Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD17-00055
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 6080 E BARBER DR
Project NameHN 95-1
Customer Number 
ePlanReviewYes
Description
*** Plan Modification 3-3-17 - Revised window sizes as per plans. Shear/Lateral updated as well. **BJM** Hillside, Zone "A" requirements, class "A" roof required. Permit for the construction of a new 3681 sq. ft., two story (first story 1978 sq. ft., second story 1703 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 272 sq. ft. of covered patio/porch and a 952 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-01 zoning and setbacks per planning. Prescriptive Energy Code is proposed. **BJM**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/3/20177/3/20177/5/2017PPASS
DetailsBrandon Shaw
Rollo Phone #: ###-####
DOC - Permit Finaled7/5/20177/5/20177/5/2017PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval7/5/20177/5/20177/5/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Other5/8/20175/8/20175/8/2017PPASS
DetailsBrandon Shaw
Rollo-soffit inspections Phone #: ###-####
BLD-Energy code compliance4/28/20175/1/20175/1/2017APASS
DetailsBrandon Shaw
Rollo Phone #: ###-####
BLD-Framing/Rough-in4/27/20174/27/20174/27/2017PPASS
DetailsBrandon Shaw
Rollo Phone #: ###-####
BLD-Framing/Rough-in4/25/20174/25/20174/25/2017PFAIL
DetailsBrandon Shaw
Rolo Phone #: ###-####
BLD-Wall Bracing4/13/20174/13/20174/13/2017PPASS
DetailsBrandon Shaw
Rollo Phone #: ###-####
BLD-Ceiling Grid Inspection4/11/20174/12/20174/12/2017AFAIL
DetailsBrandon Shaw
Rollo Phone #: ###-####
Sheer Bracing- needs all tie downs and bracing to be in place, nailing and blocking, see red marks
BLD-Foundation3/9/20173/9/20173/10/2017PPASS
DetailsDave Hannah
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
(F) Reprint permit  3/9/2017 DONE
Telephone call  3/9/2017 DONE
emailed Nik again-asking him to print and sign the building permit after the plan mod and asked if he could send it back to me
BLD-Footing3/8/20173/8/20173/8/2017APASS
DetailsDave Hannah
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
PubWorks Subgrade Approval3/8/20173/8/20173/8/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing3/7/20173/7/20173/7/2017PNR
DetailsJim Storey
Rollo Phone #: ###-####
CHANGE STATUS TO (ISS)  3/7/2017 DONE
fees paid online
(F) Reprint permit  3/7/2017 DONE
Telephone call  3/7/2017 DONE
emailed Nik the revised permit to sign and send back
OVERRIDE  3/3/2017  
Plan assigned to (BJM)3/3/20173/3/20173/3/2017 DONE
DetailsBrian McGowan
Routing - PLAN CHECK3/3/2017 3/3/2017 PASS
DetailsBrian McGowan
1st review completed  3/3/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/3/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  3/3/2017 DONE
do not re issue
Plan Modification Accepted  3/3/2017 DONE
plans modifications submitted
Issue PAID IN FULL permit  2/23/2017 DONE
Inspection Record Card- Bld  2/23/2017 DONE
OVERRIDE  2/21/2017  
Plan assigned to (BJM)1/31/20171/31/20172/21/2017 DONE
DetailsBrian McGowan
Due 2-15 Level 2 Fail - 2-8-17 - Engineering verified and fire penetration approval for Carlon Box
Routing PW Grading-Hillside2/21/2017 2/21/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PLAN CHECK2/21/2017 2/21/2017 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  2/21/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  2/21/2017 DONE
DetailsChristina Prado
All requirement met
1st review completed  2/8/2017 FAIL
DetailsBrian McGowan
Need headers sized, beam and bearing points verified, waiting for approval of Carlon fire rated box (has been sent to Ron)
Routing - PLAN CHECK1/27/2017 2/8/2017 FAIL
DetailsBrian McGowan
Routing - FIRE1/27/20171/27/20171/31/2017 PASS
DetailsKatie Marron
Applicant provided hydrant layout. Plans were reviewed for FD Access and hydrant availability. No comments
Routing PW Grading-Hillside1/27/2017 1/31/2017 FAIL
DetailsJason C. Taylor
See changemarks in ePlan. JCT
Plan assigned to (LEG) Tisha1/27/2017 1/31/2017 DEFR
DetailsTisha Gallop
Route to Impact Fee Review1/27/20171/30/20171/30/2017 PASS
DetailsTonya Wallace
Initial residential review of all new news permit requested for now.
Routing - PLANNING1/27/2017 1/30/2017 PASS
DetailsJeff Lowe
Routing - Addressing1/27/2017 1/27/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/27/2017 1/27/2017 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment1/27/2017 1/27/2017 PASS
DetailsMelissa Jannusch
ESC, plan and narrative provided in SWPPP. ESC controls include use of a stabilized construction entrance, concrete washout, staging area, inlet protection for DIs on Barber Dr, and a silt fence on the south side of the lot.
Routing - MECHANICAL1/27/2017 1/27/2017 PASS
DetailsTroy James
Plans ACCEPTED BY PLAN TECH  1/27/2017 DONE
DetailsChristina Prado
Intake Approval  1/27/2017 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  1/27/2017 DONE
DetailsChristina Prado
Intake Approval  1/26/2017 FAIL
received the SWPPP but still need the specification detail for the wall covering in the WUI
Intake Approval  1/24/2017 FAIL
DetailsChristina Prado
Need to show exterior Wui wall covering & SWPPP document
Application received  1/16/2017 DONE
Application submitted via PDS Online on Jan 16 2017 11:49AM