BLD-Final | 4/12/2018 | 4/16/2018 | 4/16/2018 | A | PASS |
Jim Storey
|
|
|
please call when on way to make sure he meets you // Zack Phone #: ###-####
|
DOC - Permit Finaled | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | NR |
Jim Storey
|
|
|
Zach Phone #: ###-#### seal furnce flue/ cover wood at house/garage fire wall with gyp at sole plate/ seal garage door wire penatations in ceilling// pending stair by owner will check all at completion.
|
Case Summary (BLD) | | | 9/19/2017 | | DONE |
|
|
|
|
BLD-Final | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | FAIL |
Brandon Shaw
|
|
|
Complete all correction then call back
|
BLD-Final | 8/2/2017 | 8/3/2017 | 8/3/2017 | A | FAIL |
Jim Storey
|
|
|
call for acess-Brock Phone #: ###-#### garage septration/ landings or steps deck and door exterior
|
BLD-Energy code compliance | 4/25/2017 | 4/26/2017 | 4/26/2017 | A | PASS |
Brandon Shaw
|
|
|
Zach Phone #: ###-####
|
BLD-Framing/Rough-in | 4/24/2017 | 4/25/2017 | 4/25/2017 | P | PASS |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
BLD-Wall Bracing | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | DONE |
Dave Hannah
|
|
|
Zach Phone #: ###-#### yes they need a 20min fire window between house and garage
|
BLD-Footing | 3/6/2017 | 3/6/2017 | 3/6/2017 | P | PASS |
Jim Storey
|
|
|
Zach Phone #: ###-####
|
BLD-Footing | 2/27/2017 | 2/28/2017 | 3/1/2017 | P | PASS |
Jim Storey
|
|
|
Zack Phone #: ###-####
|
BLD-Footing | 1/31/2017 | 2/1/2017 | 2/1/2017 | A | PASS |
Jim Storey
|
|
|
Zach Phone #: ###-####
|
OVERRIDE | | | 1/31/2017 | | |
|
|
|
|
OVERRIDE | | | 1/31/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/31/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/31/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/31/2017 | | DONE |
|
|
|
Need RP
|
Plan assigned to (BJM) | 1/23/2017 | 1/23/2017 | 1/30/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 1/23/2017 | | 1/30/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 1/30/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2017 | | DONE |
Brian McGowan
|
|
|
Energy - Yes ESC - Yes
|
Routing - MECHANICAL | 1/23/2017 | | 1/24/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/23/2017 | | 1/23/2017 | | PASS |
Colleen T Carroll
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/23/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/23/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/23/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 1/20/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 20 2017 2:05PM
|