BLD-Final | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | PASS |
Jim Storey
|
|
|
Sandy-please call Sandy so she can give you the access code Phone #: ###-####
|
DOC - Permit Finaled | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 7/25/2017 | 7/25/2017 | 7/25/2017 | P | FAIL |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote no access or phone #
|
BLD-Final | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | FAIL |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote c/n posted
|
BLD-Energy code compliance | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | PASS |
Brandon Shaw
|
|
|
Inspection requested via web by Marc Foote
|
Plan Modification Accepted | | | 5/3/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 5/3/2017 | | 5/3/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Framing/Rough-in | 5/1/2017 | 5/1/2017 | 5/1/2017 | P | PASS |
Brandon Shaw
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Wall Bracing | 4/20/2017 | 4/20/2017 | 4/20/2017 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Wall Bracing | 4/19/2017 | 4/26/2017 | 4/20/2017 | A | CANC |
Jim Storey
|
|
|
>> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
|
BLD-Wall Bracing | 4/17/2017 | 4/20/2017 | 4/19/2017 | A | CANC |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
|
BLD-Footing | 3/10/2017 | 3/13/2017 | 3/13/2017 | A | PASS |
Jim Sly
|
|
|
Jared Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/1/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 2/9/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 1/25/2017 | 1/25/2017 | 2/9/2017 | | DONE |
Brian McGowan
|
|
|
Due 2-6 ePlan Fail- WUI Compliance needed 2-6-17
|
Routing - PLAN CHECK | 2/9/2017 | | 2/9/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/9/2017 | | DONE |
|
|
|
NEEDS: Responsible Person
|
1st review completed | | | 2/6/2017 | | FAIL |
Brian McGowan
|
|
|
WUI details for Zone "A" requirements needed. Verify load points.
|
Routing - PLAN CHECK | 1/24/2017 | | 2/6/2017 | | FAIL |
Brian McGowan
|
|
|
WUI details for Zone "A" requirements needed. Verify load points.
|
Route to Impact Fee Review | 1/24/2017 | 1/27/2017 | 1/25/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - MECHANICAL | 1/24/2017 | | 1/25/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/24/2017 | | 1/25/2017 | | PASS |
Jeff Lowe
|
|
|
driveway to be max of 33-feet wide
|
Routing - Addressing | 1/24/2017 | | 1/25/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 1/24/2017 | | 1/25/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plan assigned to (LEG) Tisha | 1/24/2017 | | 1/25/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/24/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/24/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/24/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 1/23/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2017 12:00PM
|
Intake Approval | | | 1/23/2017 | | FAIL |
|
|
|
Missing second floor plan, manual J and needs to name plans correctly; had them as 1.0, 2.0 etc.....
|