BLD-Aging Inspection | 1/26/2018 | 1/26/2018 | 1/26/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/25/2018 | 1/25/2018 | 1/26/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 9/13/2017 | 9/13/2017 | 9/13/2017 | P | PASS |
Tony Young
|
|
|
Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | PASS |
Tony Young
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 5/26/2017 | 5/26/2017 | 5/26/2017 | P | PASS |
Tony Young
|
|
|
ryan Phone #: ###-####,, 2 interior pad footings ok
|
CHANGE STATUS TO (ISS) | | | 5/22/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/22/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/19/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 5/16/2017 | 5/16/2017 | 5/19/2017 | | DONE |
Brian McGowan
|
|
|
Plan mod from Walk in
|
Routing Walk-In (BLD) | 5/16/2017 | 5/16/2017 | 5/19/2017 | P | DONE |
Brian McGowan
|
|
|
Took plans in to go thru Hillside and Erosion.
|
Telephone call | | | 5/19/2017 | | DONE |
|
|
|
calcalled and left vm for Ryan plan mod is ready and fee due
|
Routing - Erosion and Sediment | 5/16/2017 | | 5/19/2017 | | PASS |
Andy J. Long
|
|
|
ESC General Permit conditions apply. No ESC plan required
|
Permit Ready to Issue | | | 5/19/2017 | | DONE |
|
|
|
All met **plan mod, DO NOT REISSUE**
|
Routing - PLAN CHECK | 5/18/2017 | | 5/18/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/18/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/18/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 5/16/2017 | | 5/17/2017 | | PASS |
Jason C. Taylor
|
|
|
No inspection required by PW. JCT
|
BLD-Framing/Rough-in | 1/20/2017 | 1/20/2017 | 1/20/2017 | P | PASS |
Tony Young
|
|
|
Ryan Phone #: ###-####
|
Routing Walk-In (BLD) | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 1/17/2017 | | 1/17/2017 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 1/17/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/17/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/17/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/17/2017 | | DONE |
|
|
|
|
Application received | | 1/17/2017 | | | |
|
|
|
|