Second Notice | | 9/29/2017 | 9/27/2017 | | DONE |
|
|
|
This permit finaled on the web by derek cooper
|
First Notice | 9/15/2017 | 9/15/2017 | 9/19/2017 | | DONE |
Candy A. Nichols
|
|
|
sent in mail 9-20-17
|
PubWorks Occupancy Approval | 9/18/2017 | 9/18/2017 | 9/18/2017 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 9/14/2017 | 9/14/2017 | 9/15/2017 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 9/15/2017 | 9/15/2017 | 9/15/2017 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | CANC |
Jim Sly
|
|
|
|
Routing - PUBLIC WORKS | 9/14/2017 | | 9/14/2017 | | PASS |
Brian Murphy
|
|
|
|
BLD-Energy code compliance | 8/1/2017 | 8/1/2017 | 8/1/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | CANC |
Mike Jordan
|
|
|
moved to pm, per contractor.
|
BLD-Energy code compliance | 7/28/2017 | 7/31/2017 | 7/31/2017 | P | NR |
Mike Jordan
|
|
|
Bruce Phone #: ###-####. Rescheduled for 8-1 in the a.m.
|
BLD-Framing/Rough-in | 7/28/2017 | 7/31/2017 | 7/31/2017 | A | PASS |
Mike Jordan
|
|
|
Bruce Phone #: ###-####
|
BLD-Framing/Rough-in | 7/28/2017 | 7/28/2017 | 7/28/2017 | P | NR |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
BLD-Wall Bracing | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | PASS |
Mike Jordan
|
|
|
Bruce Phone #: ###-####. Exterior shear walls and roof diaphragm ok.
|
BLD-Foundation | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PASS |
Mike Jordan
|
|
|
Bruce-pour time 12:00 Phone #: ###-####
|
BLD-Footing | 6/20/2017 | 6/22/2017 | 6/22/2017 | A | PASS |
Mike Jordan
|
|
|
Rebar - Bruce Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/17/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/17/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/11/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 2/8/2017 | 2/8/2017 | 5/11/2017 | | PASS |
Carl Westfall
|
|
|
(1st done) (Feb 28 - 15 days) (Mar 21 - 30 days) (41 sheets) Blackrock Coffee Shell
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/11/2017 | | DONE |
|
|
|
**all met except for ACHD**//leg Need revised cert of value, ACHD, RP and GC form
|
Routing - PLAN CHECK | 5/9/2017 | | 5/10/2017 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLANNING | 5/10/2017 | | 5/10/2017 | | PASS |
David Moser
|
|
|
|
Plan resubmittals received | | | 5/9/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/20/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 4/14/2017 | | 4/19/2017 | | FAIL |
David Moser
|
|
|
need to provide sidewalk right-of-way easement for sidewalk on private property.
|
Routing - PLAN CHECK | 4/13/2017 | | 4/14/2017 | | PASS |
Carl Westfall
|
|
|
Routed. Approved before.
|
Plan resubmittals received | | | 4/13/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/27/2017 | | 3/30/2017 | | PASS |
Carl Westfall
|
|
|
Approved by structural
|
Plan resubmittals requested | | | 3/30/2017 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/28/2017 | | 3/28/2017 | | PASS |
Carl Westfall
|
|
|
Chris Holladay - AHJ
|
Routing - Design Review | 3/28/2017 | | 3/28/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per the DRH.
|
Routing PW Solid Waste | 3/28/2017 | | 3/28/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLANNING | 3/28/2017 | | 3/28/2017 | | FAIL |
David Moser
|
|
|
Please upload right-of way easment to locate sidewalk on private property.
|
Plan resubmittals received | | | 3/27/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 3/21/2017 | 3/24/2017 | 3/22/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 3/21/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 3/21/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/8/2017 | | 3/21/2017 | | PEND |
Carl Westfall
|
|
|
Approved pending approval by Structural
|
Meeting | | | 3/7/2017 | | DONE |
|
|
|
Appendix J taken to Brian Mu
|
Routing PW Drainage | 2/8/2017 | | 3/3/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 2/8/2017 | | 2/20/2017 | | FAIL |
Carl Westfall
|
|
|
Chris Holliday - AHJ
|
Routing PW Solid Waste | 2/8/2017 | | 2/10/2017 | | FAIL |
Evan Carpenter
|
|
|
Enclosure not accessible for collection; unsafe for truck to back onto public streets and drive-through area not large enough for truck to turn around.
|
Routing - MECHANICAL | 2/8/2017 | | 2/10/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/8/2017 | | 2/10/2017 | | FAIL |
David Moser
|
|
|
The site plan does not match the landscape plan or the approved site plan. The landscape buffer along Ethridge Lane needs to be larger than 5 feet.
|
Routing - PLANNING Land Div | 2/8/2017 | | 2/10/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 2/8/2017 | 2/8/2017 | 2/9/2017 | | PASS |
Katie Marron
|
|
|
No comments required. Basic Life Safety.
|
Routing - PUBLIC WORKS | 2/8/2017 | | 2/9/2017 | | PASS |
Rachael Beierle
|
|
|
SHELL ONLY. T.I. SEPERATE PERMIT. 1 SFD CREDIT AVAILABLE.
|
Routing - Erosion and Sediment | 2/8/2017 | | 2/9/2017 | | PASS |
Andy J. Long
|
|
|
BMPs: Construction entrance along N Etheredge ln., ESC sign, concrete washout, staging area, hazardous materials area, spill kit, silt fence located on south side of project site, sweep streets two time per day to prevent trackout. RP is TBA.
|
Routing PW Street Lights | 2/8/2017 | | 2/9/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLUMBING | 2/8/2017 | | 2/9/2017 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC. Shell and core only.
|
Routing - Design Review | 2/8/2017 | | 2/9/2017 | | FAIL |
Sarah Schafer
|
|
|
The Site plan and landscape plan within the building permit do not match regarding front setback and sidewalk locations. David Moser contacted the applicant to correct. DRH16-00500
|
Routing - Addressing | 2/8/2017 | | 2/8/2017 | | PASS |
Laura Hunter
|
|
|
7901 W Fairview Ave address is approved
|
Intake Approval | | | 2/8/2017 | | PASS |
|
|
|
|
Application received | | | 2/3/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 3 2017 8:16AM
|
Intake Approval | | | 2/3/2017 | | FAIL |
David Ferguson
|
|
|
Provide CDHD stamped plans and application.
Complete first page of the #310 form.
Site Drainage, O&M and ESC not stamped, signed and dated by engineer.
Floor plan does not include all walls, kitchen layout, seating, etc.
Verification of Legal Lot or Parcel is not upload separately and is not signed by PDS staff.
|
Intake Approval | | | 2/3/2017 | | FAIL |
David Ferguson
|
|
|
3) Site Drainage, O&M and ESC not stamped, signed and dated by engineer as required.
|