BLD-Aging Inspection | 5/27/2020 | 5/27/2020 | 5/27/2020 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/14/2020 | 1/14/2020 | 1/14/2020 | P | PASS |
Jim Storey
|
|
|
dillion
|
BLD-Final | 1/9/2020 | 1/10/2020 | 1/10/2020 | P | FAIL |
Jim Storey
|
|
|
dillon Phone #: ###-#### pw and achd no sig on card.
|
Print Occupancy Form | | | 1/10/2020 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/19/2019 | 12/20/2019 | 12/20/2019 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete (fire alarm is with B51 fire alarm submittal, B51 fire aalrm permit will remain in issued status until fire alarm inspection for B51 is complete), fire extinguishers are placed with current inspection tags. Final life fire safety inspection for TCUP complete..
tea cup // Dillon Phone #: ###-####
|
Print Occupancy Form | | | 10/17/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | FAIL |
Jim Page
|
|
|
Povide permit for fire alarm install as discussed.
Final for Fire/Life Safety - TCUP Phone #: ###-#### Inspection requested via web by Dillon Barresi
|
BLD-Conference | 4/3/2019 | 4/3/2019 | 4/3/2019 | A | PEND |
Jim Storey
|
|
|
Expires: 08/01/18
|
BLD-Aging Inspection | 2/2/2018 | 2/2/2018 | 2/2/2018 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Conference | 8/25/2017 | 8/25/2017 | 8/25/2017 | A | PASS |
Jim Storey
|
|
|
walk thru prep for final/ landings doors/equment tie down boliers
|
Fees Due Hold | 6/17/2017 | | 8/4/2017 | | DONE |
Tisha Gallop
|
|
|
|
Fees Due Hold | 6/15/2017 | | 6/16/2017 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 6/14/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 4/3/2017 | 4/3/2017 | 6/14/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp. Micron T-Cup
|
Routing - Addressing | 4/12/2017 | | 6/14/2017 | | PASS |
Laura Hunter
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/14/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/14/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/14/2017 | | DONE |
|
|
|
DO NOT RE ISSUE
|
Routing - PLAN CHECK | 6/13/2017 | | 6/14/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | 6/13/2017 | 6/13/2017 | 6/13/2017 | | PASS |
Katie Marron
|
|
|
Revised report attached to case. Additionally new cover sheet indicates building to be fully fire sprinklered.
|
OVERRIDE | | | 6/9/2017 | | |
|
|
|
|
Routing - PLAN CHECK | 4/12/2017 | | 4/23/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 4/12/2017 | 4/12/2017 | 4/18/2017 | | FAIL |
Scott Arellano
|
|
|
Emailed architect fire plan review report. Need fire hydrant locations to be shown on site plan.
|
Routing - MECHANICAL | 4/12/2017 | | 4/17/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Environmental | 4/12/2017 | | 4/14/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Drainage | 4/12/2017 | | 4/12/2017 | | PASS |
Brian Murphy
|
|
|
PART OF APPROVE MASTERPLAN
|
Routing - PUBLIC WORKS | 4/12/2017 | | 4/12/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLUMBING | 4/12/2017 | | 4/12/2017 | | PASS |
Bill VanDegrift
|
|
|
partial water plan for the t-cup building, no waste design at this time.
|
Plan Modification Accepted | | | 4/3/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod to add MEP's This is not plan modification but rather a submittal of additional information as the original permit was for the foundation and structure. CDM
|
CHANGE STATUS TO (REV) | | | 4/3/2017 | | DONE |
|
|
|
To reflect plan mod in place
|
OVERRIDE | | | 3/20/2017 | | |
|
|
|
|
Routing - FIRE | 3/17/2017 | 3/17/2017 | 3/20/2017 | | PASS |
Katie Marron
|
|
|
Structural only. Reviewed for FD Access.
|
Plan assigned to (CDM) | 2/9/2017 | 2/9/2017 | 3/20/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp. Micron TCUP
|
Routing Off Site - STRUCTURAL | 3/17/2017 | | 3/20/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
signed off in e plan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/20/2017 | | DONE |
|
|
|
need ACHD, RP, GC & rev cert of val
|
Routing - PLAN CHECK | 3/17/2017 | | 3/20/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
structural shell only
|
Permit Ready to Issue | | | 3/20/2017 | | DONE |
Christina Prado
|
|
|
|
Issue & PRINT to be Invoiced | | | 3/20/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - FIRE | 3/6/2017 | 3/6/2017 | 3/13/2017 | | FAIL |
Katie Marron
|
|
|
no architectural drawings to review
|
Routing Off Site - STRUCTURAL | 3/6/2017 | | 3/13/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 3/6/2017 | | 3/13/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Route to Impact Fee Review | 3/2/2017 | 3/5/2017 | 3/6/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 2/9/2017 | 2/9/2017 | 3/2/2017 | | FAIL |
Katie Marron
|
|
|
Not enough information provided to review.
|
Routing Off Site - STRUCTURAL | 2/9/2017 | | 3/2/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/9/2017 | | 3/2/2017 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 3/2/2017 | | FAIL |
|
|
|
|
Routing PW Environmental | 2/9/2017 | | 2/21/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - Erosion and Sediment | 2/9/2017 | | 2/15/2017 | | PASS |
Andy J. Long
|
|
|
|
Routing - PLANNING Land Div | 2/9/2017 | | 2/10/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 2/9/2017 | | 2/9/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/9/2017 | | 2/9/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 2/9/2017 | | 2/9/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 2/9/2017 | | 2/9/2017 | | PASS |
Cody Riddle
|
|
|
|
Intake Approval | | | 2/9/2017 | | PASS |
|
|
|
|
Application received | | | 1/20/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 20 2017 5:07PM
|