BLD-Final | 3/6/2017 | 3/6/2017 | 3/6/2017 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by David Dexter
|
DOC - Permit Finaled | 3/6/2017 | 3/6/2017 | 3/6/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 3/2/2017 | 3/3/2017 | 3/3/2017 | A | PASS |
Jim Storey
|
|
|
Before 9:30 AM if possible, please. Phone #: ###-#### Inspection requested via web by Stephen Iovino
|
Plan assigned to (BJM) | 1/30/2017 | 1/30/2017 | 3/2/2017 | | DONE |
Brian McGowan
|
|
|
Fail- need proper detail for attachment to home.
|
Routing - PLAN CHECK | 3/2/2017 | | 3/2/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/2/2017 | | DONE |
|
|
|
all requirments met
|
Inspection Record Card- Bld | | | 3/2/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/2/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 1/31/2017 | | 2/1/2017 | | PASS |
Jeff Lowe
|
|
|
|
Routing - PLAN CHECK | 1/30/2017 | | 1/31/2017 | | FAIL |
Brian McGowan
|
|
|
Plans show eave attachment, engineering shows ledger to wall.
|
1st review completed | | | 1/31/2017 | | FAIL |
Brian McGowan
|
|
|
Plans show eave attachment, engineering shows ledger to wall.
|
Application received | | | 1/30/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 30 2017 10:03AM
|
Plans ACCEPTED BY PLAN TECH | | | 1/30/2017 | | DONE |
|
|
|
|
Intake Approval | | | 1/30/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/30/2017 | | DONE |
|
|
|
|