 11/17/2017 | | DONE |
|
|
|
xfered permit from Harding Homes to MJH Investments, Michael Hendrichs (new parcel owner). See revised GC form and xfer letter from Harding Homes. Will need to verify parcel owner GC prior to issuance of permit and new RP.
|
Routing - PLAN CHECK | 9/20/2017 | | 9/20/2017 | | FAIL |
Brian McGowan
|
|
|
WUI details required
|
Routing PW Flood Plain | 9/20/2017 | | 9/20/2017 | | PASS |
Jason C. Taylor
|
|
|
NOTE:
Two Elevation Certificates will be required; one prior to receiving a framing inspection, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to occupancy approval. Jason Taylor ###-####
|
Routing PW Flood Plain | 8/1/2017 | | 8/1/2017 | | FAIL |
Jason C. Taylor
|
|
|
Need grading plans. JCT
|
Routing - Design Review | 6/14/2017 | | 6/14/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Flood Plain | 5/30/2017 | | 5/30/2017 | | FAIL |
Jason C. Taylor
|
|
|
Plans do not match elevations provided on Elevation Certificate. Revise all elevations on plans to match the Elevation Certificate. Jason Taylor ###-####
|
Routing - Design Review | 5/25/2017 | | 5/25/2017 | | FAIL |
Andrea Tuning
|
|
|
The maximum square footage allowed is 1,753 square feet.
|
Routing - PLAN CHECK | 4/7/2017 | | 4/7/2017 | | FAIL |
Brian McGowan
|
|
|
Must meet Floodplain and DRH requirements.
|
Routing - Design Review | 3/22/2017 | | 3/22/2017 | | FAIL |
Andrea Tuning
|
|
|
|
Routing PW Flood Plain | 1/13/2017 | | 1/13/2017 | | FAIL |
Jim Wyllie
|
|
|
Plans do not comply with floodplain building requirements.
Jim Wyllie / ###-####
|
1st review completed | | | 1/12/2017 | | FAIL |
Brian McGowan
|
|
|
I cannot give a full review until you pass Planning and meet the DRH requirements. Here are several items that you will need to provide for Building Review when you resubmit.
1. A full building section is required to be included with plans.
2. Plans must have sections, details, notes and specification sheets (for fire rated vents and penetrations if needed) to show WUI Compliance. You are in WUI Foothills, Zone "A".
3. Make sure your construction methods match your Manual J. You have a concrete slab floor and are proposing an R30 between floor joist.
|
Routing - PLAN CHECK | 12/28/2016 | | 1/12/2017 | | FAIL |
Brian McGowan
|
|
|
Failed Planning and new design must be submitted.
|
Routing PW Flood Plain | 12/28/2016 | | 1/3/2017 | | FAIL |
Jim Wyllie
|
|
|
Elevation Certificate not correct. Finish floor grades are not shown on the plans.
Jim Wyllie / ###-####
|
Plan assigned to (LEG) Tisha | 12/28/2016 | | 12/30/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - Design Review | 12/28/2016 | | 12/29/2016 | | FAIL |
Andrea Tuning
|
|
|
The materials and elevations do not match what was approved with DRH16-00230. The applicant will be required to match the approved drawings or complete a Design Review modification.
|
Routing - MECHANICAL | 12/28/2016 | | 12/29/2016 | | PASS |
Troy James
|
|
|
|
Application received | | | 12/28/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 28 2016 10:25AM
|
Plans ACCEPTED BY PLAN TECH | | | 12/28/2016 | | DONE |
|
|
|
|
Intake Approval | | | 12/28/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/28/2016 | | DONE |
|
|
|
|
Routing - Addressing | 12/28/2016 | | 12/28/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/28/2016 | | 12/28/2016 | | PASS |
Morgan Webb
|
|
|
|