BLD-Footing | 3/1/2017 | 3/2/2017 | 3/2/2017 | A | PASS |
Mike Jordan
|
|
|
Dan Phone #: ###-####
|
Routing Walk-In (BLD) | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 2/6/2017 | | 2/6/2017 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/6/2017 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 2/6/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 2/3/2017 | 2/3/2017 | 2/3/2017 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 2/3/2017 | 2/3/2017 | 2/3/2017 | A | FAIL |
Tisha Gallop
|
|
|
need panel detail and full engineering sheet copies showing side block information, need engineering general notes.
|
1st review completed | | | 2/3/2017 | | FAIL |
|
|
|
|
Application received | | 2/3/2017 | | | |
|
|
|
|