BLD-Final | 7/17/2017 | 7/17/2017 | 7/17/2017 | P | PASS |
Mike Jordan
|
|
|
Colby Phone #: ###-####
|
DOC - Permit Finaled | 7/17/2017 | 7/17/2017 | 7/17/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 6/6/2017 | 6/6/2017 | 6/7/2017 | P | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-####
|
BLD-Framing/Rough-in | 6/2/2017 | 6/5/2017 | 6/5/2017 | P | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-####
|
BLD-Wall Bracing | 5/24/2017 | 5/25/2017 | 5/25/2017 | A | PART |
Jim Sly
|
|
|
servantes Phone #: ###-#### All Exterior shear nailing.....only OK
|
BLD-Foundation | 5/4/2017 | 5/5/2017 | 5/5/2017 | P | PASS |
Tony Young
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 5/3/2017 | 5/4/2017 | 5/4/2017 | P | PART |
Mike Jordan
|
|
|
dane Phone #: ###-####. Column pad footings to be 10 inches thick. ok to place after additional soils removed from above area.
|
OVERRIDE | | | 4/28/2017 | | |
|
|
|
|
Plan assigned to (JG) | 4/28/2017 | 4/28/2017 | 4/28/2017 | | PASS |
Javier Guzman
|
|
|
Plan Mod to change location of home on lot, no change in footprint
|
Plan assigned to (DAF) | 3/31/2017 | 3/31/2017 | 4/28/2017 | | DEFR |
David Ferguson
|
|
|
Plan Mod to change location of home on lot, no change in footprint
|
Routing - PLAN CHECK | 3/31/2017 | | 4/28/2017 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 4/28/2017 | | DONE |
|
|
|
plan mod ONLY - DO NOT RE-ISSUE
|
Inspection Record Card- Bld | | | 4/28/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 3/31/2017 | | 4/3/2017 | | PASS |
Jeff Lowe
|
|
|
|
Plan Modification Accepted | | | 3/31/2017 | | DONE |
Christina Prado
|
|
|
Plan mod to show new house location - it moved back a bit on the lot,no change to foot print
|
BLD-Footing | 3/27/2017 | 3/28/2017 | 3/28/2017 | P | PEND |
Jim Sly
|
|
|
Dane Phone #: ###-#### Did not pour footing after I inspected it. They want to move foundation......plan is back in for modification and approval.
|
BLD-Footing | 3/24/2017 | 3/27/2017 | 3/27/2017 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/13/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/13/2017 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 2/1/2017 | | |
|
|
|
|
Plan assigned to (DAF) | 1/25/2017 | 1/25/2017 | 2/1/2017 | | DONE |
David Ferguson
|
|
|
due 2/2
|
1st review completed | | | 2/1/2017 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/1/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/1/2017 | | DONE |
|
|
|
MET
|
Routing - PLAN CHECK | 1/20/2017 | | 2/1/2017 | | PASS |
David Ferguson
|
|
|
|
Plan assigned to (LEG) Tisha | 1/20/2017 | | 1/25/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Route to Impact Fee Review | 1/20/2017 | 1/23/2017 | 1/23/2017 | | PASS |
Cindy M. Gould
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - MECHANICAL | 1/20/2017 | | 1/23/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/20/2017 | | 1/23/2017 | | PASS |
Jeff Lowe
|
|
|
Garage shall be a minimum of 20-feet from near edge of common drievway. Verify on site.
|
Routing - Addressing | 1/20/2017 | | 1/23/2017 | | FAIL |
Laura Hunter
|
|
|
The site plan and lot and block do not match the address given for permit
|
Routing - Addressing | 1/23/2017 | | 1/23/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 1/20/2017 | | 1/20/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/20/2017 | | DONE |
|
|
|
|
Intake Approval | | | 1/20/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/20/2017 | | DONE |
|
|
|
|
Application received | | | 1/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 19 2017 3:47PM
|