BLD-Final | 4/18/2017 | 4/21/2017 | 4/21/2017 | A | CANC |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Final | 4/20/2017 | 4/21/2017 | 4/21/2017 | P | PART |
Jim Storey
|
|
|
please call before to meet // Tom Phone #: ###-#### A temporary occupancy is being given. While testing the fire alarm system modifications I noted that there are two different temporal cadences and solid tone horns all going at the same time. This is in both the tenant areas and the common/egress/core areas of the building which may include the second floor which is accessable by an open stair well. All notification devices are to sync both visually and audibly. This condition needs to be repaired or an upgrade agreement sought with the Boise Fire Dept as discussed. final ok for l/c pending fire sign off.
|
FIRE-Final Inspection | 4/20/2017 | 4/21/2017 | 4/21/2017 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given on the life safety until the project related fire alarm permit is addressed. While testing the fire alarm system modifications I noted that there are two different temporal cadences and solid tone horns all going at the same time. This is in both the tenant areas and the common/egress/core areas of the building which may include the second floor which is accessable by an open stair well. All notification devices are to sync both visually and audibly. This condition needs to be repaired or an upgrade agreement sought with the Boise Fire Dept as discussed.
|
FIRE-Final Inspection | 4/18/2017 | 4/20/2017 | 4/20/2017 | P | FAIL |
Troy Cobbley
|
|
|
I stopped at the project site to make contact with the contractor but could not find anyone. All doors are electronically secured. I did speak to a Pets Best representative but his supervisor was not in. No inspection performed. Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | PASS |
Jim Storey
|
|
|
Tom-ste 100 AND 101-knock on wimdow and someone will let you in Phone #: ###-####
|
Inspection Record Card- Bld | | | 3/8/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/8/2017 | | DONE |
|
|
|
|
Plan assigned to (DAF) | 2/2/2017 | 2/2/2017 | 3/6/2017 | | DONE |
David Ferguson
|
|
|
(1st done) (due 2/15 - 10 days) failed - need revised sheets
|
Routing - PLAN CHECK | 3/6/2017 | | 3/6/2017 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/6/2017 | | DONE |
|
|
|
Need GC Form and Revised Cert of Value
|
Route to Impact Fee Review | 2/15/2017 | 2/18/2017 | 2/21/2017 | | PASS |
Cindy M. Gould
|
|
|
Review requested for Commercial Permit no new square footage
|
1st review completed | | | 2/15/2017 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 2/2/2017 | | 2/15/2017 | | FAIL |
David Ferguson
|
|
|
|
Routing - PUBLIC WORKS | 2/2/2017 | | 2/3/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 2/2/2017 | | 2/2/2017 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 2/2/2017 | | PASS |
David Ferguson
|
|
|
|
Application received | | | 1/27/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 27 2017 12:31PM
|