Permanent Occupancy | | | 1/24/2017 | | DONE |
|
|
|
|
BLD-Final | 1/20/2017 | 1/23/2017 | 1/23/2017 | P | PASS |
Jim Storey
|
|
|
Lynne// please call ahead office is closed from 1-3pm Phone #: ###-####/###-####
|
FIRE-Final Inspection | 1/20/2017 | 1/23/2017 | 1/23/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Remove the thumbturn lock (keyed OK) at the main exit and provide the "M" suite number before the building inspection.
|
Issue PAID IN FULL permit | | | 1/20/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/18/2017 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Telephone call | | | 1/18/2017 | | DONE |
Christina Prado
|
|
|
Called Lynne to advise permit is ready for pick up, gave info about sign permit issuance as well.
|
Print Occupancy Form | | | 1/18/2017 | | DONE |
|
|
|
|
Plan assigned to (DAF) | 1/17/2017 | 1/17/2017 | 1/17/2017 | | DONE |
David Ferguson
|
|
|
|
Plan assigned to (CDM) | 1/10/2017 | 1/10/2017 | 1/17/2017 | | PASS |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 1/10/2017 | | 1/17/2017 | | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 1/17/2017 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 1/17/2017 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2017 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/10/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/10/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/10/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | 1/10/2017 | | | |
|
|
|
|