Second Notice | | 2/23/2017 | 3/9/2017 | | DONE |
|
|
|
501 val
|
First Notice | | 2/9/2017 | 2/13/2017 | | DONE |
|
|
|
Mailed 2-14-17
|
Permanent Occupancy | | | 1/30/2017 | | DONE |
|
|
|
|
BLD-Final | 1/26/2017 | 1/27/2017 | 1/27/2017 | P | PASS |
Jim Storey
|
|
|
would like call ahead; chris Phone #: ###-####
|
FIRE-Final Inspection | 1/25/2017 | 1/26/2017 | 1/26/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 1/5/2017 | 1/9/2017 | 1/9/2017 | P | NR |
Jim Storey
|
|
|
Chris// please call 30min prior Phone #: ###-#### fire c/n
|
FIRE-Final Inspection | 1/5/2017 | 1/9/2017 | 1/9/2017 | A | FAIL |
Jim Page
|
|
|
Fire extinguishers in building need to be serviced, additional fire extinguishers are required on the second level mezzanine that has stair access as well as second level office area (Note number 4 of fire code review comments attached to city approved drawings). Building has thumb-turn deadbolts and round type door hardware throughout, doors that are going to be in the path of egress will need door hardware upgraded (Notes 5, 6 and 7 of fire code review comments attached to city approved drawings). Exit signs/egress lighting will need to be installed to include exit discharge (Notes 8, 9 & 10 of fire code review comments attached to city approved drawings), city approved drawings were notated for recommended exit placement.
|
Issue PAID IN FULL permit | | | 1/5/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 12/28/2016 | 12/28/2016 | 1/4/2017 | | PASS |
Javier Guzman
|
|
|
1/03 L1 TWO MEN AND A TRUCK paper, pend Fire
|
Routing - PLAN CHECK | 1/3/2017 | | 1/4/2017 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 1/4/2017 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 1/4/2017 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/4/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/4/2017 | | DONE |
|
|
|
**** ALL REQUIREMENTS MET as of 1-4-17 KRS***rev cert of val
|
Telephone call | | | 1/4/2017 | | DONE |
|
|
|
Spoke with Chris informing him this permit is ready and that Terry will need to fill out a 306 since the building owner is letting him act as the GC and he was not the one who filled/signed the application and then we can put the final fees in
|
Routing - FIRE | 1/3/2017 | 1/3/2017 | 1/3/2017 | | PASS |
Katie Marron
|
|
|
Comments attached to plans
|
1st review completed | | | 1/3/2017 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/29/2016 | | 1/3/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 12/28/2016 | | 12/29/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/28/2016 | | 12/29/2016 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/28/2016 | | DONE |
|
|
|
|
Intake Approval | | | 12/28/2016 | | PASS |
Javier Guzman
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/28/2016 | | DONE |
|
|
|
|
Application received | | 12/28/2016 | | | |
|
|
|
|