Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-00102
StatusIssued
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 8000 S FEDERAL WAY
Project NameMicron TCUP Bldg
Customer NumberC24074
ePlanReviewYes
Description
**Project Management-Ron Hill**(MICRON)(TCUP BLDG) For the construction of a new 4,900 sq. ft. central utilities building to serve R&D Fab Bldg. 51 with work to include general site work, footings, foundation and consruction of the steel building including mechanical, electrical and plumbing per the approved plan and the attached engineering. This building is fully fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection5/27/20205/27/20205/27/2020 PASS
DetailsJim Storey
BLD-Final1/14/20201/14/20201/14/2020PPASS
DetailsJim Storey
dillion
BLD-Final1/9/20201/10/20201/10/2020PFAIL
DetailsJim Storey
dillon Phone #: ###-#### pw and achd no sig on card.
Print Occupancy Form  1/10/2020 DONE
FIRE-Final Inspection12/19/201912/20/201912/20/2019PPASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete (fire alarm is with B51 fire alarm submittal, B51 fire aalrm permit will remain in issued status until fire alarm inspection for B51 is complete), fire extinguishers are placed with current inspection tags. Final life fire safety inspection for TCUP complete..

tea cup // Dillon Phone #: ###-####
Print Occupancy Form  10/17/2019 DONE
FIRE-Final Inspection10/14/201910/14/201910/14/2019PFAIL
DetailsJim Page
Povide permit for fire alarm install as discussed.

Final for Fire/Life Safety - TCUP Phone #: ###-#### Inspection requested via web by Dillon Barresi
BLD-Conference4/3/20194/3/20194/3/2019APEND
DetailsJim Storey
Expires: 08/01/18
BLD-Aging Inspection2/2/20182/2/20182/2/2018 PASS
DetailsJim Storey
wip
BLD-Conference8/25/20178/25/20178/25/2017APASS
DetailsJim Storey
walk thru prep for final/ landings doors/equment tie down boliers
Fees Due Hold6/17/2017 8/4/2017 DONE
DetailsTisha Gallop
Fees Due Hold6/15/2017 6/16/2017 DONE
DetailsChristina Prado
OVERRIDE  6/14/2017  
Plan assigned to (CDM)4/3/20174/3/20176/14/2017 PASS
DetailsCarl D Madsen
1st comp. Micron T-Cup
Routing - Addressing4/12/2017 6/14/2017 PASS
DetailsLaura Hunter
CHANGE STATUS TO (ISS)  6/14/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/14/2017 DONE
Permit Ready to Issue  6/14/2017 DONE
DO NOT RE ISSUE
Routing - PLAN CHECK6/13/2017 6/14/2017 PASS
DetailsCarl D Madsen
Routing - FIRE6/13/20176/13/20176/13/2017 PASS
DetailsKatie Marron
Revised report attached to case. Additionally new cover sheet indicates building to be fully fire sprinklered.
OVERRIDE  6/9/2017  
Routing - PLAN CHECK4/12/2017 4/23/2017 FAIL
DetailsCarl D Madsen
Routing - FIRE4/12/20174/12/20174/18/2017 FAIL
DetailsScott Arellano
Emailed architect fire plan review report. Need fire hydrant locations to be shown on site plan.
Routing - MECHANICAL4/12/2017 4/17/2017 PASS
DetailsTroy James
Routing PW Environmental4/12/2017 4/14/2017 PASS
DetailsRick Christenson
Routing PW Drainage4/12/2017 4/12/2017 PASS
DetailsBrian Murphy
PART OF APPROVE MASTERPLAN
Routing - PUBLIC WORKS4/12/2017 4/12/2017 PASS
DetailsRachael Beierle
Routing - PLUMBING4/12/2017 4/12/2017 PASS
DetailsBill VanDegrift
partial water plan for the t-cup building, no waste design at this time.
Plan Modification Accepted  4/3/2017 DONE
DetailsChristina Prado
Plan Mod to add MEP's This is not plan modification but rather a submittal of additional information as the original permit was for the foundation and structure. CDM
CHANGE STATUS TO (REV)  4/3/2017 DONE
To reflect plan mod in place
OVERRIDE  3/20/2017  
Routing - FIRE3/17/20173/17/20173/20/2017 PASS
DetailsKatie Marron
Structural only. Reviewed for FD Access.
Plan assigned to (CDM)2/9/20172/9/20173/20/2017 PASS
DetailsCarl D Madsen
1st comp. Micron TCUP
Routing Off Site - STRUCTURAL3/17/2017 3/20/2017 PASS
DetailsAdele J Schaffeld-Griffin
signed off in e plan
PLANS/APPL TAKEN TO FRONT DESK  3/20/2017 DONE
Permit Ready to Issue  3/20/2017 DONE
need ACHD, RP, GC & rev cert of val
Routing - PLAN CHECK3/17/2017 3/20/2017 PASS
DetailsAdele J Schaffeld-Griffin
structural shell only
Permit Ready to Issue  3/20/2017 DONE
DetailsChristina Prado
Issue & PRINT to be Invoiced  3/20/2017 DONE
DetailsChristina Prado
Routing - FIRE3/6/20173/6/20173/13/2017 FAIL
DetailsKatie Marron
no architectural drawings to review
Routing Off Site - STRUCTURAL3/6/2017 3/13/2017 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK3/6/2017 3/13/2017 FAIL
DetailsCarl D Madsen
Route to Impact Fee Review3/2/20173/5/20173/6/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
Routing - FIRE2/9/20172/9/20173/2/2017 FAIL
DetailsKatie Marron
Not enough information provided to review.
Routing Off Site - STRUCTURAL2/9/2017 3/2/2017 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK2/9/2017 3/2/2017 FAIL
DetailsCarl D Madsen
1st review completed  3/2/2017 FAIL
Routing PW Environmental2/9/2017 2/21/2017 PASS
DetailsRick Christenson
Routing - Erosion and Sediment2/9/2017 2/15/2017 PASS
DetailsAndy J. Long
Routing - PLANNING Land Div2/9/2017 2/10/2017 PASS
DetailsTodd Tucker
Routing - Addressing2/9/2017 2/9/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/9/2017 2/9/2017 PASS
DetailsRachael Beierle
Routing PW Drainage2/9/2017 2/9/2017 PASS
DetailsBrian Murphy
Routing - PLANNING2/9/2017 2/9/2017 PASS
DetailsCody Riddle
Intake Approval  2/9/2017 PASS
Application received  1/20/2017 DONE
Application submitted via PDS Online on Jan 20 2017 5:07PM