BLD-Final | 6/13/2017 | 6/13/2017 | 6/13/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
DOC - Permit Finaled | 6/13/2017 | 6/13/2017 | 6/13/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 6/9/2017 | 6/9/2017 | 6/9/2017 | P | NR |
Dave Hannah
|
|
|
Garage Code is 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover needs mec final first
|
BLD-Framing/Rough-in | 4/18/2017 | 4/18/2017 | 4/18/2017 | A | PASS |
Jim Sly
|
|
|
also need the energy inspection Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Energy code compliance | 4/18/2017 | 4/18/2017 | 4/18/2017 | A | PASS |
Jim Sly
|
|
|
Also need the framing reinspection Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Framing/Rough-in | 4/11/2017 | 4/11/2017 | 4/11/2017 | P | PASS |
Jim Sly
|
|
|
Kelly Phone #: ###-####
|
BLD-Wall Bracing | 3/30/2017 | 3/31/2017 | 3/31/2017 | A | PASS |
Jim Sly
|
|
|
Kelly Phone #: ###-####
|
BLD-Footing | 2/28/2017 | 3/1/2017 | 3/1/2017 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | CANC |
Jim Sly
|
|
|
Kelly Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/23/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 2/22/2017 | | DONE |
|
|
|
plan check was not signed off so Brian M signed off on it and had to change back to ready
|
Telephone call | | | 2/22/2017 | | DONE |
|
|
|
called Kelly to let know permit is ready and how much is owed
|
Routing - PLAN CHECK | 2/21/2017 | | 2/22/2017 | | PASS |
Brian McGowan
|
|
|
|
OVERRIDE | | | 2/21/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 2/15/2017 | 2/15/2017 | 2/21/2017 | | DONE |
Brian McGowan
|
|
|
2/14 - Fail - beams need to be specified, failed Planning too.
|
Plan resubmittals received | | | 2/21/2017 | | DONE |
|
|
|
resubmittals received beam calcs-took to Brian M
|
Case Summary (BLD) | | | 2/21/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/21/2017 | | DONE |
|
|
|
All Met
|
Inspection Record Card- Bld | | | 2/21/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2017 | | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (LEG) Tisha | 2/1/2017 | | 2/15/2017 | | DEFR |
Tisha Gallop
|
|
|
2/14
|
Routing - PLAN CHECK | | | 2/14/2017 | | FAIL |
Brian McGowan
|
|
|
Beams and supports in foundation must be sized and shown on plans. Verify insulation at hand stack areas.
|
1st review completed | | | 2/14/2017 | | FAIL |
Brian McGowan
|
|
|
Beams and supports in foundation must be sized and shown on plans.Verify insulation at hand stack areas.
|
Routing - MECHANICAL | | | 2/7/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 2/1/2017 | 2/4/2017 | 2/3/2017 | | PASS |
Cindy M. Gould
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - PLANNING | 2/1/2017 | | 2/2/2017 | | PASS |
Sue Cummings
|
|
|
The eave on the front entry (or anywhere else for that matter) can only hang over into the setback a maximum of 2 ft.
|
Routing - Addressing | 2/1/2017 | | 2/1/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | | | 2/1/2017 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/1/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/1/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/1/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | 2/1/2017 | | | |
|
|
|
|