BLD-Aging Inspection | 9/21/2017 | 9/21/2017 | 9/28/2017 | | CANC |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 5/5/2017 | 5/9/2017 | 5/9/2017 | A | PASS |
Jim Sly
|
|
|
Marc Phone #: ###-####
|
BLD-Framing/Rough-in | 5/2/2017 | 5/3/2017 | 5/3/2017 | A | PASS |
Jim Storey
|
|
|
Mark Phone #: ###-####
|
BLD-Foundation | 3/2/2017 | 3/2/2017 | 3/2/2017 | P | PASS |
Jim Sly
|
|
|
Marc Phone #: ###-####
|
BLD-Foundation | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PASS |
Jim Sly
|
|
|
Mark Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/30/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 1/17/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 1/13/2017 | 1/13/2017 | 1/17/2017 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 1/17/2017 | | 1/17/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 1/17/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 1/17/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 1/17/2017 | | DONE |
|
|
|
Need GC Form, Revised Cert of Value and RP
|
Telephone call | | | 1/17/2017 | | DONE |
|
|
|
Spoke with Ken informing him that we need the 302 and 306 filled out by the GC and that we would need to know who the RP is going to be. Gave him the total and informed him that it will only be that fee if the value stays at 60,000
|
Routing Walk-In (Zoning) | 1/13/2017 | 1/13/2017 | 1/13/2017 | P | PASS |
Jeff Lowe
|
|
|
|
1st review completed | | | 1/13/2017 | | FAIL |
Brian McGowan
|
|
|
Waitng for Engineering Lateral Design/approval
|
Application received | | 1/13/2017 | | | |
|
|
|
|