Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD17-00138
StatusFinaled
Name CORE BUILDING COMPANY
Site Address 2702 N 26TH ST
Project NameNew Home
Customer NumberMAKE SURE ALL ADDRESSES MATCH
ePlanReviewYes
Description
Permit for the construction of a new 1818 sq. ft., one story single family dwelling with 2 bedrooms, 2 bathrooms, approximately 155 sq. ft. of covered patio/porch and a 768 sq. ft. detached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/10/20185/11/20185/11/2018APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jaysen Porter
DOC - Permit Finaled5/11/20185/11/20185/11/2018PPASS
DetailsTony Young
BLD-Final5/7/20185/8/20185/8/2018ANR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jaysen Porter,, needs to verify address.. (out of sync,, should be 2706?),, needs tempered glass, etc.
BLD-Blower Door Test Results5/7/20185/8/20185/8/2018APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jaysen Porter,, 6.0
BLD-Final5/4/20185/7/20185/7/2018PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jaysen Porterl,, walk through only
BLD-Energy code compliance2/14/20182/15/20182/15/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Jaysen Porter
BLD-Energy code compliance2/12/20182/14/20182/14/2018PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jaysen Porter
BLD-Framing/Rough-in2/8/20182/9/20182/9/2018APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Jaysen Porter
BLD-Wall Bracing1/17/20181/18/20181/18/2018APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jaysen Porter,, exterior nailing ok
BLD-Footing10/30/201710/31/201710/31/2017ADEFR
DetailsMike Jordan
Ryan Phone #: ###-####. Concrete footings already placed when arrived on site. no city approved plans or lot lines strung. Footings appear to be 8x16. Concrete proceeds at own risk and accpts all responsibility for foundation system.
BLD-Footing10/30/201710/30/201710/30/2017PCANC
DetailsTony Young
Ryan Phone #: ###-####,, forms,, work in progress
Issue PAID IN FULL permit  10/10/2017 DONE
Inspection Record Card- Bld  10/10/2017 DONE
OVERRIDE  9/20/2017  
Plan assigned to (BJM)9/1/20179/1/20179/20/2017 DONE
DetailsBrian McGowan
9/07 Plan Mod for Brian ePlan
Routing - PLAN CHECK9/20/2017 9/20/2017 PASS
DetailsBrian McGowan
Please add (1) hour of plan review time for the modification.
Permit Ready to Issue  9/20/2017 DONE
DetailsChristina Prado
All requirements met
Routing - MECHANICAL9/8/2017 9/11/2017 PASS
DetailsChad Schwendiman
CHANGE STATUS TO (REV)  9/1/2017 DONE
DetailsChristina Prado
Plan Modification Accepted  9/1/2017 DONE
DetailsChristina Prado
Changing foundation to slab and hvac to ductless
Extend Review Timeline  8/8/2017 DONE
1st approved 180 day extension per Adele. See documents
Telephone call  7/17/2017 DONE
Left a message for Travis informing him that this permit is going to expire in 9 days and if he would like he may send in a request for a 180 day extension. Left the permit number, my email and my number
Expiration Notice7/5/20177/26/20177/5/2017 DONE
DetailsBrittany Hill
Plan assigned to (BJM)2/21/20172/21/20173/27/2017 DONE
DetailsBrian McGowan
Due 2-27 ePlan - Fail- need engineering for angled support column
Routing - PLANNING2/14/2017 3/27/2017 PASS
DetailsTed Vanegas
PLANS/APPL TAKEN TO FRONT DESK  3/27/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  3/27/2017 DONE
All Met
Routing - PLAN CHECK3/26/2017 3/26/2017 PASS
DetailsBrian McGowan
Routing - PLAN CHECK2/14/2017 2/28/2017 FAIL
DetailsBrian McGowan
Engineering for angled column is required, verify floor cover (conc?)
1st review completed  2/27/2017 FAIL
DetailsBrian McGowan
Engineering for angled column is required, verify floor cover (conc?)
Plan assigned to (LEG) Tisha2/14/2017 2/21/2017 DEFR
DetailsTisha Gallop
Plan Modification Accepted  2/17/2017 DONE
Revised manual J
Routing - MECHANICAL2/17/2017 2/17/2017 PASS
DetailsChad Schwendiman
Routing Walk-In (Zoning)2/16/20172/16/20172/16/2017APASS
DetailsTed Vanegas
Routing Walk-In (BLD)2/16/20172/16/20172/16/2017APASS
DetailsBrian McGowan
no contact
Route to Impact Fee Review2/14/20172/17/20172/15/2017 PASS
DetailsCindy M. Gould
Initial residential review of all new news permit requested for now.
Routing - MECHANICAL2/14/2017 2/15/2017 FAIL
DetailsTroy James
Emailed corrections to building energy
Routing - Addressing2/14/2017 2/15/2017 PASS
DetailsLaura Hunter
New SFD address is 2702 N 26th St
Routing - PUBLIC WORKS2/14/2017 2/15/2017 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  2/14/2017 DONE
Intake Approval  2/14/2017 PASS
Recd Pcfee & Taken To Pln CK  2/14/2017 DONE
Intake Approval  1/31/2017 FAIL
DetailsChristina Prado
Need revised shear bracing plans, currently states TBD on plan set
Application received  1/26/2017 DONE
Application submitted via PDS Online on Jan 26 2017 1:57PM