BLD-Final | 9/8/2017 | 9/11/2017 | 9/11/2017 | A | PASS |
Brandon Shaw
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | CANC |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Energy code compliance | 6/16/2017 | 6/19/2017 | 6/19/2017 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 6/16/2017 | 6/16/2017 | 6/16/2017 | P | PASS |
Jim Storey
|
|
|
David-would like as late as possible Phone #: ###-####
|
BLD-Wall Bracing | 5/30/2017 | 5/30/2017 | 5/30/2017 | P | PASS |
Mike Jordan
|
|
|
David Phone #: ###-####
|
BLD-Footing | 5/2/2017 | 5/3/2017 | 5/3/2017 | A | PASS |
Jim Storey
|
|
|
Terry-pour @ 10:00 Phone #: ###-####
|
BLD-Foundation | 4/24/2017 | 4/25/2017 | 4/25/2017 | A | PART |
Brandon Shaw
|
|
|
Terry-pour time 10:00 Phone #: ###-#### Basement walls only, no garage or pony wall footings.
|
BLD-Footing | 4/20/2017 | 4/21/2017 | 4/21/2017 | A | PASS |
Jim Storey
|
|
|
Terry Wilson (concrete at 10am//approved plans are on the doorstep of house next door) please call to tell results of inspection Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/12/2017 | | DONE |
|
|
|
|
Telephone call | | | 1/27/2017 | | DONE |
|
|
|
called David to let know permit is ready and how much is owed-left message on his cell
|
OVERRIDE | | | 1/26/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 1/5/2017 | 1/5/2017 | 1/26/2017 | | DONE |
Brian McGowan
|
|
|
Due 1-16 - Fail - Basement wall needs rebar specified, stair section incorrect, unfinished or finished Basement needs to be verified.
|
Routing - PLAN CHECK | 1/26/2017 | | 1/26/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 1/26/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 1/26/2017 | | DONE |
|
|
|
All Met
|
Inspection Record Card- Bld | | | 1/26/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/20/2017 | | DONE |
|
|
|
One copy of Calculations for basement wall, two copies of sheet 4 of 9 and four copies of sheet 2 of 9. Taken to Brian Mc
|
Routing - MECHANICAL | 1/19/2017 | | 1/19/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Plan Modification Accepted | | | 1/19/2017 | | DONE |
|
|
|
Revised manaul J
|
1st review completed | | | 1/12/2017 | | FAIL |
Brian McGowan
|
|
|
Basement wall needs rebar specified, stair section incorrect, unfinished or finished Basement needs to be verified.
|
Routing - PLAN CHECK | 1/6/2017 | | 1/12/2017 | | FAIL |
Brian McGowan
|
|
|
Basement wall needs rebar specified, stair section incorrect, unfinished or finished Basement needs to be verified.
|
Routing - MECHANICAL | | | 1/6/2017 | | FAIL |
Troy James
|
|
|
emailed corrections to air dynamics
|
Routing - PLANNING | 1/5/2017 | | 1/5/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 1/3/2017 | | 1/5/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | | | 1/5/2017 | | PASS |
|
|
|
|
Plan assigned to (LEG) Tisha | 1/3/2017 | | 1/5/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/3/2017 | | DONE |
|
|
|
|
Intake Approval | | | 1/3/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/3/2017 | | DONE |
|
|
|
|
Application received | | 1/3/2017 | | | |
|
|
|
|