Permit Information
Permit NumberBLD17-00078
StatusIssued
Name BLOCK 22 L L C
Site Address 245 S CAPITOL BLVD
Project NameGrove Hotel Security Barriers
Customer Number 
ePlanReviewNo
Description
(GROVE HOTEL – SECURITY BARRIERS IN TWO STAIRWAY ENCLOSURES AT THE 5TH STORY) The fire sprinkler system is used for high-rise and for occupancy. To install a security barrier, including a side-hinged swinging egress door, at the 5th story in the Southwest full height building stairway and to install a security barrier, including a side-hinged swinging egress door, at the 5th story in the Southeast full height building stairway. When the stairway is entered on the 5th story or below, these barriers are intended to control access within the stairways to the stories above the 5th story by preventing unauthorized access from the non-egress side of the barriers. These barrier doors are required to always be openable from the egress side. Both barrier doors are required to be capable of being unlocked simultaneously from the fire command center. Since the barrier doors are not fire doors, they are also allowed to unlatch upon that signal. Both barrier doors are required to have code compliant landings on both sides. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference4/25/20174/26/20174/27/2017PPASS
DetailsDave Hannah
Please call ahead for access - Steve Phone #: ###-####
Issue PAID IN FULL permit  4/25/2017 DONE
DetailsChristina Prado
Plan assigned to (CJW)1/19/20171/19/20172/6/2017 PASS
DetailsCarl Westfall
* (1st done) (Jan 27 - 7 days) (Feb 1 - 10 days) Grove hotel
Routing - PLAN CHECK2/3/2017 2/6/2017 PASS
DetailsCarl Westfall
13 Callendar days to review
PLANS/APPL TAKEN TO FRONT DESK  2/6/2017 DONE
Permit Ready to Issue  2/6/2017 DONE
DetailsChristina Prado
All met 4/19/17 C_P /// Need GC Form & Revised Certificate of Value for issuance
Inspection Record Card- Bld  2/6/2017 DONE
DetailsChristina Prado
Telephone call  2/6/2017 DONE
called Steve- left message that permit is ready and need GC and certificate of value
Route to Impact Fee Review2/3/20172/6/20172/3/2017 PASS
DetailsCindy M. Gould
Review requested for Commercial Permit
Routing - FIRE2/2/2017 2/3/2017 PASS
DetailsScott Arellano
Comments attached to plans.
1st review completed  2/3/2017 PASS
Routing - PLAN CHECK1/19/2017 2/2/2017 PASS
DetailsCarl Westfall
Gone 2 days for training durring the plan review time.
Plans ACCEPTED BY PLAN TECH  1/19/2017 DONE
Intake Approval  1/19/2017 PASS
as per Carl Westfall
Recd Pcfee & Taken To Pln CK  1/19/2017 DONE
as per Candy Nichols - okay for customer to pay plan review fee and permit fee at intake
Application received 1/18/2017