Permit Information
Permit NumberBLD17-00090
StatusIssued
Name ST LUKES HEALTH SYSTEM LTD
Site Address 305 E JEFFERSON ST
Project NameSt. Luke's Children's Pavilion
Customer Number 
ePlanReviewYes
Description
(ST. LUKE'S CHILDRENS PAVILION)(STRUCTURAL STEEL AND CONCRETE ONLY) This is the Steel & Concrete Package of the Children's Pavilion. This package will include any structural, electrical, plumbing work dealing with the construction of any structural steel and concrete. All building code items for TI will be reviewed under future submittals. Special Inspections Required pre form #310. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/14/201712/14/201712/19/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection12/13/201712/13/201712/19/2017 PEND
DetailsDave Hannah
BLD-Concrete9/14/20179/15/20179/15/2017PPEND
DetailsDave Hannah
Rebar inspection request for the suspended slab on deck. Placement is from grid 7.5 to 11 and from grid A to E. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski ok after spec inspection sign off
BLD-Foundation8/15/20178/15/20178/18/2017PPEND
DetailsDave Hannah
Final reinforcement sign off for the perimeter walls at LL3. These are along grids 1-11 and A-E. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Concrete8/1/20178/1/20178/1/2017ADONE
DetailsDave Hannah
Rebar inspection of structural mat slab. Grids 5 to 11 from A to E. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Foundation7/28/20177/28/20178/1/2017PPASS
DetailsDave Hannah
Rebar inspection of structural mat slab. Grids 5 to 11 from A to E. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Foundation7/18/20177/18/20177/18/2017APART
DetailsBrandon Shaw
5.5 to 11, between A & E
BLD-Foundation6/26/20176/29/20177/12/2017ADONE
DetailsDave Hannah
Inspection of LL3 foundation reinforcement complete - 1,900cy concrete placement scheduled for 0100hr start on 7/1 Phone #: ###-#### Inspection requested via web by Jamal Nelson
BLD-Foundation7/11/20177/11/20177/12/2017PPEND
DetailsDave Hannah
Rebar // Dan Phone #: ###-####
BLD-Foundation6/21/20176/22/20176/23/2017PPEND
DetailsDave Hannah
Bottom mat reinforcement - mat slab @ level LL3 Phone #: ###-#### Inspection requested via web by Jamal Nelson
BLD-Foundation6/14/20176/15/20176/16/2017PPASS
DetailsDave Hannah
Elevator pit reinforcement Phone #: ###-#### Inspection requested via web by Jamal Nelson
BLD-Footing6/1/20176/2/20176/5/2017PPASS
DetailsDave Hannah
Concrete reinforcement at tower crane foundation Phone #: ###-#### Inspection requested via web by Jamal Nelson
BLD-Conference5/23/20175/30/20175/30/2017APASS
DetailsDave Hannah
Meeting requested with Dave Hannah to discuss start of construction activities specific to this permit. Phone #: ###-#### Inspection requested via web by Jamal Nelson
Issue PAID IN FULL permit  5/5/2017 DONE
DetailsChristina Prado
Inspection Record Card- Bld  5/5/2017 DONE
DetailsChristina Prado
OVERRIDE  3/30/2017  
Permit Ready to Issue  3/30/2017 DONE
DetailsChristina Prado
***we still need everything listed but i put the fee amounts in because St Lukes needed to get a check cut-i emailed the fees due sheet for them***Need - ACHD (are they paying here, or ACHD? Fee calcualtion in docs) , GC Form & Revised Certificate of Value for issuance
Plan assigned to (AJS)2/9/20172/9/20173/29/2017 PASS
DetailsAdele J Schaffeld-Griffin
Childrens Pavilion
Routing - PLAN CHECK3/22/2017 3/29/2017 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLANNING Land Div3/22/2017 3/29/2017 PASS
DetailsTodd Tucker
Routing Off Site - STRUCTURAL3/22/2017 3/29/2017 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  3/29/2017 DONE
Routing Off Site - STRUCTURAL3/10/2017 3/22/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK3/10/2017 3/22/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLANNING Land Div3/10/2017 3/20/2017 FAIL
DetailsTodd Tucker
Cannot issue building permit until ROS17-00017 is finaled.
Routing - Design Review3/10/2017 3/16/2017 PASS
DetailsSarah Schafer
Approved per DRH.
Routing PW Sewer Design3/10/2017 3/15/2017 PASS
DetailsKyle S. Rosenmeyer
Routing - FIRE3/10/20173/10/20173/10/2017 PASS
DetailsKatie Marron
Revised report attached to case.
Route to Impact Fee Review3/3/20173/6/20173/6/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
1st review completed  3/3/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Routing Off Site - STRUCTURAL2/9/2017 3/3/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK2/9/2017 3/3/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLANNING2/9/2017 3/2/2017 PASS
DetailsDavid Moser
David Moser
Routing PW Sewer Rating2/9/2017 3/2/2017 PASS
DetailsMorgan Webb
Routing PW Drainage2/9/2017 2/27/2017 PASS
DetailsBrian Murphy
Routing PW Environmental2/9/2017 2/21/2017 PASS
DetailsRick Christenson
Routing - FIRE2/9/20172/9/20172/14/2017 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing - Erosion and Sediment2/9/2017 2/13/2017 PASS
DetailsMelissa Jannusch
ESC narrative is located under GRD16-00079. RP TBD. De-watering will occur. BMPs include. Stabilized construction entrance, waste management, concrete washout, street sweeping as needed, fiber rolls at bottom of perimeter fence, staging area, inlet protection.
Routing - PLUMBING2/9/2017 2/13/2017 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING Land Div2/9/2017 2/10/2017 FAIL
DetailsTodd Tucker
The proposed building crosses over an existing property line. Prior to issuance of the building permit, the parcels must be combined into one parcel through the Record of Survey Parcel Consolidation process.
Routing PW Solid Waste2/9/2017 2/10/2017 PASS
DetailsEvan Carpenter
Solid waste is OK as planned.
Routing PW Sewer Design2/9/2017 2/10/2017 FAIL
DetailsKyle S. Rosenmeyer
New sewer services required to be "Type D" connections. Contant Boise Public Works 48 Hours prior to sewer work in Public R/W to obtain tap permits and schedule inspection. Excavate and abandon/cap 6 sewer services in the alley that previously served the Children's Pavilion property.
Routing PW Street Lights2/9/2017 2/9/2017 PASS
DetailsTom Marshall
Routing - Addressing2/9/2017 2/9/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/9/2017 2/9/2017 PASS
DetailsRachael Beierle
will review rating by m_b
Intake Approval  2/9/2017 PASS
DetailsDavid Ferguson
plan review fees paid 2/9/2017
Intake Approval  1/24/2017 FAIL
DetailsDavid Ferguson
Please upload a completed, #310 Statement of Special Inspections form.
CHANGE STATUS TO (REV)  1/24/2017 DONE
changed status to REV-plan review has not been done yet-
Intake Approval  1/23/2017 FAIL
DetailsDavid Ferguson
Please upload a completed, with stamp and signature, #310 Statement of Special Inspections form. Also, a Zoning Certificate from our Planning Department.
Permit Ready to Issue  1/20/2017 DONE
Application received  1/19/2017 DONE
Application submitted via PDS Online on Jan 19 2017 4:19PM
Routing - Design Review2/9/2017 2/14/2016 FAIL
DetailsSarah Schafer
See David Mosers comments.