BLD-Final | 5/4/2017 | 5/4/2017 | 5/4/2017 | P | PASS |
Dave Hannah
|
|
|
Inspection requested via web by Robert ODell
|
DOC - Permit Finaled | 5/4/2017 | 5/4/2017 | 5/4/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 3/14/2017 | 3/15/2017 | 3/15/2017 | A | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/13/2017 | 3/13/2017 | 3/13/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Other | 2/27/2017 | 2/27/2017 | 2/27/2017 | P | PASS |
Jim Sly
|
|
|
Siding // Jim Phone #: ###-#### Wall Bracing.....OK
|
CHANGE STATUS TO (ISS) | | | 2/27/2017 | | DONE |
|
|
|
Plan mod no fees per Brian
|
BLD-Footing | 2/7/2017 | 2/7/2017 | 2/9/2017 | P | PASS |
Jim Sly
|
|
|
Ben Phone #: ###-#### Mono pour footing and Found......OK
|
Routing Walk-In (BLD) | 2/8/2017 | 2/8/2017 | 2/8/2017 | A | DONE |
Brian McGowan
|
|
|
Plan mod
|
1st review completed | | | 2/8/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/8/2017 | | 2/8/2017 | | PASS |
Brian McGowan
|
|
|
2-8-17 Plan Modification
|
Case Summary (BLD) | | | 2/8/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2017 | | DONE |
Brian McGowan
|
|
|
|
OVERRIDE | | | 1/23/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 1/23/2017 | 1/23/2017 | 1/23/2017 | P | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 1/23/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 1/23/2017 | | 1/23/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 1/23/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 1/23/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/23/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 1/23/2017 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 1/23/2017 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (Zoning) | 1/17/2017 | 1/17/2017 | 1/17/2017 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 1/17/2017 | 1/17/2017 | 1/17/2017 | A | FAIL |
Tisha Gallop
|
|
|
need two copies full sized plans, existing floor plan and foundation cross section.
|
1st review completed | | | 1/17/2017 | | FAIL |
|
|
|
|
Application received | | 1/17/2017 | | | |
|
|
|
|