Permit Information
Permit NumberBLD16-04596
StatusFinaled
Name MOGEL CONSTRUCTION LLC
Site Address 5814 E MILLET DR
Project Name5814 E MILLET DR
Customer Number 
ePlanReviewNo
Description
Hillside, WUI Valley, Zone "A", class "A" roof required. Permit for the construction of a new 3,868 sq. ft., three story (first story 1,344 sq. ft., second story 891 sq. ft., third story 1,439, Garage Level, 190 square feet Mud Room) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 108 sq. ft. of covered patio/porch, 409 square feet of storage and a 827 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
**BJM**
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/7/20183/7/20183/7/2018PPASS
DetailsBrandon Shaw
Please call Bryan at 208.286.8679. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel
DOC - Permit Finaled3/7/20183/7/20183/7/2018PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval3/2/20183/2/20183/2/2018 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance12/14/201712/15/201712/15/2017APASS
DetailsBrandon Shaw
OK to cover
BLD-Framing/Rough-in12/14/201712/15/201712/15/2017APASS
DetailsBrandon Shaw
Please reference engineering compliance letter.
BLD-Wall Bracing12/14/201712/15/201712/15/2017APASS
DetailsBrandon Shaw
Please reference engineering compliance letter.
BLD-Wall cover12/14/201712/15/201712/14/2017ACANC
DetailsBrandon Shaw
Thanks Bryan Phone #: ###-#### Inspection requested via web by Bryan Mogel
BLD-Conference11/22/201711/22/201711/22/2017ADEFR
DetailsBrandon Shaw
Per conference 11/21/17

Corrections to wall bracing to be as per revised engineering. Bryan is to have Engineer of record inspect braced walls and framing. Submit revisions as needed. Work In Progress
BLD-Wall Bracing11/17/201711/17/201711/17/2017PNR
DetailsJim Sly
C/N posted......besides what is on notice, Window that was in West Garage wall got moved to the North ......Compromising Braced wall line B. Engineer to advise. Missing a lot of blocking in that wall. Double Check approved plan for window and door locations.
BLD-Energy code compliance8/10/20178/11/20178/10/2017ACANC
DetailsTony Young
Please call Brent with Marv''s at ###-#### with any questions on Insulation. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel
BLD-Foundation8/2/20178/3/20178/4/2017PPART
DetailsBrandon Shaw
Jack Phone #: ###-####
BLD-Foundation7/27/20177/28/20177/28/2017PPART
DetailsBrandon Shaw
Stem walls, upper portion retaining walls
BLD-Foundation7/19/20177/20/20177/20/2017PPART
DetailsBrandon Shaw
Phase III, footings for retaining walls
BLD-Foundation6/23/20176/26/20176/26/2017PPART
DetailsBrandon Shaw
Phase I, house foundation.
BLD-Foundation6/7/20176/8/20176/8/2017APASS
DetailsBrandon Shaw
Jack Phone #: ###-####
PubWorks Subgrade Approval6/8/20176/8/20176/8/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Foundation6/6/20176/7/20176/7/2017PNR
DetailsBrandon Shaw
Jack Phone #: ###-####
Waiting for Geotech report.
Issue PAID IN FULL permit  4/12/2017 DONE
OVERRIDE  4/5/2017  
Telephone call  4/5/2017 DONE
Spoke Bryan informing him that this permit is ready and the fee amount for issuance
Inspection Record Card- Bld  4/5/2017 DONE
Permit Ready to Issue  4/5/2017 DONE
MET
Plan assigned to (BJM)12/30/201612/30/20164/4/2017 DONE
DetailsBrian McGowan
Due 1-17 Level 2 - FAIL - multitude of reasons
Case Summary (BLD)  4/4/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  4/4/2017 DONE
DetailsBrian McGowan
Routing - MECHANICAL3/3/2017 4/4/2017 PASS
DetailsTroy James
Routing - PLAN CHECK2/28/2017 3/30/2017 PASS
DetailsBrian McGowan
Plan resubmittals received  3/20/2017 DONE
Three copies of Structural Edge Engineering PPLC, Three copies of sheets 4, 7 and 16. Taken to Brian Mc
Routing PW Grading-Hillside3/3/2017 3/8/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PUBLIC WORKS3/8/2017 3/8/2017 PASS
DetailsMorgan Webb
Routing - PLANNING3/8/2017 3/8/2017 PASS
DetailsNicolette Womack
Plan resubmittals received  3/7/2017 DONE
resubmittals recieved 3 sheets of C1-took to Brian McGowan
Plan resubmittals received  2/28/2017 DONE
received (2) sets of resubmittals with revised plans and documents
Routing PW Grading-Hillside1/19/2017 1/19/2017 FAIL
DetailsJason C. Taylor
See email dated 1/19/2017 for review notes. JCT
Routing - PUBLIC WORKS1/19/2017 1/19/2017 FAIL
DetailsMorgan Webb
SEE JASON TAYLOR FOR FAIL.
Routing - PLAN CHECK  1/18/2017 FAIL
DetailsBrian McGowan
Email sent for mutiple corrections.
Routing - PLAN CHECK1/9/2017 1/17/2017 FAIL
DetailsBrian McGowan
1st review completed  1/17/2017 FAIL
DetailsBrian McGowan
Routing - FIRE1/6/2017 1/9/2017 PASS
DetailsScott Arellano
FD vehicle access and water supply are satisfactory. Plans are approved as shown.
Plan resubmittals received  1/6/2017 DONE
resubmittal received 3 sheets of C1-took to Brian McGowan, dropped off at JCT office 1-6.
Routing - Erosion and Sediment1/5/2017 1/6/2017 PASS
DetailsAndy J. Long
ESC site map and narrative approved. Valid PD and RP designated. Pre-construction site preparation inspection is required, call ###-#### to schedule
Routing - MECHANICAL  1/5/2017 FAIL
DetailsTroy James
Emailed corrections to Idaho Hvac Design
Routing - PLANNING1/3/2017 1/3/2017 PASS
DetailsNicolette Womack
CFH16-00057 approved
Routing - PUBLIC WORKS1/3/2017 1/3/2017 FAIL
DetailsMorgan Webb
See Jason Taylor for fail.
Routing PW Grading-Hillside12/29/2016 1/3/2017 FAIL
DetailsJason C. Taylor
Grading plans are incomplete. Need 3 new full size copies dropped off for review. JCT
Plan assigned to (LEG) Tisha12/29/2016 12/30/2016 DEFR
DetailsTisha Gallop
Routing PW Sewer Rating12/29/2016 12/29/2016 PASS
DetailsMorgan Webb
Routing - Addressing12/29/2016 12/29/2016 PASS
DetailsLaura Hunter
Plans ACCEPTED BY PLAN TECH  12/29/2016 DONE
Intake Approval  12/29/2016 PASS
Override - Parcel Holds  12/29/2016  
Recd Pcfee & Taken To Pln CK  12/29/2016 DONE
Application received 12/28/2016