Permit NumberBLD17-00007
StatusFinaled
Name ALPINE CONSTRUCTION INC
Site Address 213 N 9TH ST
Project NameMixed Greens
Customer Number 
ePlanReviewYes
Description
(MIXED GREENS – 1ST STORY – SOUTHEAST CORNER) The fire sprinkler system is used to meet high-rise provisions. To divide an existing 4,600 square foot tenant space into two tenant spaces (3,146 square feet and 1,425 square feet). A separate permit is required to establish a Certificate of Occupancy for the 1,425 square foot tenant space. To convert a 3,146 square foot tenant space to a retail sales use. Work is to include interior nonbearing walls, an interior ramp, interior doors, suspended ceiling grid system, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. This permit is intended to establish a Certificate of Occupancy for the 3,146 square foot tenant space. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/26/2018 DONE
Third Notice 6/17/20176/22/2017 DONE
This permit finaled on the web by Garrett Bailey
Third Notice 5/15/20176/12/2017 DONE
Mailed 6-13-17
Second Notice 4/21/20175/10/2017 DONE
sent in mail 5-11-17
First Notice 3/16/20174/11/2017 DONE
Mailed 4-12-17
BLD-Final3/3/20173/6/20173/6/2017APASS
DetailsDave Hannah
Mike Phone #: ###-####
Permanent Occupancy  3/6/2017 DONE
BLD-Final2/24/20172/27/20172/27/2017APART
DetailsDave Hannah
Garrett Phone #: ###-#### ok for temp occ needs to set up shop
FIRE-Final Inspection2/23/20172/23/20172/23/2017PPASS
DetailsJim Page
Final fire sprinkler inspection is complete, final fire alarm inspection is complete, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection passed/complete.
BLD-Ceiling Grid Inspection2/17/20172/17/20172/17/2017PPASS
DetailsJim Sly
Garrett Phone #: ###-####
BLD-Framing/Rough-in2/2/20172/3/20172/3/2017PPASS
DetailsMike Jordan
Garrett// please call 20 min ahead Phone #: ###-####
Route to Impact Fee Review1/28/20171/31/20171/30/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
Permit Ready to Issue  1/30/2017 DONE
DetailsChristina Prado
Need GC form & revised certificate of vlaue for issuance
Print Occupancy Form  1/30/2017 DONE
Issue PAID IN FULL permit  1/30/2017 DONE
Plan assigned to (CJW)1/4/20171/4/20171/28/2017 PASS
DetailsCarl Westfall
(Jan 24 - 15 days) (3 sheets) Mixed Greens
Routing - PLAN CHECK1/4/2017 1/28/2017 PASS
DetailsCarl Westfall
1st review completed  1/28/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/28/2017 DONE
Routing - FIRE1/4/20171/4/20171/5/2017 PASS
DetailsKatie Marron
Comments attached to case.
Routing - Addressing1/4/2017 1/5/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/4/2017 1/4/2017 PASS
DetailsMorgan Webb
Plan Reviewer's activity  1/4/2017 PASS
Plan intake review approved
Intake Approval  1/4/2017 PASS
DetailsCarl Westfall
Application received  1/3/2017 DONE
Application submitted via PDS Online on Jan 3 2017 2:00PM